Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107B301 + (Forwards Procedure 216, Oyster Creek Channel Sample Shipment)
- ML20052D799 + (Forwards Procedure 5.7.27,early Warning Sys)
- ML20135A952 + (Forwards Procedure 5101.2, Project Classification of Equipment, in Response to 850826 Request for Addl Info to Complete Review of 850623 Highpoint Vent Leak at Facility)
- ML20135A957 + (Forwards Procedure 5101.2, Project Classification of Equipment, in Response to 850826 Request for Addl Info to Complete Review of 850623 Highpoint Vent Leak at Facility)
- ML20028G487 + (Forwards Procedure 6210-ADM-2550.01, Control of Exams for Units 1 & 2, Rev 0,in Response to ASLB 820727 Partial Initial Decision Requiring Procedure for Routine Sampling & Review of Exam Answers for Evidence of Cheating)
- ML20141C400 + (Forwards Procedure 6575-ADM-4500.06, Emergency Response Procedure & Emergency Plan, That Was Inadvertently Overlooked & Not Included as Attachment in Submittal,)
- ML20080N013 + (Forwards Procedure AD.NP.16, Nuclear Production Directive Emergency Procedure Generation Program, Per NUREG-0737, Suppl 1 (Generic Ltr 82-33))
- FVY-84-118, Forwards Procedure AP 0154, Post-Trip Review, Inadvertently Omitted from 840925 Submittal + (Forwards Procedure AP 0154, Post-Trip Review, Inadvertently Omitted from 840925 Submittal)
- ML20010E430 + (Forwards Procedure AP/1/A/550/36, Venting of Noncondensible Gases from Reactor Vessel Head, Per License NPF-9,Condition c.(11)i)
- ML20010E431 + (Forwards Procedure AP/1/A/550/36, Venting of Noncondensible Gases from Reactor Vessel Head, Per License NPF-9,Condition c.(11)i)
- ML20080G504 + (Forwards Procedure AP/1/A/5500/31, Estimate of Failed Fuel Based on I-131 Concentration, in Response to NRC Request to Complete Review of NUREG-0737,Item II.B.3)
- ML20035F393 + (Forwards Procedure Changes,Tests & Experiments Requiring SE Completed During March 1993 for Quad-Cities Units 1 & 2. Summary of SE Reported in Compliance w/10CFR50.59 & 10CFR50.71(e))
- ML20126B502 + (Forwards Procedure Comment Sheet on Mini Decay Heat Removal Sys Design Document,Sd TS-27,Revision 0.Document Is Incomplete Due to Omission of Info Re Instrumentation Alarm Setpoints.Requests Addl Info)
- ML20042F620 + (Forwards Procedure Describing General Soil Excavation & Sorting Process During Removal from Impacted Areas)
- ML20117D322 + (Forwards Procedure Developed for Use at Plant Re SAFT-UT Sys in Both Automated & Manual Modes on Cast Stainless Steel)
- B11455, Forwards Procedure EA-062, Program for Completion of Engineering Assurance In-Depth Technical Audits,Millstone Unit 3 Project, Per 850211 Meeting Discussion.Program Describes NRC Involvement in Audit Process + (Forwards Procedure EA-062, Program for Completion of Engineering Assurance In-Depth Technical Audits,Millstone Unit 3 Project, Per 850211 Meeting Discussion.Program Describes NRC Involvement in Audit Process)
- ML20070B456 + (Forwards Procedure Forms for Univ of Utah Triga Reactor. Forms Correct Deficiencies Noted in Previous Audits by Reactor Safety Committee & NRC During Insp on 880216-19. Update & Correction of Facility Documents Ongoing)
- ML19321A025 + (Forwards Procedure Guidelines for Plants W/High & Low Head High Pressure Safety Injection Sys,Emergency Procedures & Interim Adequate Core Cooling Instructions & Ref Instructions for post-LOCA Cooldown & Depressurization)
- ML19331D663 + (Forwards Procedure IP-18, Plant Release Rate Calculations & Graphs of Containment Activity as Function of Monitor Reading,In Fulfillment of 800811 Commitment to Provide Correlation Procedure)
- ML19331D664 + (Forwards Procedure IP-18, Plant Release Rate Calculations & Graphs of Containment Activity as Function of Monitor Reading,In Fulfillment of 800811 Commitment to Provide Correlation Procedure)
- ML20083G039 + (Forwards Procedure LIM UT-1,Rev 1, Reg Guide 1.150 Method for Compliance, Per Commitment at 830831 Meeting to Provide Description of Qualification of GE Ultrasonic Test Process for Reactor Pressure Vessel Insp)
