--,sfb Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 j
April 26,1994 WALTER C. MARSH 1EtErso~e MANAGER OF NUCLE AR REQULATORY AFF AIRS
( F14) 4S4-4403 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 l
Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 NUREG-0737, Clarification of TMI Action Plan Requirements Update San Onofre Nuclear Generating Station Units 2 and 3 l
References:
1.
NUREG-0737, Clarification of TMI Action Plan Requirements l
2.
SCE to NRC letter, " Detailed Control Room Design Review l
(DCRDR) Supplemental Report," dated January 29, 1986.
3.
NRC Safety Evaluation Report on Detailed Control Room Design Review for San Onofre Units 2 and 3," dated December 15, 1986 4.
Letter from W. C. Marsh (SCE to Document Control Desk (NRC),
Ninth Edition of the Integrated Implementation Schedule, San Onofre' Nuclear Generating Station Units 2 and 3, dated February 23, 1994.
The purpose of this letter is to notify the NRC that all the safety significant Detailed Control Room Design Review (DCRDR) design changes have been completed. Control room design reviews were required by NUREG-0737, Clarification of TMI Action Plan Requirements (Reference 1).
By Reference 2, SCE transmitted the DCRDR supplemental report to the NRC.
The DCRDR effort identified several Human Engineering Discrepancies (HEDs) and the design changes that would be implemented to correct these HEDs. An NRC SER (Reference 3) provided the NRC's concurrence that all outstanding commitments regarding completion of the DCRDR had been satisfied and approved SCE's plan for the correction of the identified HEDs.
Edison has completed all of the DCRDR related control room modifications with one exception - the relabeling of panel CR-61.
This relabeling is not safety significant since the indication and controls located on this panel are nonsafety-related.
Edison will complete CR-61 label changes concurrent with other modifications being made to upgrade panel CR-61 to Edison's current control room design standard. All work on this panel will be completed by J
4/29/94, as noted in Reference 4.
i 0004n "g
9405020052 940426 PDR ADOCK 05000361 I
I O l
P PDR l'
t
a Docu, ment Control Desk If you have any questions concerning the DCRDR modifications, please let me know.
Very truly yours, T
cc:
L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J.'A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 i