Arizona Public Service Company.
PAI.O VERDE NUCLEAR GENERATING STATION P.O. BOX $2M
~
PHOSNIXe ARIZONAN072-2034 JAMES M. LEVIIIE VICE PAESIdfNT VCLfARPAddVCTldM 102-02734-JMLlRAB/JRP November 23, 1993 B. H. Faulkenberry Regional Administrator, Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite.-21 0 Walnut Creek, CA 9
References:
3.
4596-5368 Letter 102-02654, dated September 29, 1993, from W. F. Conway, Executive Vice President, Nuclear-, APS, to USNRC 2.
Letter dated October 4, nCiIIIiIIi~tIaLVI,riagivii V, President, Nuclear, APS 1993, from 8, H. Faulkenberry, Regional
~ eAh IPIPI J ill f A
~ ~ ee
~
~ ~ es
~
Ceerase ele ~ ~ eee Klehh 3.'etter 102-02688, dated October 12, 1993, from W. F. Conway, Executive Vice President, Nuclear, APS, to USNRG 4
Letter dated November 8, 1993, from 8, H. Faulkenberry, Regional Administrator, Region Y, USNRC, to NI. F. Conway, Executive Vice President, Nuclear,'PS
Dear Mr. Faulkenberry:
SubJect:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-630 Steam Generator Action Plan Feil eF eeee'.
ln Reference 1, Arizona Public Service Company (APS), notified the NRC of their intention to shut down Unit 3 to perform Eddy Current Test inspections in both Steam Generators by. no later than November 26, 1993.
The NRC acknowledged this commitment in Reference 2, as amended by Reference 4, and required APS to notify the staff in writing if for any reason APS cannot complete, the actions specified in Reference 1.
93i2030i88 93i123 PDR ADOCK 05000528 P
PDR,.
h5V 23 '"93 ee:31 COf'IPLIANCE P.3 B. H. Faulkenberry Regional Administrator, Region Y U. S. Nuclear Regulatory Commission Steam Generator Action Plan Page 2 This letter is being provided pursuant to References 2 and 4 to notify the NRC in writing that the commitment made in Reference 1 to shut down Unit 3 by no later than November
~
<8, 1993,!s being revised.
The revised data ta begin shut down of Unit 3 willbe no later than December 4, 1993.
The reason for the extension is the delay in startup of Unit 1 from its refueling outage.
The justification for the continued operation of Unit 3 until the proposed midcycle outage was previously submitted'to the NRC by Reference 3.
ln addition, NRC has been kept informed of the current steam generator leakage on Unit 3, which is currently stable at approximately 0.84 gallons per day.
This leakage is being monitored by tritiumsampling from the condensate effluent, and should a sudden change in the leak rate be observed, APS would immediately reevaluate continued operation of Unit 3.
Should you have any questions, please call Richard A. Bernier at (602) 393-5882.
Sincerely, JML/RAEI/JRP/rv cc:
W. F. Conway B. E. Holian J. A, Sloan Document Control Desk - Original
MQV.3 '93 CB: 31 COMPLIANCE P.4 STATE OF ARIZONA
)
) ss.
COumV OF MARICOPA )
I, J.
M. Levine, represent that I am Vice President Nuclear Production, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and
- belief, the statements made therein are true and correct.
J. M. Levine Sworn To Before Me Thia/5 Day Of),'lriCP.'
- 1993, Notary Public My Commission Expires I r r r
~
e
~
I