List of results
- ML20210M733 + (Revised Interim Deficiency Rept DER 85-38,R1 Re GE QA Audit. Initially Reported on 851108.Final Rept Delayed Until 860514)
- ML20039F249 + (Revised Interim Deficiency Rept Re Bingham-Williamette Auxiliary Feedwater Pumps seize-up During Maint,Initially Reported 810818.Caused by Galling of Stainless Steel Ctr Stage Piece & Shaft Sleeve.Final Rept by 820218)
- ML20084K037 + (Revised Interim Deficiency Rept Re Design of HPCS Interfaces to Suppression Pool Cleanup Sys Not Completed.Initially Reported on 840216.Gilbert Assoc Continuing Evaluation of Condition.Next Rept Will Be Submitted by 840608)
- ML20054F890 + (Revised Interim Deficiency Rept Re Failure of Turbine Driven Pump to Provide Auxiliary Feedwater Flow within 10-s of Motor Driven Pump Failure,Initially Reported on 810626.C-E/ Bechtel Final Rept Will Be Submitted by 820923)
- ML20033D045 + (Revised Interim Deficiency Rept Re Failure to Use Hardened Washers W/Bolts Tightened by Calibr Torque Wrench,Initially Reported in 810512 Telcon.Itt Grinnell Tests to Verify Effects on Performance Continuing.Next Rept by 820226)
- ML20069C160 + (Revised Interim Deficiency Rept Re Pressurizer Missing Lockwires on Cover Plate Cap Screws,Originally Reported 811203.Submittal of Final Rept Delayed to 820421 Due to Extensive Investigation & Evaluation)
- ML20063P557 + (Revised Interim Deficiency Rept Re Pullman Pipe for Main Feedwater Lines W/Multiple Linear Indications or Laminations.Final Rept Will Be Submitted by 821123)
- ML20236W623 + (Revised Interim Fracture Mechanics Analysis,Welds 02BS-S5 & 02BS-S9)
- ML22266A093 + (Revised Interim Handbook on Nuclear Material Events Reporting in the Agreement States - Revised Interim Procedure SA-300)
- ML20084J753 + (Revised Interim Part 21 & Deficiency Rept Re Failure of HPSI Isolation Valves Supplied by Borg-Warner to Open Against HPSI Pump a & B Flows.Initially Reported on 830920. Reevaluation Incomplete.Next Rept by 840720)
- ML20045E145 + (Revised Interim Part 21 Rept 93-007 Re EOPs & Guidance Provided by BWROG in Rev 4 of BWROG Symptomatic Epgs. Potential Defect Evaluated & Changes Made to Operator Training.Final Part 21 Rept Will Be Issued by 930723)
- ML071830233 + (Revised Interim Report for Completed Analyses for Twelve Soil Samples from Oyster Creek (Inspection Report No. 50-219/2006-05) from Orise Dtd 5/4/07)
- ML20009E811 + (Revised Interim Rept of Significant Const Deficiency 29 Re Inadequate Clearance Between Process Piping Sys & box-type Pipe Supports/Restraints,Initially Discovered on 810423. As-built Gaps Will Be Measured & Analyzed & Mods Performed)
- ML20086Q760 + (Revised Interim SER on Effects of Fuel Rod Bowing on Thermal Margin Calculations for Lwrs)
- ML20041D467 + (Revised Interim Significant Const Deficiency Rept 44 Re LPSI Pump Suction Valves.Editorial Correction Made to Description Section of Rept)
- ML20081B348 + (Revised Interim Significant Deficiency Rept SD 413-414/82-06 Re Socket Welds .Required Work on Unit 1 Completed.Unit 2 Incomplete Due to Incomplete List of Affected Socket Welds.Completion Expected by 850201)
- ML15352A192 + (Revised Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation)
- ML20211B238 + (Revised Interjurisdictional Policy for Songs)
- ML13316A327 + (Revised Interjurisdictional Policy for Songs)
- Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User'S Manual + (Revised International Nuclear And Radiological Event Scale User'S Manual)
- Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User's Manual + (Revised International Nuclear And Radiological Event Scale User's Manual)
- Information Notice 2009-27, Revised International Nuclear and Radiological Event Scale Users Manual + (Revised International Nuclear and Radiological Event Scale Users Manual)
- ML20069J776 + (Revised Interrogatories & Requests for Production of Documents)
- ML20028B305 + (Revised Interrogatory 47.Svc List Encl)
- ML19308A164 + (Revised Introduction,Sections 2.5.1 & 2.5.4,to SRP for the Review of Safety Analysis Repts for Nuclear Power Plants)
- ML20055C671 + (Revised Issue 3 to Nuclear QA Program Manual)
- ML20055C674 + (Revised Issue 3 to QA Program Manual)
- ML20055C673 + (Revised Issue 3 to QA Program Manual)
- ML20055C672 + (Revised Issue 3 to QA Program Manual)
- ML20055C670 + (Revised Issue 4 to QA Program Manual)
- ML20055C668 + (Revised Issue 4 to, QA Program Manual)
- ML20084R110 + (Revised Issues of Concern to City of Philadelphia Re Emergency Planning.State Disaster Operations Plan,Annex E Inadequate.Certificate of Svc Encl)
- ML20150E295 + (Revised Item SM 86-055 for 10CFR50.59 Rept for 860101-870607)
