|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 TXX-9424, LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor1994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency ML20073B6491994-09-19019 September 1994 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Change Into Licensee Units 1 & 2 TSs ML20072C3591994-08-12012 August 1994 LAR 94-014 to Licenses NPF-87 & NPF-89,revising Administrative Controls to Reflect Organizational Changes 1999-08-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212L1501999-09-30030 September 1999 Amends 72 & 72 to Licenses NPF-87 & NPF-89,respectively, Changing Thermal Rated Power in Paragraph 2.C.(1) of FOL NPF-89 & TS 1.1 to 3445 Megawatts Thermal for Cpses,Unit 2 ML20212G8061999-09-22022 September 1999 Amends 71 & 71 to Licenses NPF-87 & NPF-89,respectively, Revising TSs for Cpses,Unit 1 to Define F* SG Tube Plugging Criteria in TS 5.5.9 & Associated Reporting Requirements in TS 5.6.10 ML20212G8361999-09-22022 September 1999 Amends 70 & 70 to Licenses NPF-87 & NPF-89,respectively, Changing TS 3.4.13,TS 5.5.9 & TS 5.6.10 to Implement 1.0 Volt SG Tube Repair Criteria for Cpses,Unit 1 ML20216F9311999-09-21021 September 1999 Amends 69 & 69 to Licenses NPF-87 & NPF-89,respectively, Revising SR 3.8.1.13, AC Sources- Operating to Clarify That Each Edg,Automatic,Noncritical Trips Bypassed on Either loss-of-offsite or Safety Injection Actuation Signal ML20211K0071999-08-31031 August 1999 Amends 68 & 68 to Licenses NPF-87 & NPF-89,respectively, Changing Licenses to Accurately Reflect New Legal Name of Licensee, Txu Electric Co ML20211J9461999-08-30030 August 1999 Amends 67 & 67 to Licenses NPF-87 & NPF-89,respectively, Removing Several cycle-specific Parameter Limits from TS & Adding Parameter Limits to COLR ML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20210N1581999-08-0303 August 1999 Amends 66 & 66 to Licenses NPF-87 & NPF-89,respectively, Correcting Number of Editorial Errors in TSs That Occurred with Issuance of License 64 Re ITSs Conversion TXX-9916, Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs1999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20205F9631999-04-0101 April 1999 Corrected Amend 64 to Licenses NPF-87 & NPF-89,respectively. Three Pages from TS Bases Section Were Inadvertently Omitted TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 TXX-9819, Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld1998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld ML20248A1891998-05-22022 May 1998 Amends 60 & 46 to Licenses NPF-87 & NPF-89,respectively, Revising Section TS 3/4.8.1 to Reduce Min Fuel Oil Volume Requirements During Modes 5 & 6 for Operable EDG & Allow Continued Operable Status of DG During All Modes ML20216C3521998-05-0808 May 1998 Amends 59 & 45 to Licenses NPF-87 & NPF-89,respectively, Allowing One Time Basis Verification of Proper Operation of Unit 2 Load seal-in Contacts & DG Trip Bypass Contacts at Power & Crediting Performance of SR 4.8.1.1.2f.4 ML20217D3501998-04-20020 April 1998 Amends 58 & 44 to Licenses NPF-87 & NPF-89,respectively, Changing TS Re Load Shedding Feature of Motor Control Ctr & Auto Connected shut-down Loads Through Load Sequencer ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217H9171998-03-27027 March 1998 Amends 57 & 43 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves TXX-9807, LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power1998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212G7731997-10-30030 October 1997 Amends 55 & 41 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints Based on Analyses of Core Configuration for Unit 2 Cycle 4 ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS ML20210M6131997-08-18018 August 1997 Amends 54 & 40 to Licenses NPF-87 & NPF-89,respectively, Revising TS 3.7.1.5 to Increase AOT for One Inoperable MSIV While in Mode 1 TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 RT Setpoint TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20129D9291996-10-22022 October 1996 Amends 53 & 39 to Licenses NPF-87 & NPF-89,respectively, Changing Acceptance Values for Ameres & Voltage for 18 Month Surveillance Test of Battery Chargers ML20129E4761996-09-30030 September 1996 Amends 52 & 38 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & New N-16 Setpoint Values & Parameters for Unit 1 & Ref to TR RXE-95-001-P ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B7061996-06-25025 June 1996 Errata to Amends 51 & 37 to Licenses NPF-87 & NPF-89, Respectively,Correcting TS Pp 6-7 for Plant Units 1 & 2 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info ML20114E3681996-06-13013 June 1996 Amends 51 & 37 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Reflect Approval for Use of New Containment Leakage Rate Testing Program ML20101L0711996-04-0101 April 1996 Amends 49 & 35 to Licenses NPF-87 & NPF-89,respectively, Revising Core Safety Limit Curves & Revised Overtemperature Reactor Trip Setpoints ML20106H7401996-03-18018 March 1996 Amends 48 & 34 to Licenses NPF-87 & NPF-87,respectively, Allowing Both Doors of Containment Personnel Airlock to Be Open During Fuel Movement & Core Alterations,Providing One Airlock Door Capable of Being Closed & Water Level Maint ML20101D0541996-03-14014 March 1996 Amends 47 & 33 to Licenses NPF-87 & NPF-89,respectively, Revising TS to Allow Testing of RPS & Esfa Instrument Channels W/Channel Under Test in Bypass in Order to Reduce Vulnerability to Spurious Trips During Surveillance Testing 1999-09-30
[Table view] |
Text
- =ll: T:l=:
O.
