Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submits Status of Generic Safety Issues at Plant,Per Generic Ltr 90-04". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20057A267  + (Submits Status of Drss Action on Natl Program Review Exit Interview Recommendations)
  • TXX-4525, Submits Status of Dynamic & Seismic Qualification of safety-related Electrical & Mechanical Equipment. Qualification & Installation of balance-of-plant Analog Control Sys & Series 7300 Process Protection Sys Complete  + (Submits Status of Dynamic & Seismic Qualification of safety-related Electrical & Mechanical Equipment. Qualification & Installation of balance-of-plant Analog Control Sys & Series 7300 Process Protection Sys Complete)
  • ML20071K341  + (Submits Status of Efforts & Decription of Progress Made Re Drawing Control.Onsite Bldg Renovation Accomplished,Required Procedure Changes Completed & Reproduction & Drafting Equipment Received)
  • ML19208C664  + (Submits Status of Efforts Re Meeting W/Parties to Discuss Intervenors State of Il & B Rorem Et Al Contentions.Suggests Schedule Allowing Parties Sufficient Time to Meet,Negotiate & Specify Positions)
  • ML20204F067  + (Submits Status of Efforts to Dispose of Matls Under License SNM-1308.Arrangements Made W/Us Ecology,Inc for Consultant Svcs on Packaging,Shipping & Disposal of Matl)
  • ML13310B401  + (Submits Status of Efforts to Incorporate Latest Westinghouse Owners Group Recommendations Into Reactor Trip Breaker Maint Program,Per Generic Ltr 83-28.Discrepancies Between Current & Recommended Program Will Be Corrected by 840715)
  • ML17277B298  + (Submits Status of Emergency Preparedness License Requirements for Operation Exceeding 5% Power,Including TMI Item I.D.1 Re Emergency Response Capability & Offsite Emergency Preparedness,Per SER & Sser 4)
  • ML20153F184  + (Submits Status of Emergency Response Training Program,Per 860219 Emergency Preparedness Meeting.Training of Key Emergency Response Mgt Personnel Will Be Completed Prior to Fuel Load.Nrc Will Be Informed of Progress Monthly)
  • ST-HL-AE-2287, Submits Status of Emergency preparedness-related Open Items, Including Open Items 86-35-16 Re post-accident Sampling sys- RCS Sampling & Analysis & 86-35-32 Concerning Prompt Notification Sys  + (Submits Status of Emergency preparedness-related Open Items, Including Open Items 86-35-16 Re post-accident Sampling sys- RCS Sampling & Analysis & 86-35-32 Concerning Prompt Notification Sys)
  • ML20054F303  + (Submits Status of Engineering Studies Resulting from Nuclear Safety Task Force Recommendations Re 800226 Transient)
  • ML19351A064  + (Submits Status of Environ Qualification Efforts in Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment, Per .Evaluations Being Conducted to Determine Applicability of Test Data to Plant Equipment)
  • ML20215N644  + (Submits Status of Environ Qualification of Equipment within Scope of 10CFR50.49 Rule,Per SER Open Item 1.Confirms That Equipment Is in Compliance W/Rule Except for Qualification of Listed Vol Boosters.Boosters Will Be Evaluated by 861201)
  • SNRC-1082, Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting  + (Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting)
  • ML20197F580  + (Submits Status of Evaluation by Coastal Engineering Research Ctr Re Facility Intake Structure Flooding - Breakwater Damage)
  • ML18141A290  + (Submits Status of Evaluation of NUREG-0737,Item II.D.1.2 Re Safety & Relief Valve Discharge Piping.Completion of Final Engineering Expected in 1984)
  • ML19320D164  + (Submits Status of Extensive Survey Program Initiated in Response to IE Bulletin 80-11.Accounts for Half of Masonry Walls Requiring Insp.Remaining Items Will Be Covered in Final Rept to Be Submitted After Completion of Surveys)
