N Nebraska Public Power District Nebraska's Energy Leader NLS980143 September 14,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Implementation of Generic Letter 94-02 Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46

Reference:

1.

Generic Letter 94-02 dated July 11,1994,"Long-Term Solutions and Upgrade ofInterim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors" 2.

Letter NLS940039 to USNRC from G. R. Horn (NPPD) dated September 9,1994, " Generic Letter 94-02, Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46" 3.

Letter NLS970001 to USNRC from G. R. Horn (NPPD) dated February 10,1997," Proposed Change to CNS Technical Specifications, Implementation of BWR Thermal Hydraulic Stability Solution, Cooper Nuclear Station, NRC Docket No. 50-298, License No.DPR-46" l

4.

Letter from J. R. Hall (USNRC) to G. R. Horn (NPPD) dated July 29,1998,

" Cooper Nuclear Station-Amendment No.177 to Facility Operating License No. DPR.46 (TAC No. M98015)"

Gentlemen:

By letter dated July 11,1994 (Reference 1), the NRC requested that BWR licensees review their current procedures and training programs and modify them as appropriate to strengthen the administrative provisions intended to avoid power oscillations or to detect and suppress them if j

they occur prior to implementation of the long-term solution. By letter dated September 9,1994-

)

(Reference 2), the Nebraska Public Power District (District) provided its response to the two

]

Requested Actions contained in Reference 1. Reference 2 described how the District meets the l

requirements of Requested Action 1, and submitted to the NRC a plan for addressing the long-term stability corrective actions, which related to Requested Action 2.

1 9909220044 990914 PDR ADOCK 05000298 P

PDR

.3(,OO Cooper Nudear Station v

V ^

PO. Box 98/ Brownville, NE 683210098 4.s Telephone: (402) 825-3811/ Fax: (402) 825-5211 httpf/www.nppd com

.=

-NLS980143 September 14,1998 Page 2 of 3 By letter dated February 10,1997 (Reference 3), the District proposed a change to the Cooper Nuclear Station (CNS) Technical Specifications to implement the BWR thermal hydraulic stability solution. This change was subsequently approved by the NRC as License Amendment No.177 (Reference 4); and was implemented by CNS on August 15,1998. In accordance with the reporting requirements of Generic Letter 94-02 (Reference 1), this letter is to notify the NRC that all the Requested Actions contained in Reference 1 have been implemented at CNS.

Should you have any questions or comments, please contact me.

Sincerel,

f

(.

Jo'm H. Swailes Vice President of Nuclear Energy

/rss cc:

Regional Administrator w/ attachment USNRC Region IV NRC Resident Inspector w/ attachment i

Cooper Nuclear Station 1

Project Manager - Cooper w/ attachment USNRC-NRR NPG Distribution w/o attachment i

i 1

I

.=..

NLS980143 September 14,1998 Page 3 of 3 STATE OF NEBRASKA

)

)

NEMAHA COUNTY

)

Michael F. Peckham, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public r awer District; and that the statements contained herein are true to the best of his knowledge and belief.

m WKCo 9tichael F. Peckham Subscribed in my presence and sworn to before me this / 4 day of Se A fer />er; 1998.

~

eENBW,N01W4Ws of Nakash My Comm If,2002 NOTARY PUBLIC i

1 l

s..

'l ATTACHMENT 3-LIST OF NRC COMMITMENTS-l c

Correspondence No:NLSC80143 The following table identifies'those actions committed to by the District in this document. 'Any other actions discussed-in the submittal. represent intended or planned actions by the. District. They:are described to the NRC for the NRC's informationland are not regulatory commitments.

Please notify the $liin Manager at' Cooper Nuclear Station of any questions regarding.this document or any associated regulatory commitments.

' COMMITTED DATE COMMITMENT OR OUTAGE ~

None-i

]

l 1

l l

l

\\

s, l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER 6 l

PAGE 9 OF 13 l