<. =
Log # TXX 98066 y
File # 916 (3/4.8) g Ref. #
R 50.90 10 CFR 50.36 c.x nery s,,ae, vie, r,,,m,,,
March 9, 1998
& PrincipalNancieer Oficer U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC'20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 REVISION TO LICENSE AMENDMENT REQUEST 98 002 A.C. POWER, OPERATING REF: 1) TU Electric Letter, logged TXX 98049, from C. L. Terry to the NRC dated February 20. 1998 i
- 2) TU Electric Letter, logged TXX 98050, from C. L. Terry 1
to the NRC dated February 25. 1998 Gentlemen:
In references 1 and 2 TU Electric requested a temporary change to the CPSES Units 1 and 2 Technical Specifications. The proposed temporary change to the Technical Specifications removed the requirement to demonstrate the load shedding feature of MCC XEB4 3 as part of Surveillance Requirements (SRs)
'4.81.1.2f.4)a) and 4.8.1.1.2f.6)a) until the plant startup subsequent to the next refueling outage for each respective unit or until an outage of sufficient duration to properly schedule and perform the test. This temporary change was requested as a result of the failure to confirm the load shedding feature of MCC XEB4 3 during the last performance of these SRs for the Unit 1 and Unit 2 train B diesel generators'(DGs).
Subsequently, it was determined that the surveillances had been satisfactorily performed for Unit 1.
The requested change to the Technical specifications submitted in License Amendment Request (LAR) >8 002 (reference
- 2) and the Enforcement Discretion-(reference 1) is thereforr. revised such that it applies to Unit 2 only.
1 In addition, based on discussions with the NRC staff, the footnote added to i
the affected technical specification page is revised.
The footnote phrase, "or earlier outage of sufficient duration to properly schedule and perform the test" is revised to indicate a specific outage duration. The revised wording states "or the next Unit 2 outage greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in duration."
+1 O
' is the required affidavit. Attachment 2 to LAR 98 002 as
/
revised, provides a detailed description of the proposed change, a safety
' analysis of the change, and TU Electric's determination that the proposed change does not involve a significant hazard consideration. Attachment 3 to COMANCHE rEAK STEAM ELECTRIC STATION 9903170145 9
?"
h, i
PDR ADOCK OSOOO445L i
P PDR a
TXX 98066 Page 2 of 2
\\
LAR 98-002 as revised, provides the affected Technical Specification page, marked up to reflect the proposed change.
The license amendment request (LAR 98 002 as revised) should be effective up1n issuance to be implemented immediately.
In accordance with 10CFR50.91(b). TU Electric is providing the State of Texas with a copy of this proposed amendment.
Should you have any questions, please contact Mr. Bob Dacko at (254) 897 0122.
This communication contains no new licensing basis commitments regarding j
CPSES Units 1 and 2.
Sincerely, j
C. L. Terry By:
N Roger %. Walker Regulatory Affairs Manager BSD/bd Attachments-1 1.
Affidavit 2.
Description and Assessment 3.
Affected Technical Specification page as revised by all approved license amendments c-E. W. Herschoff, Region IV J. I, Tapia, Region IV T. J. Polich, NRR Resident Inspectors CPSES Mr. Arthur C. Tate Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin, Texas 4
~
~
Attachient l'to TXX 98066 Page 1 of 1 i
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Texas Utilities Electric Company
)
Docket Nos.
50 445
)
50 446 (Comanche Peak Steam Electric
)
License Nos. NPF 87
-Station. Units 1 & 2)
)
NPF-89 AEf.1DAYII Roger D. Walker. _being ' duly sworn, hereby deposes and says that he is Manager of Regulatory Affairs for TU Electric, the licensee herein: that he is duly authorized to sign and file with the Nuclear Regulatory Commission this License Amendment Request 98 002 (as_ revised); that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge. information and belief.
Of4P.4 2:
Togef D. Walker Regulatory Affairs Manager STATE OF TEXAS
)
COUNTY OF h ))
Subscribed and sworn to before me, on this T
dayofMaRek[TN.
bout)[d Notary Public 9commwon axons DONALD R. WOOOLAN Notory Public state of Tm 494s l
i i
I J
ATTACHMENT 2 to TXX 98066 DESCRIPTION AND ASSESSMENT 1
i I
0- to TXX 98066 Page,1 of 3 DESCRIPTION AND ASSESSMENT.
