Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101N307 + (Notifies NRC Staff of Correction to Components,Make Up Second Allowance Re Reactor Trip Sys Instrumentation Response Times)
- ML20099L814 + (Notifies NRC Staff of Minor Change to Approved Analysis Methodology Uses for FSAR Chapter 15 Analyses to Support Plants)
- BSEP-97-0409, Notifies NRC Staff of Revision of CP&L Commitment Re Administrative Limits for Reactor Coolant Dose Equivalent Iodine for Bsep,Unit 1.NRC Will Be Notified When Leakage Testing Activities Are Completed + (Notifies NRC Staff of Revision of CP&L Commitment Re Administrative Limits for Reactor Coolant Dose Equivalent Iodine for Bsep,Unit 1.NRC Will Be Notified When Leakage Testing Activities Are Completed)
- ML20203C973 + (Notifies NRC Staff of Util Intentions to Maintain Present Setpoint Re AMSAC C-20 Interlock Permissive)
- ML20024H091 + (Notifies NRC That 23 Licenses Mentioned in Have Only Nominal Quantities of Matl Remaining)
- ML20062F949 + (Notifies NRC That 24-hour Sample of Fish Impingement Basket for 781112 Was Accidentally Discarded & Lost)
- ML19263C034 + (Notifies NRC That 6 of 37 Fuel Regions Will Be Replaced. Tests Show That Operation of Core for Up to 200 Effective Full Power Days Is Acceptable.Revised Base Reactivity Curve for Extended Cycle Will Be Forwarded After Refueling)
- ML19270E834 + (Notifies NRC That 781105 Reportable Occurence Rept 50-368/78-11 Did Not Need to Be Prepared,As Previously Thought.Requests RO Number Be Voided)
- ML19318A219 + (Notifies NRC That 800411 Final Part 21 Rept Re Unqualified Motor Operator for Turbine Driven Auxiliary Feedwater Pump Was Also Intended to Satisfy 10CFR50.55(e) Reporting Requirements)
- ML20081L763 + (Notifies NRC That Actions Committed Re Supplemental Response to Generic Ltr 89-13 Completed for Unit 1.Encl Outlines Actions Taken)
- ML20096F031 + (Notifies NRC That Actions Committed in Response to Generic Ltr 89-13 Have Been Completed for Unit 2.Actions Taken Outlined in Encl)
- ML20085L031 + (Notifies NRC That Actions Re GL 89-10, Safety Related MOV Testing & Surveillance, Completed on 950520 for Unit 2 Valves)
- ML20112H508 + (Notifies NRC That Actions a Through H in GL 89-10 Completed W/Exceptions Listed)
- ML20129A723 + (Notifies NRC That Address of C-E Changed by Town of Windsor, Without Any Change in Physical Location of Facility)
- ML20151Z622 + (Notifies NRC That All Requested Actions Contained in GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Bwrs, Have Been Implemented at CNS)
- ML20070M564 + (Notifies NRC That All Safety Significant Dcrdr Design Changes Completed as Required by NUREG-0737)
- NOC-AE-000068, Notifies NRC That Am Adams,Sro License 42608,addition of Restriction,Effective 971229.W/o Attachment + (Notifies NRC That Am Adams,Sro License 42608,addition of Restriction,Effective 971229.W/o Attachment)
- ML20097D357 + (Notifies NRC That Amato Resumed Licensed Duties on 920421, Per Physician Approval,Effective 920317 & Informing NRC of Amato Removal of Licensed Duties Due to Temporary Physical Disability)
- NSD-NRC-98-5796, Notifies NRC That Approved Process in WCAP-12488-A Being Used to Account for Design Mods for 17X17 Rfa with Ifm Grid Design as Required by Fcep SER + (Notifies NRC That Approved Process in WCAP-12488-A Being Used to Account for Design Mods for 17X17 Rfa with Ifm Grid Design as Required by Fcep SER)
- NOC-AE-000398, Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved + (Notifies NRC That Assessments of Effects of Fuel Rod Internal Pressure on 17% Oxidation Criterion of 10CFR50.46 Will Continue for Future Refueling Cycles Until Industry Issue Is Resolved)
- ML20062C150 + (Notifies NRC That Average Release Rate for Radioactive Matls w/half-lives Greater than 8 Days Between 780701 & 0930 Was 2.03 Times Tech Spec 3.8.B.3.C(l) Design Objective. Evaluation of Main Chimney Release Rate Initiated)
- ML20034E598 + (Notifies NRC That B&W Fuel,Inc,Minority Partner in B&Wfc Intends to Withdraw from Partnership & Sell All Interests to Two Current Partners.Requests That NRC Approves Transfer of Partnership Interests)
- ML20196C744 + (Notifies NRC That Barber-Colman Industrial Instruments Did Not Transfer Any Byproduct Matl for 960901-1231)
- ML20196C782 + (Notifies NRC That Barber-Colman Industrial Instruments Did Not Transfer Any Byproduct Matl for 960901-1231)