- ML022310401 + (Revised James A. Fitzpatrick Emergency Plan Implementing Procedures. Includes Emergency Plan Implementation Checklist IAP-1, Revision 27, Table of Contents - Attachment B)
- ML022310417 + (Revised James A. Fitzpatrick Emergency Plan Implementing Procedures. Includes Emergency Plan Implementing Procedure, Offsite Notifications, EAP-1.1, Revision 46, Table of Contents - Attachment 1)
- ML022310439 + (Revised James A. Fitzpatrick Emergency Plan Implementing Procedures. Includes Emergency Plan Implementing Procedure, Dose Assessment Calculations, EAP-4, Revision 31 - SAP-20, Revision 21)
- ML18186A683 + (Revised Kansas Response to 2018 Impep Questionnaire)
- ML031540558 + (Revised Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures)
- ML20132F872 + (Revised LACBWR Decommissioning Plan)
- ML20202J069 + (Revised LACBWR Decommissioning Plan)
- ML20207A959 + (Revised LACBWR Decommissioning Plan)
- ML20202J078 + (Revised LACBWR Initial Site Characterization Survey for Safstor)
- ML20216D584 + (Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only)
- ML20249B416 + (Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2)
- 05000244/LER-1976-007, Revised LER 76-07/30:on 760207,relays for Train a Containment Isolation & Ventilation Isolation Failed to Latch.Caused by MG-6 Relays Having Improper Latch Screw Factory Adjustment + (Revised LER 76-07/30:on 760207,relays for Train a Containment Isolation & Ventilation Isolation Failed to Latch.Caused by MG-6 Relays Having Improper Latch Screw Factory Adjustment)
- ML19329F982 + (Revised LER 77-ZZZ/01T-2:on 770805,during Hot Functional Testing,Pressurizer Power Operated Relief Valve Was Opened & Severe Movement of Discharge Piping Was Observed.Caused by Loop Seals Allowing Water Slug to Cause Pipe Movement)
- 05000346/LER-1979-105, Revised LER 79-105/01T-1:on 791109,during Review of IE Bulletin 79-21 Response,Noted Steam Generator Low Level Trip Setpoints to Steam & Feedwater Rupture Control Sys Channels 1 & 2 Were Below Tech Specs.Caused by Error in Poin + (Revised LER 79-105/01T-1:on 791109,during Review of IE Bulletin 79-21 Response,Noted Steam Generator Low Level Trip Setpoints to Steam & Feedwater Rupture Control Sys Channels 1 & 2 Were Below Tech Specs.Caused by Error in Points)
- 05000313/LER-1981-014, Revised LER 81-014/01T-1:on 811119,diesel Generator 1 Lockout Relay Tripped Rendering Generator Inoperable.Caused by Alarm Flag Dropping on Generator Relay 187-DG1 C Phase High Speed Differential Relay + (Revised LER 81-014/01T-1:on 811119,diesel Generator 1 Lockout Relay Tripped Rendering Generator Inoperable.Caused by Alarm Flag Dropping on Generator Relay 187-DG1 C Phase High Speed Differential Relay)
- ML20028D229 + (Revised LER 81-045/03X-1:on 810730,after Unit Trip,Three Action Statements Entered.Auxiliary Feedwater Pump 1-2 Did Not Operate Properly.Shield Bldg Integrity Lost When Panel Blown Out.Main Steam Safety Valve Lifted at Low Setpoint)
- 05000346/LER-1981-061, Revised LER 81-061/03X-2:on 811003 & 20,absolute Position Indication on Group 4,rod 7 Became Erratic,Fluctuating 5-10% of Full Range.Caused by Loss of Electrical Penetration Module Signal.Module Replaced + (Revised LER 81-061/03X-2:on 811003 & 20,absolute Position Indication on Group 4,rod 7 Became Erratic,Fluctuating 5-10% of Full Range.Caused by Loss of Electrical Penetration Module Signal.Module Replaced)
- 05000346/LER-1981-064, Revised LER 81-064/03X-3:on 811012 & 13,pump for Re 5028, post-accident Containment Radiation Monitor,Failed.Caused by Decreased Flow Due to Pump Vane Wear.Maint Step Added to Check & Set Flow Weekly.Redundant Sys Operable Duri + (Revised LER 81-064/03X-3:on 811012 & 13,pump for Re 5028, post-accident Containment Radiation Monitor,Failed.Caused by Decreased Flow Due to Pump Vane Wear.Maint Step Added to Check & Set Flow Weekly.Redundant Sys Operable During Event)
- 05000278/LER-1982-021, Revised LER 82-021/01P:on 821101,3A Reactor Bldg Vent Stack Radiation Monitor Found to Have Less than Desired Sensitivity.Caused by Drift in Channel Voltage Plateau. Monitor Calibr & Returned to Svc + (Revised LER 82-021/01P:on 821101,3A Reactor Bldg Vent Stack Radiation Monitor Found to Have Less than Desired Sensitivity.Caused by Drift in Channel Voltage Plateau. Monitor Calibr & Returned to Svc)
- 05000278/LER-1982-022, Revised LER 82-022/01X-1:on 821025-1102,RHR HX 3D Leaked Slightly Radioactive Water Into Intake Structure.Caused by Expansion Bellows Leak Between Inner Floating Head & Drain. HX Repaired + (Revised LER 82-022/01X-1:on 821025-1102,RHR HX 3D Leaked Slightly Radioactive Water Into Intake Structure.Caused by Expansion Bellows Leak Between Inner Floating Head & Drain. HX Repaired)