I.
BACKGROUND While performing a review of surveillance procedures in.accordance with U.S. NRC Generic Letter 96-01, it was determined that the surveillance I
procedures for Surveillance Requirements 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a) were deficient in that the load shedding of one electrical bus on Unit 2 had not previously been demonstrated. The surveillances
- required that upon a loss of offsite power..the emergency busses de energize and load shedding occurs. The current procedure for the train B diesel generator (DG) for Unit 2 does not require confirmation that bus XEB4 3 load sheds.
TV Electric confirmed that failure to load shed this bus would not result in the diesel generator being inoperable. The diesel has sufficient reserve capacity to emergency start and perform its safety functions with this bus loaded at time zero in the diesel generator loading sequence. TU Electric believes that this specification only requires testing of the
- loads which are required to be load shed to allow the DG to perform its specified safety functions. Because the diesel generator remains capable of performing its specified safety functions without the load shed of this bus. TU Electric concluded that the surveillance had been met.
In subsequent discussions with NRR. the NRC staff expressed the opinion that even though the staff did not see a safety problem or issue. CPSES was not in literal compliance with these Surveillance Requirements.
Based on the feedback received from the NRC staff. TU Electric chose the conservative action of declaring the Surveillance Requirements as missed and invoking the requirements of Technical Specification 4.0.3 for a missed surveillance.
This change does not impact the improved Technical Specifications because it is a temporary change and it is plant specific.
II.
DESCRIPTION OF TECHNICAL SPECIFICATIONS CHANGE REQUEST This LAR requests a temporary Technical Specification change which removes the requirement to demonstrate the load shedding feature of MCC XEB4 3 as part of SRs 4.8.1.1.2f.4)a) and 4.8.1.1.2f.6)a) until the plant startup subsequent to the next refueling outage for Unit 2 or the next Unit 2 outage greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in duration.
III. ANALYSIS The safety function of the A.C. Sources is to ensure that sufficient power will be available to supply the safety related equipment required for: (1) the safe shutdown of the facility, and (2) the mitigation and control of j
accident conditions within the facility. The function of the Surveillance Requirement of concern is to demonstrate that for a start of the diesel generators, the emergency busses will de energize and sufficient load will be shed to allow the diesel generator to start. connect to the emergency
, to TXX-98066 Page,2 of 3 i
be shed to allow the diesel generator to start, connect to the emergency busses and load. Because the bus in question can be loaded on the diesel generator at time zero of the loading sequence without affecting the ability of the diesel generator to properly start, connect to the emergency bus'and load, the diesel generator's safety function is not adversely affected.
Failure to test the load shed feature with respect to this single load has no impact on safety. TU Electric concludes that this change is safe and acceptable.
IV SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS TU Electric has evaluated whether or not a significant hazards consideration is involved with the proposed changes by focusing on the three standards set forth in 10CFR50.92(c) as discussed below:
1.
Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
The only potential impact of operating without having demonstrated the load shedding feature of MCC XEB4 3 is the potential that the train B DG for CPSES Unit 2 will not be able to perform its safety function following a postulated accident or event. TU Electric has evaluated the potential load added to the DG if this bus does not shed and has concluded that the DG remains fully capable of performing its safety function. As a result, there is no significant increase in the probability or consequences of an accident previously evaluated.
2.
Do the proposed changes create the possibility of a new or differant
)
kind of accident from any accident previously evaluated?
Operation without havi..; tested the load shedding feature of bus XEB4 3 does not effect the operation or design of the plant and therefore cannot create the possibility of a new or different kind of accident from any accident previously evaluated.
3.
Do the proposed changes involve a significant reduction in a margin of safety?
Because the diesel generator remains fully capable of performing its safety functions without having demonstrated the load shedding feature of MCC XEB4-3. there is no significant reduction in a margin of safety.
Based on the above evaluations, TV Electric concludes that the activities associated with the above described changes present no significant hazards consideration under the standards set forth in 10CFR50.92(c) and, accordingly, a finding by the NRC of no significant hazards consideration is justified.
i i
~
. to TXX-98066
)
Page 3 of 3=
1 I
V.
ENVIRONMENTAL EVALUATION TU Electric has determined that the proposed amendment would change requirements with res act to the installation or use of a facility i
component located wit 11n the restricted area, as defined in 10CFR20, or J
would change an inspection or surveillance requirement. TV Electric has evaluated the proposed changes and has determined that the changes do not involve (1) a significant hazards consideration, (ii)'a significant' change in the types or significant increase in the amounts of any effluent.that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10CFR51.22(c)(9). Therefore, pursuant.to 10CFR51.22(b), an environmental assessment of proposed change is not required.
j l