  • ML20210M733  + (Revised Interim Deficiency Rept DER 85-38,R1 Re GE QA Audit. Initially Reported on 851108.Final Rept Delayed Until 860514)
  • ML20039F249  + (Revised Interim Deficiency Rept Re Bingham-Williamette Auxiliary Feedwater Pumps seize-up During Maint,Initially Reported 810818.Caused by Galling of Stainless Steel Ctr Stage Piece & Shaft Sleeve.Final Rept by 820218)
  • ML20084K037  + (Revised Interim Deficiency Rept Re Design of HPCS Interfaces to Suppression Pool Cleanup Sys Not Completed.Initially Reported on 840216.Gilbert Assoc Continuing Evaluation of Condition.Next Rept Will Be Submitted by 840608)
  • ML20054F890  + (Revised Interim Deficiency Rept Re Failure of Turbine Driven Pump to Provide Auxiliary Feedwater Flow within 10-s of Motor Driven Pump Failure,Initially Reported on 810626.C-E/ Bechtel Final Rept Will Be Submitted by 820923)
  • ML20033D045  + (Revised Interim Deficiency Rept Re Failure to Use Hardened Washers W/Bolts Tightened by Calibr Torque Wrench,Initially Reported in 810512 Telcon.Itt Grinnell Tests to Verify Effects on Performance Continuing.Next Rept by 820226)
  • ML20069C160  + (Revised Interim Deficiency Rept Re Pressurizer Missing Lockwires on Cover Plate Cap Screws,Originally Reported 811203.Submittal of Final Rept Delayed to 820421 Due to Extensive Investigation & Evaluation)
  • ML20063P557  + (Revised Interim Deficiency Rept Re Pullman Pipe for Main Feedwater Lines W/Multiple Linear Indications or Laminations.Final Rept Will Be Submitted by 821123)
  • ML20236W623  + (Revised Interim Fracture Mechanics Analysis,Welds 02BS-S5 & 02BS-S9)
  • ML22266A093  + (Revised Interim Handbook on Nuclear Material Events Reporting in the Agreement States - Revised Interim Procedure SA-300)
  • ML20084J753  + (Revised Interim Part 21 & Deficiency Rept Re Failure of HPSI Isolation Valves Supplied by Borg-Warner to Open Against HPSI Pump a & B Flows.Initially Reported on 830920. Reevaluation Incomplete.Next Rept by 840720)
  • ML20045E145  + (Revised Interim Part 21 Rept 93-007 Re EOPs & Guidance Provided by BWROG in Rev 4 of BWROG Symptomatic Epgs. Potential Defect Evaluated & Changes Made to Operator Training.Final Part 21 Rept Will Be Issued by 930723)
  • ML071830233  + (Revised Interim Report for Completed Analyses for Twelve Soil Samples from Oyster Creek (Inspection Report No. 50-219/2006-05) from Orise Dtd 5/4/07)
  • ML20009E811  + (Revised Interim Rept of Significant Const Deficiency 29 Re Inadequate Clearance Between Process Piping Sys & box-type Pipe Supports/Restraints,Initially Discovered on 810423. As-built Gaps Will Be Measured & Analyzed & Mods Performed)
  • ML20086Q760  + (Revised Interim SER on Effects of Fuel Rod Bowing on Thermal Margin Calculations for Lwrs)
  • ML20041D467  + (Revised Interim Significant Const Deficiency Rept 44 Re LPSI Pump Suction Valves.Editorial Correction Made to Description Section of Rept)
  • ML20081B348  + (Revised Interim Significant Deficiency Rept SD 413-414/82-06 Re Socket Welds .Required Work on Unit 1 Completed.Unit 2 Incomplete Due to Incomplete List of Affected Socket Welds.Completion Expected by 850201)
  • ML15352A192  + (Revised Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation)
  • ML20211B238  + (Revised Interjurisdictional Policy for Songs)
  • ML13316A327  + (Revised Interjurisdictional Policy for Songs)
  • Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User'S Manual  + (Revised International Nuclear And Radiological Event Scale User'S Manual)
  • Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User's Manual  + (Revised International Nuclear And Radiological Event Scale User's Manual)
  • Information Notice 2009-27, Revised International Nuclear and Radiological Event Scale Users Manual  + (Revised International Nuclear and Radiological Event Scale Users Manual)
  • ML20069J776  + (Revised Interrogatories & Requests for Production of Documents)
  • ML20028B305  + (Revised Interrogatory 47.Svc List Encl)
  • ML19308A164  + (Revised Introduction,Sections 2.5.1 & 2.5.4,to SRP for the Review of Safety Analysis Repts for Nuclear Power Plants)
  • ML20055C671  + (Revised Issue 3 to Nuclear QA Program Manual)