- h P O. BOX 5000 CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBLICSOUARE Samng The Best Location in the Nation MURRAY R. EDELMAN u cu$n '"

April 30, 1984

_1, y.

.- /

T l___

{L

!g /

Mr. Jamed G. Keppler l._ l_.

. -- {

Regional Administrator, Region III p.i Office of Inspection and Enforcement I

- t U.S. Nuclear Regulatory Commission L' _.._ _ I i!

I s 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 IIPCS Interfaces to the Suppression Pool Clean-up System [RDC 99(84)]

Dear Mr. Keppler:

This letter serven to inform you that our evaluation of the deficiencies concerning design of the Illgh Pressure Core Spray (IIPCS) interfaces to the Suppression Pool Clean-up System has not yet been completed.

Mr. P. R. Pelke of your of fice van notifled on February 16, 1984, by Mr. B. D. Walrath of The Cleveland Electele Illuminating Company (CEI) that this problen was being evaluated, and an interim report, dated March 16, 1984, was also submitted.

This discrepancy was identifled during a safety system functional capability review performed for CEI by CDS Associaten. This letter contains a revised description of the deficiency and the date for filing of the next report on this subject.

Dencription of Deficiency The nonnnfety-related Suppression Pool Clenn-up (SPCU) System takes auction from the high pressure core spray nuction vin clean-up pump suction pool valve r22-F015. The IIPCS System will automatically start upon a 1.evel 21.ons of Coolant Accident (1.0CA) signal but the clenn-up pump nuction valven close on a 1.evel 1 1.0CA nignal per elementary diagram B-208-065.

In thin situation, the llPCS pump will experience opponing pump suction from the SPCU pump.

In addition, due to tha non-neinmic clannification of the SPCU system, this nituntion would create n non-aninmic interface with the llPCS nyntem.

k!)O OOO O

d6g 0

PDH

\\$0 9 0 L

r. J:mes G. K pplcr April 30, 1984 Evaluation Completion Our Architect / Engineer, Gilbert Associates, Inc., is continuing their evaluation of this condition and we will submit our next report on this subject by June 8, 1984.

Please call if there are any questions.

Sincerely, Murray R. Edelman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director Of fice of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.