- ML20097A507 + (Notifies NRC That Barbiturates,Benzodiazepine & Propoxyphene Will No Longer Be Included in Drug Screening Program as of 960201)
- TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 + (Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727)
- ML20064F464 + (Notifies NRC That Changes in 2 Setpoints of Plant Protec Sys Have Been Incorp Into Plant Procedures,Due to Replacement of Transmitter from Different Manufacturer)
- ML19290C578 + (Notifies NRC That Citizens for Environ Values Supports Moratorium on Licensing of Nuclear Power Plants & on North Anna 2 in Particular,Until New Rules Insuring Safety Can Be Written)
- ML20095C049 + (Notifies NRC That Code Repairs Have Been Completed on SWS Line 1802-5-152-24 Field Weld SW-1802-F0801)
- ML17310A835 + (Notifies NRC That Commitment Made in to Shut Down Unit 3 by No Later than 931126 Being Revised.Revised Date to Begin Shut Down Will Be No Later than 931204)
- ML17229A576 + (Notifies NRC That Commitment to Install Redundant Wide Range SG Level Instrument W/Independent Lower Tap on Plant During SG Replacement Outage Was Completed)
- ML17229A577 + (Notifies NRC That Commitment to Install Redundant Wide Range SG Level Instrument W/Independent Lower Tap on Plant During SG Replacement Outage Was Completed)
- ML19316B046 + (Notifies NRC That Confusion Has Arisen W/Respect to NRC Regulations & Time Frame for Implementation.Requests Immediate Clarification to Avoid Delay in Implementation)
- ML19320D287 + (Notifies NRC That Containment Isolation valve,CAV-1 Is Functional Effective 800712.Past Provisions of Tech Spec 3.0.4 Are Applicable)
- ML20196C177 + (Notifies NRC That Crescent Electric Transferred One Isolite Exit Sign to Safety Light Corp,Bloomsburg,Pa on 980505)
- NRC-98-0121, Notifies NRC That DE Has Fully Implemented Amends 121,122 & 123.Implementation Dates for Amends,Listed + (Notifies NRC That DE Has Fully Implemented Amends 121,122 & 123.Implementation Dates for Amends,Listed)
- ML20237A157 + (Notifies NRC That DOE Is Ready to Transfer Regulatory Authority for South Annex of Building X-705 at Portsmouth Gaseous Diffusion Plant)
- ML20072F457 + (Notifies NRC That Date Identified on Ltr Transmitting Units 1 & 2 TS Change Request 93-23-0,incorrect.Licensees Providing Ltr to Correct Inadvertent Error & Apologizes for Any Inconvenience Error May Have Caused)
- ML19269C943 + (Notifies NRC That Despite Requested Date of 790213 for Submittal of Radiological Effluent Tech Specs,Earliest Possible Date for Submittal Is 790312)
- ML19322A064 + (Notifies NRC That Document SS15A18/A, Portable Fire Extinquishers-Sys Specs Is Being Forwarded to Us Coast Guard for Review & Approval)
- ML20148C339 + (Notifies NRC That Documents Still Being Collected for Files Supporting Documentation for Results Rept VII.a.9 & Collective Significance Rept for Public Insp.Licensee Will Provide NRC Notice of Availability When Documents Are Ready)
- 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 + (Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331)
- HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed + (Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed)
- ML17229A618 + (Notifies NRC That FPL Has Determined Exemption from 10CFR73.55(d) Requirements, Access Requirements, Issued on 931129,re Changes to 10CFR73.55(d)(5) That Were Effective on 980116,(62FR6364))
- ML19323F991 + (Notifies NRC That Facilities Have Been Redesignated from Kori 3 & 4 to Knu 5 & 6.Original License Now Reads Knu 5 & 6)
- ML19253A286 + (Notifies NRC That Facility Does Not Use Target Rock Safety Relief Valves & Will Not Act Upon 790716 Request for Info)
- ML13317B276 + (Notifies NRC That Facility Revised Program Response Document Required by Generic Ltr 89-10, Safety-Related Motor Operated Valve Testing & Surveillance Available for NRC Review)
- ML20090K714 + (Notifies NRC That Facility Will Complete Inner Personnel Air Lock Door Equalizing Valve Mod by 920601)
- ML19323D003 + (Notifies NRC That Final Ecological Monitoring Rept Will Be Provided by 800701.Four of Six Sections of Rept Have Been Completed & Are Being Reviewed)
- ML19250A649 + (Notifies NRC That Final Status Rept Re Faulty T Welds Reported in 790612 Deficiency Rept Will Be Issued 60 Days After Repair & Ultrasonic Test)
- ML19263A736 + (Notifies NRC That Firm Now Represents the North Shore Committee Against Nuclear & Thermal Pollution & Requests All Relevant Info Re Proceedings Be Sent)