Submits Status of NRC Review of Facility Fire Protection. Updated Status of Fire Protection Items Is Needed for Application of App R.Schedules for Implementation Encl
ML19343B507
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/04/1980
From: Martin R
Office of Nuclear Reactor Regulation
To: Benaroya V
Office of Nuclear Reactor Regulation
References
NUDOCS 8012240101
Download: ML19343B507 (4)


Text

.

[1 j

NUCLEAR REGULATORY COMMISSION o,

UNITED STATES

+

c a

WASHINGTON, D. C. 20066

( *.

,/

December 4, 1980

y. g b

Docket Noi 50-36S Pl N

s., -

i

1..

EyS

?

7h MEMORANDUM FOR:

V. Benaroya, Chief r

Chemical Engineering Branch, DE

.Eg N

r THRU:

R. A. Clark, Chief a

~

Operating Reactros Branc #3, DL FROM:

R. E. Martin, Project Manager Operating Reactors Branch #3, DL

SUBJECT:

ANO-2 FIRE PROTECTION An updated scorecard on the status of the ANO-2 fire protection items is needed so we can manage the application of Appendix R to ANO-2.

The licensee has requested it so they know more clearly what to respond to. We wish to address by this memo only the status of the staff's review and approval of these items. Status of the licensee's implementation of these items at the plant is another subject.

The twenty (20) areas of fire protection review listed on page 3-4 of the FPSER are categorized below. Based on my consnunications with R. Ferguson and S. Hudson of the CEB I am proceeding with the ANO-2 fire protection program on the assumption that these items are correctly categorized.

If that is not a correct assumption please advise.

I.

These items were approved in the FPSER, did not require additional information for NRC to evaluate, do not appear to require further evaluation pursuant to Appendix R and are therefore believed to be l

closed.

l 3.1 Radio Equipment 3.3 Protection from Water Spray 3.12 Fire Dampers j

3.13 Portable Extinguisher for C.R.

3.16 Portable Smoke Exhaust Equipment 3.19 Control of Fire Doors 3.20 Administrative Control Changes II. These items were explicitly approved in our letters of April 25, 1980 and November 5,1980 and no further question regarding their meetir.g Appendix R exists.

3.14 Smoke Detectors 3.15 Manual Hose Stations 3.18 RCP Oil Collection System 8012240 /o f

. III. These items were explicitly identified as unresolved in our November 5,1980 letter to the licensee based on our evaluation against Appendix R.

The licensee must resolve these items in accordance with Enclosure 1.

i 3.4 Cables in MCC Room 3.5 Cables in Hallway 3.8 Cables in Electrical Equipment Room 3.9 Cables in Lower South Electrical Penetration Room 3.10 Cables in Upper South Piping Penetration Room i

IV These items were either explicitely approved by prior staff letters to the licensee (3.6) or were not addressed at all beyond the FPSER bt.t are believed to be the subject of the backfitting of Aprendix R requirements. The licensee must resclve in accordance with Enclosurc 1.

3.2 Cables in Manholes 3.6 Cables in Cable Spreading Room 3.7 Cables in Equipment Room 3.11 RPS Cables 3.17 Emergency Lighting idLf 5/ a 5 i

Robert E. Martin, Project Manager Operating Reactors Branch #3 Division of Licensing

Enclosure:

1.

Schedules for Implementation Appendix R Items 2.

Schedules for Implementation 1

Non Appendix R Items i

1

';t

h=rrr.r aez...

Schedules for Implementation Appendix R Items

?

e Administrative Items - 30 days after effective date of Appendix R III.E., H.,

I., K.

e Items not requiring shutdown or NRC approval III.C.*, D. *, F. *, J., M., N.*

9 months after effective date of Appendix R e Items requiring shutdown but not NRC approval III. A., B., C., D., F., L., N., 0., G.I. & 2.

a First ' refueling outage First planned outage of 60 days or greater" a

First unplanned outage of 120 days or greater a - Commencing at least 180 days after effective date of Appendix R.

. Items requiring NRC approval III.G.3.

Dedicated shutdown - 30 months after NRC approval.

Modifications not requiring shutdown - 6 months. after NRC approval Modifications requiring shutdown b

First refueling outage b

First planned outage of 60 days or greater b

First unplanned outage of 120 days or greater b - Comencing at least 180 days after NRC approval a

  • For areas accessible during operation and work activities do not affect safety-related or operations-related equipment l

l;;Ja;

' ma_e k "3k Schedules for Implementation Non Appendix R Items (Approved in FPSER or Supplements) e Administrative 4 months after NRC approval e Modifications not requiring shutdown 12 months after NRC approval e Modifications requiring shutdown c

First refueling outage First planned outage of 60 days or greater c

First unplanned outage of 120 days or greater c - Commencing 9 months or more after NRC approval e Modifications for dedicated shutdown system 30 months after NRC approval OR:

date specified in License Condition whichever is sooner UNLESS:

Director of Nuclear Reactor Regulation grants extension not to exceed dates for similar items under Appendix R or exemption Required Findings:

. Good cause for extension e No adverse effect on public health or safety t