Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ULNRC-06880, Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008)2024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARULNRC-06502, Special Report 2019-02: Inoperability of a Seismic Instrument for Greater than 30 Days2019-05-0202 May 2019 Special Report 2019-02: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06441, SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days2018-06-0505 June 2018 SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days ULNRC-06435, Submittal of Special Report 2018-01 Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days2018-05-0202 May 2018 Submittal of Special Report 2018-01 Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days ULNRC-06406, Special Report 2017-03 for Callaway Plant, Unit 1 Regarding Inoperability of a Post Accident Monitoring (PAM) Instrument2017-12-28028 December 2017 Special Report 2017-03 for Callaway Plant, Unit 1 Regarding Inoperability of a Post Accident Monitoring (PAM) Instrument ULNRC-06368, Supplement to Special Report 2017-01 (PAM Report): Inoperability of Post-Accident Monitoring (PAM) Instruments2017-04-27027 April 2017 Supplement to Special Report 2017-01 (PAM Report): Inoperability of Post-Accident Monitoring (PAM) Instruments ULNRC-06309, Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days2016-06-0707 June 2016 Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06306, Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days2016-05-18018 May 2016 Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days ULNRC-06304, Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days2016-05-0909 May 2016 Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06162, Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day2014-12-11011 December 2014 Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day ULNRC-06098, 10 CFR 50.46 Annual and Thirty Day Report, ECCS Evaluation Model Revisions2014-03-25025 March 2014 10 CFR 50.46 Annual and Thirty Day Report, ECCS Evaluation Model Revisions ULNRC-06002, Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days2013-05-31031 May 2013 Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-05895, Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days2012-08-0808 August 2012 Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days ULNRC-05323, 30-Day Response to Plant - NRC Special Inspection Report 05000483/2006011, Dated July 14, 20062006-08-10010 August 2006 30-Day Response to Plant - NRC Special Inspection Report 05000483/2006011, Dated July 14, 2006 ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds)2005-08-11011 August 2005 Inoperable Channel 3 of the Loose Parts Detection System (Lpds) ML0516702022005-06-0909 June 2005 Special Report Meteorological Tower 10-60M Air Temperature Delta-T Inoperable ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor2004-11-10010 November 2004 Special Report on the Inoperability of Unit Vent High Range Radiation Monitor ML0426104292004-09-0303 September 2004 Special Report: Meteorological Tower 10M - 60M T Indication Inoperable ML0421702912004-07-28028 July 2004 Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable ML0407105792004-03-0404 March 2004 Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds) ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons2003-04-0808 April 2003 Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons ML0208506032002-03-15015 March 2002 Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable 2019-05-02
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARULNRC-06850, Special Report 2023-03 – Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument2023-12-21021 December 2023 Special Report 2023-03 – Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument ML23080A2932023-03-21021 March 2023 Enclosure - Special Report 23-02 ML22300A0822022-10-27027 October 2022 Special Report 2022-03, Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06745, Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days2022-05-10010 May 2022 Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06724, 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant2022-03-16016 March 2022 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant ULNRC-06708, Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days2022-01-11011 January 2022 Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days ULNRC-06668, Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days2021-07-0808 July 2021 Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days ULNRC-06618, Special Report 2020-012020-11-12012 November 2020 Special Report 2020-01 ULNRC-06542, SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days2019-11-18018 November 2019 SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds)2005-08-11011 August 2005 Inoperable Channel 3 of the Loose Parts Detection System (Lpds) ML0516702022005-06-0909 June 2005 Special Report Meteorological Tower 10-60M Air Temperature Delta-T Inoperable ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor2004-11-10010 November 2004 Special Report on the Inoperability of Unit Vent High Range Radiation Monitor ML0426104292004-09-0303 September 2004 Special Report: Meteorological Tower 10M - 60M T Indication Inoperable ML0421702912004-07-28028 July 2004 Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable ML0407105792004-03-0404 March 2004 Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds) ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons2003-04-0808 April 2003 Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons ML0208506032002-03-15015 March 2002 Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable 2023-03-21
[Table view] |
Text
- 1 - Is AmerenUE PO Box 620 Callaway Plant Fulton, MIO65251 September 3, 2004 U.S. Nuclear Regulatory Commission Attn
- Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC0505 1 wameren UF DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 SPECIAL REPORT METEOROLOGAL TOWER 1OM - 601 AT INDICATION INOPERABLE Ladies and Gentlemen:
Enclosed is a Special Report documenting the Inoperability of 10 Meter - 60 Meter Meteorological Monitoring Instrumentation on the Primary Meteorological Tower in accordance with Final Safety Analysis Report 16.3.3.3, and the actions taken to restore this circuitry to an Operable status.
