ML20090K714

From kanterella
Jump to navigation Jump to search
Notifies NRC That Facility Will Complete Inner Personnel Air Lock Door Equalizing Valve Mod by 920601
ML20090K714
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/13/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-089R, LIC-92-89R, NUDOCS 9203190238
Download: ML20090K714 (1)


Text

..,

~

o Omaha Public Power District 444 South 16th Street Mall March 13 1992 Omaha, Nebraska t>8102-2247 LIC-92-009R 402/636-2000 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station P1 137 Washington, DC 20555

References:

1.

Docket No. 50-285 2.

Licensee Event Report (LER)91-029 dated January 3,1992 (LIC-91-284L)

Gentlemen:

SUBJECT:

Inner Personnel Air Lock (PAL) Door Equalizing Valve Modification The purpose of 'his letter is to notify the NRC that Omaha Public Power District LOPPD) Mr. S. D. Bloom of the NRC requested in a telephone call with Mr. T. C.

will complete the subject modification, as decribed below, by June 1, l992.

Matthews of OPPD on february 11, 1992 that this inf ormation be formally transmitted to the NRC.

Ref erance 2 describes the sequcnce of events that initiated the develtpment of this modification.

The modification will extend the pipe from the inner PAL door equalizing valve l

on the Auxiliary Building side and add a removable cap that can provide l

containment isolation when necessary.

The new piping will aho contain a test port to provide the ability to leak test the pipe, cap and equalization valve.

If the inner PAL door equalization valve should fail its leak test, thi; modification will assure compliance with Technical Specification 2.6(1)a regarding containment integrity by allowing isolation of the inner PAL door equalization valve prior to opening the outer PAL door to initiate repairs.

If you should have any questions, please do not hesita.te to (.ontcet me.

Sincerely if,M

?.

W. G. Gates Division Manager Nuclear Operations l

l WGG/sel c:

LeBoeuf Lamb, Leiby & MacRae D.L.Wlgginton,NRCSeniorProjectManager S. D. Bloom, NRC Project Engineer R. D. Martin, NRC Reglenal Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector I h 9203190238 920333

((Q%)}J fDR ADOCK 05000285 l

P g p u.. DR tmm=ngtyratuno

I

.s e

.