  • ML20003E030  + (Submits Status of Facility OL Application in Response to Re O Burnham 810115 Concerns.Ser Issued on 810206.Supplemental SER Will Be Issued in Apr 1981.Hearing Process Scheduled for Completion in June 1982)
  • ML19347F917  + (Submits Status of Facility Review.Fuel Loading Scheduled for Oct 1982.DES Scheduled for 810508 & SER for 810529.Suggests SER Issuance Be Postponed Until 810604 to Close Out Encl Open Items,Thereby Avoiding ACRS Rejection)
  • ML20050D885  + (Submits Status of Fire Protection Issues,Per 820406 & 07 Telcons W/Nrc)
  • ML19347A841  + (Submits Status of Fire Protection Mods & Details of Certain Mods Which Cannot Be Completed Per Original Schedule.List of Items Requiring Extended Schedules Encl)
  • ML17334A421  + (Submits Status of Five Areas in Each Plant Protected W/Carbon Dioxide Suppression Sys,But W/O Dampers in All Ventilation Openings.Design Review Continues)
  • ML20195G202  + (Submits Status of Followup & Close Out of Cprrg Recommendations.Related Info Encl)
  • ML20195G472  + (Submits Status of Followup & Closeout of Comanche Peak Rept Review Group Recommendations as of 880901.Related Info Encl)
  • ML20195G467  + (Submits Status of Followup & Closeout of Comanche Peak Rept Review Group Recommendations as of 880801.Related Info Encl)
  • ML20195G475  + (Submits Status of Folowup & Closeout of Comanche Peak Rept Review Group Recommendations as of 881001.Related Info Encl)
  • ML17286A429  + (Submits Status of Generic Safety Issues at Plant,Per Generic Ltr 90-04)
  • ML20212M430  + (Submits Status of Geology & Seismology Portion of OL Safety Review.Suppl to Geology & Seismology Safety Evaluation Expected by Oct 1974.Issuance of SER on Subj Delayed for 3 Wks.Summary of 740705 Meeting Encl)
  • ML19340C342  + (Submits Status of Geotechnical Review by Corps of Engineers. One Reviewer Made Cursory Examination of Info & Visited Both plants.Three-man Review Team Needed to Accomplish Review.Dod 800201 Internal Memo Encl)
  • ML20117P719  + (Submits Status of IE Bulletin 85-003 Review for Region I Plants as of 870501,listing Most Recent Utility Response & NRC Correspondence.Definitions of Terms Used & Addl Notes & Listing of Other Relevant Correspondence Also Encl)
  • ML20203L932  + (Submits Status of Impact Assessment of Updated Seismic Hazard.Schedule for Completing Assessment Provided in Encl 1)
  • ML17258A343  + (Submits Status of Implementation of NUREG-0737 Requirements. Items II.B.2 & II.F.1.6 Re Plant Shielding & Containment Hydrogen Monitoring Sys,Respectively.Implementation Will Not Be Completed by 820101 as Required)
  • ML18142A058  + (Submits Status of Implementation of Reactor Vessel Level Instrumentation Sys,Upgrade of Emergency Operating Procedures & Core Exit Thermocouple Upgrade,Per NUREG-0737, Item II.F.2 Requirements)
  • CEO-89-218, Submits Status of Implementation of TMI Action Plan Items at Plant in Response to Commission .Crdr Complete & Implementation Scheduled for Cycle 9 Refueling Outage  + (Submits Status of Implementation of TMI Action Plan Items at Plant in Response to Commission .Crdr Complete & Implementation Scheduled for Cycle 9 Refueling Outage)
  • ML19340C326  + (Submits Status of Indicator Piles as of 780808.Soft Spot Found Through Auxiliary Bldg Does Not Constitute Major Problem)
  • ML18086B281  + (Submits Status of Installation & Testing of Prompt Alerting & Notification Sys.Util Continuing to Correct Minor Problems W/Individual Sirens in Nj & DE & Siren Activation Equipment for Sirens in DE)
  • ML20041C182  + (Submits Status of Installation of Public Notification Sys. Installation & Testing Expected Prior to 820226)
