'v+-d..
Docktt Nos. 50-528/529/530 50.5S(6) Report'
(*-
.)
~
M M M MC
(.
3
~
3003 p.o. sox 21666 PHOENIX, ARIZONA 85036 STA; September 30, 1982 ANPP-21925-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reactor Projects Branch 1 Subj ect:
Interim Report, Revision 1 - DER 82-29 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman Pipe for Units 2 and 3 Main Feedwater Lines Has Multiple Linear Indications or Laminations File: 82-019-026 D.4.33.2
Reference:
(A) Telephone Conversation between T. Bishop and G. Duckworth on June 17, 1982 (B) ANPP-21410, dated July 15, 1982 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A) and an Interim Report.was transmitted by Reference (B).
-At that-time, it was estimated that a Final Report would be available by September 30, 1982.
Due to the extensive investigation and evaluation required, a revised Interim Report is attached.
It is now expected that this information will be finalized by November 23, 1982, at which time a complete report will be submitted.
Very truly yours, g
~
T.\\(ca m
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/ GHD:db Enclosure y,
.l wL -
..J MJ m; s
cc: See Attached Page 2 N
0 9
S PDR x
-U. S. Nuclear Regulatory Commission September 30, 1982
' Attention:
Mr. D. M. Sternberg, Chief ANPP-21925-GHD/BSK.
Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement
.U. S. Nuclear Regulatory Commission Washington, D._C. 20555 T. G. Woods,-Jr..
J. A. Roedel D. E. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.
Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503
e INTERIM REPORT - REVISION 1 - DER 82-29 POTENTIAL' REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
P_VNGS UNITS 2 & 3 I. POTENTIAL PROBLEM The four (4) following nonconformance reports were initiated as a result of examinations made in compliance with the Pre-Service Examina-tion Program (PSE). Based on the results of these inspections, this Deficiency Evaluation Report was initiated to evaluate whether the piping material being received from Pullman Power Products (P.O.
Specification 13-FM-201) contained generic material defects.
1.
NCR: PC-4031, MT Examination, Spool No. 3-SG-005-S011 Removal by Bechtel of a linear indication resulted in the discovery of a large lamination which has reduced the minimum wall to.800 inches. Other multiple linear indications were also observed on this spool. The design office calculation for this particular spool indicates that the minimum allowable wall thickness is
.555 inches.
2.
NCR: PC-4047, Visual Inspection, Spool No. 2-EC-064-S018 Removal by Bechtel of a linear indication resulted in a minimum wall thickness being reduced to.106 inches.
The design office calculation for this particular spool indicates that the minimum allowable wall thickness is.079 inches.
3.
NCR: PY-4059, Visual Inspection, Spool No. 2-CT-044-S004
[
Removal by Bechtel of a linear crack resulted in the minimum wall thickness being reduced to.195 inches. The design office calcula-i tion for this particular spool indicates that the minimum allowable wall thickness is.070 inches.
l_
4.
NCR: PC-4436, UT Examination, Piping Spool 2-SG-042-S001 L
i Weld SG-042-W001 failed ASME Section XI U.T. Examination because of l
laminar indication of 9.67 sq. inches at a depth of.85 inches; wherein, the acceptance criteria for this condition would be 4.0 l
sq. inches for 2-inch thick material. However the indication l
lies outside'the lower one-third T Examination Volume and it also lies inside the weld and heat affected zone of the weld. The weld and heat affected zone had previously been accepted to ASME Section III Radiographic Examination requirements.
l t
1 l
Interim Report - Revision 1 - DER 82-29 Page 2 II. APPROACH TO.*JiD STATUS OF PROPOSED RESOLUTION The conditions noted on Nonconformance Reports PC-4031, 4047 and PY-4059 have been dispositioned as not safety significant since minimum wall requirements were not violated.
The condition noted on Nonconformance Report PC-4436 requires additional review since it was recently included with this DER, and Bechtel Engineering requires time to complete the disposition.
III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT Evaluation of this condition and submittal of the Final Report is forecast to be completed by November 23, 1982.