If you have any questions or require additional information, please contact Mr. Mark Reidmeyer, Supervisor, Regional Regulatory Affairs at (573) 676-4306.
Sincerely, Keith D. Young Manager Regulatory Affairs Enclosure
" j--
a subsidiary of Ameren Corporation
ULNRC05051 September 3, 2004 Page 2 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 760114005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Mr. Jerry B. Uhlmann Director Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102
ULNRC05051 Enclosure September 3, 2004 Page 1 of 2 ENCLOSURE, Special Report The Meteorological Instrumentation Limiting Condition For Operation (LCO) (Section 16.3.3.3 of FSAR) specifies the meteorological monitoring instrumentation channels required to be operable at all times. This includes the ambient air temperature difference between the 60 meter and 10 meter levels of the tower, 60-10 Delta-T (DT). With one or more required meteorological monitoring channels inoperable for more than 7 days, LCO Action 'a' requires a Special Report to be submitted to the Commission within the next 10 days outlining the cause of the malfunction and the plans for restoring the channel(s) to an operable status. In addition to the technical specification required 60-10 DT instrument, Callaway has a 90-10 DT instrument as well.
Problem description:
On August 23, 2004, Callaway's contract meteorologist identified a problem with the Primary Tower's 10 meter reference temperature, starting with the rain which began on
'the evening of August 19, 2004. The data appeared to be slightly offset low, compared with the Secondary Tower, and noisy when compared with its previous signal condition.
With additional input from the meteorologist, the 10 meter reference temperature, the 60-10 meter DT, and the 90-10 meterDT were declared Inoperable effective 2100 on August 19, 2004. A plant work document, W240061, was written to troubleshoot the noise and offset.
A troubleshooting plan was developed and is currently being pursued. Because this appeared to be a noise issue, a recently identified shielding issue was pursued first. A potential ground loop in the instrument cable shields has been identified. Due to several days of rain, making it unsafe to work on the tower, the work on the shielding issue was not completed until August 26th. Based on a review of the data on August 27, this work did not have any impact on the noise or offset. The noise disappeared around 2 am on August 28, 2004, which has made it difficult to identify the source of the noise.
There is indication of the noise on mornings when there is heavy fog, but the data does not have the same characteristic spiking as the previously identified noise.
The cause of this noise could not be correlated to any work activities, external interference (such as owls or buzzards), or meteorological conditions. The noise disappeared from the data during the night following a significant storm on August 27-28.
AmerenUE will continue the troubleshooting plan to resolve the noise and offset problem. All of the aspirators, thermistors, and aspirator cables were replaced in July 2004, which provided all new equipment back to the tower terminal boxes. This corrected the DT offsets previously identified by the contract meteorologist. Therefore, the tower terminal boxes and cables back to the equipment rack were not replaced.
. - I -
ULNRC05051 Enclosure September 3, 2004 Page 2 of 2 Operability requirements:
The bases for the specification states:
The OPERABILITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
The 60-10 DT instrument channel is used as a measure of atmospheric stability for dose projections. Specifically, the 10 meter reference temperature provides the electronic reference for the 60-10 meter DT instrument channel, as well as the non-technical specification 90-10 meter DT channel. The DT data is used as a measure of atmospheric stability in dose assessment models for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere.
Callaway has a diverse method of determining the atmospheric stability class using any of four calculated sigma theta values derived from the wind direction instruments.
Therefore, alternate methods were available to fulfill this function when the 60-10 DT or 90-10 DT instrument channels were out of service. Callaway maintained the capability to perform dose projections throughout this period.
Plans for restoration to Operable status:
In addition to the work previously mentioned, AmerenUE is pursuing replacing cards in the racks, cleaning terminals and then recalibrating the instrumentation. Due to this new problem with noise, we are also pursuing a cable and termination replacement from the tower terminal boxes back to the instrument rack. This work will be pursued in parallel with the continued troubleshooting being performed.