  • ML20009G306  + (Submits Status of Installation,Calibr,Qualification & Testing of Reactor Vessel Level Indication Sys Per TMI Item II.F.2,inadequate Core Cooling,In Response to NRC Request Re Util)
  • ML17326B476  + (Submits Status of Internal Conduit Fire Seal Program in Response to Insp Repts 50-315/85-13 & 50-316/85-13. Proprietary Conduit Fire Protection Research Program, Final Rept Encl.Rept Withheld)
  • U-602766, Submits Status of Investigation Into Inappropriate Use of Solder Flux as Related to MCR Neon Light Socket Failures at Plant.Addl Checks Will Be Performed to Confirm Scope of Affected Work Documents  + (Submits Status of Investigation Into Inappropriate Use of Solder Flux as Related to MCR Neon Light Socket Failures at Plant.Addl Checks Will Be Performed to Confirm Scope of Affected Work Documents)
  • ML20239A656  + (Submits Status of Investigation,Per 870225 Petition Re Plant Cables.Util Task Group Working to Resolve Cable Problems.Nrc Has Assigned Project Engineer to Monitor Effort & Provide Assessment of Extent of Problems & Adequacy of Resolutions)
  • RBG-22293, Submits Status of Justification for Interim Operation. Environ Qualification of Air-Operated Valves 144 & 145 Complete.Updated Table Reflecting Qualification of Equipment Encl  + (Submits Status of Justification for Interim Operation. Environ Qualification of Air-Operated Valves 144 & 145 Complete.Updated Table Reflecting Qualification of Equipment Encl)
  • ML20074A201  + (Submits Status of License Condition 2.C(4)(c).Facility Currently in Second Refueling Outage.New Rosemount Resistance Temp Detector (RTD) Model 176KS Will Be Installed Until Redesigned RTD Available)
  • ML19296C598  + (Submits Status of Meterological & Design Info,In Response to NRC 800111 Request Re Facility Near Site Study.Provides Info Re Radiation Levels & Expected Dosages in Accessing Reactor Cavity During Refueling & Maint)
  • SNRC-1038, Submits Status of Mods Re High Radiation Isolation Signal to Purge Valves & Automatic Depressurization Sys Logic,In Response to NRC Request,Per NUREG-0737,Items II.E.4.2 & II.K.3.18.Related Correspondence  + (Submits Status of Mods Re High Radiation Isolation Signal to Purge Valves & Automatic Depressurization Sys Logic,In Response to NRC Request,Per NUREG-0737,Items II.E.4.2 & II.K.3.18.Related Correspondence)
  • ML20004E969  + (Submits Status of Mods Re IE Bulletin 80-15 Which Suppl .Loss of Offsite Power Will Not Affect unit- Preferred Sys Output)
  • ML20087J728  + (Submits Status of Mods to Improve Adequacy of Station Distribution Sys Voltages,Per Util & NRC 821029 Ser.All Mods Completed,W/Exception of Changes to Station Air Compresser Starting Circuit)
  • ML18003A647  + (Submits Status of NRC Evaluation of Random Rockfill Tests. Random Rockfill Complete.Awaiting Test Results for Main Dam Rockfill)
  • ML19343B507  + (Submits Status of NRC Review of Facility Fire Protection. Updated Status of Fire Protection Items Is Needed for Application of App R.Schedules for Implementation Encl)
  • ML20198K025  + (Submits Status of NRR PRA Training Program.It Should Be Noted That Basic PRA Training Courses Held Prior to Oct 1997 Have Not Included Discussions on Risk Informed Regulatory Guidance Documented in RGs & SRPs)
  • ML20039E379  + (Submits Status of NUREG-0737 Items II.B.1,II.B.2,II.B.3, II.D.1.2,II.D.3,II.F.1,II.F.2,II.K.3.13,II.K.3.22,II.K.3.24, II.K.3.30 & III.A.1.2)
  • ML18139B878  + (Submits Status of NUREG-0737 Items Per Generic Ltr 82-05. Current Status of Items II.B.2 Re Plant shielding,II.B.3 Re post-accident sampling,II.E.1.2 Re Auxiliary Feedwater Initiation & II.F.1 Re Monitoring Instrumentation Encl)