Notifies NRC That Commitment to Install Redundant Wide Range SG Level Instrument W/Independent Lower Tap on Plant During SG Replacement Outage Was Completed
ML17229A576
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/05/1998
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A577 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 L-98-7, NUDOCS 9801130326
Download: ML17229A576 (4)


Text

CATEGORY 1 REGULA' INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9801130326 FACXL:50-335 St. Lucie DOC.DATE: 98/01/05 NOTARIZED: YES Plant, Unit 1, Florida Power 6 Light Co.

DOCKET 05000335 I

AUTH. NAME . AUTHOR AFFILIATION STALL,J.A. Florida Power & Light Co.

RECXP.NAME RECIPIENT AFFILIATION j Document Control Branch (Document Control Desk)

SUBJECT:

Notifies NRC that commitment was completed during SG replacement/refueling outage (SL1-15) .Commitment was transmitted by FPL ltr L-92-28,dtd 920203 6 later modified by FPL ltr L-95-149 dtd 950523.

4 DXSTRXBUTXON CODE: A002D COPTER RECEXVED:LTR I ENCL ( SXEE: I + 2.

TITLE: OR Submittal:Inadequate Core Cooling (Item II.F.2) GL 82-28 E

NOTES:

~

RECIPZENT COPIES 'ECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: ACRS 1 1 E CENTE 01 1 1 NRR/DSSA/SRXB 1 1 RES DE 1 1 RES/DET/EIB 1 1 RES/DSXR/RPSB 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

C' E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

/o-Florida Power 5 Light Company. 6351 S. Ocean Drive. Jensen Beach, FL 34957 January 5, 1998 L-98-7 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 1 Docket No. 50-335 Regulatory Guide 1.97 Wide Ran e Steam Generator Level Commitment In response to NRC letter dated November 12, 1991, Florida Power A Light Company (FPL) made a commitment to install a redundant wide range steam generator level instrument with an independent lower tap on St. Lucie Unit 1 during the steam generator replacement outage. The commitment was transmitted by FPL letter L-92-28, dated February 3, 1992 and later modified by FPL letter L-95-149, dated May 23, 1995.

The purpose of this letter is to notify the NRC that the commitment was completed during the steam generator replacement/refueling outage (SL1-15).

Please contact us if there are any questions.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9801130326 980105 PDR" ADQCK 05000335 P PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company