- ML17250A299 + (Forwards Procedure M-11.5B,Revision 9, Major Mechanical Insp of Auxiliary Feed Pumps, & Procedure PT-16,Revision 23, Auxiliary Feedwater Sys, in Response to NRC 800418 Request)
- ML20138R470 + (Forwards Procedure M1-18, Decontamination & Treatment of Radioactively Contaminated Patient at Montgomery Hosp. Related Correspondence)
- ML20138R457 + (Forwards Procedure M1-18, Decontamination & Treatment of Radioactively Contaminated Patient at Montgomery Hosp. Related Correspondence)
- ML20138R459 + (Forwards Procedure M1-18, Decontamination & Treatment of Radioactively Contaminated Patient at Montgomery Hosp. Related Correspondence)
- ML19221A440 + (Forwards Procedure Production Flow Chart)
- ML20067D390 + (Forwards Procedure Q, Response to Void in Reactor Vessel, Per NUREG-0737,Item II.B.1)
- ML19259A848 + (Forwards Procedure QC-002,Receipt,Insp & Shipment of Radioisotopes. Describes Organizational Structure & Safety Requirements for Insp of Radioisotopes)
- ML20072J455 + (Forwards Procedure Re Emergency Communication,Contained in Plant Manual.Util Requests That Said Info Be Removed from Document Prior to Distribution to PDR Due to Proprietary & Personal Matl within Said Info)
- ML18086B239 + (Forwards Procedure Reactor Vessel Head Vent Operation, Per NUREG-0737,Item II.B.1 Requirement.Procedure Developed Per 810720 Westinghouse Owners Group Ltr WOG-81-191)
- ML18086B240 + (Forwards Procedure Reactor Vessel Head Vent Operation, Per NUREG-0737,Item II.B.1 Requirement.Procedure Developed Per 810720 Westinghouse Owners Group Ltr WOG-81-191)
- ML20054H006 + (Forwards Procedure Revision 1 to Tp 82-25, Standby Svc Water/Reactor Bldg Component Cooling Water Sys Heat Exchanger Test Performance, in Response to 820520 Telcon Re IE Bulletin 81-03, Flow Blockage of Cooling)
- ML19327A491 + (Forwards Procedure TP-2-1,Revision 6, Operator Licensing & Training Procedure TP-2-2,Revision 8, Licensee Retraining Program)
- ML19347D375 + (Forwards Procedure TSS 13, Tendon Surveillance Test Procedures, in Response to NRC 801125 Generic Request)
- ML20036A762 + (Forwards Procedure for Addressing Ownership Transfers of Topical Repts Submitted for Review,Per 10CFR61)
- ML19289G089 + (Forwards Procedure for Adjusting Reactor Bldg Sump Water Pressure Gauge to Suppl procedure-2-93.Column of Water Must Not Exist in Instrumentation Line During Zero Adjustment)
- ML20151L361 + (Forwards Procedure for Augmented Investigation Team Response to Operational Events Prepared in Response to SECY-85-208. Comments Requested by 860115)
- ML19224C848 + (Forwards Procedure for Badging of NRC Personnel)
- ML20033D167 + (Forwards Procedure for Determination of FSAR Design Curves Presenting Plots That Compare Dynamic Shear Modulus Vs Strain Design Curves W/Lab Test Values & Forwards Factors of Safety Against Sliding of Main Plant Foundations)
- ML19318C830 + (Forwards Procedure for Documentation of Deviations from Srp. SERs Issued After 770101 for Plants Under OL Review & Issued After 770801 for CP Applications Under Review Are to Document Deviations from SRP)
- ML20196K095 + (Forwards Procedure for Incidents & Allegations,Nmss & Regions Reviewed Last July.Procedures Put in OSP Format & Being Sent to Agreement States for Comment)
- ML20093F319 + (Forwards Procedure for Performing Task Analysis & Verification for Detailed Control Room Design Review, Per 840924 Meeting W/Nrc.Response Time for Sys or Components Will Be Analyzed as Appropriate.Task Analysis Defined)
- ML20154B283 + (Forwards Procedure for Prevention & Correction of Steam Binding of Auxiliary Feedwater Pumps in Response to IE Bulletin 85-001)
- ML20207N617 + (Forwards Procedure for Providing Addl Info Re QA for TN-24 Dry Storage Cask Topical Rept)
- ML19209B692 + (Forwards Procedure for Qualification of Computer Programs)
- ML20039G921 + (Forwards Procedure from Committee to Review Generic Requirements Re Reg Guides Prior to Commitment of Resources for NRC & ACRS Reviews & Public Comment.Reg Guide 1.68.3 to Be Reviewed at 820107 Meeting Encl)
- ML19220A603 + (Forwards Procedure on Submittal of Detailed Engineering, Industrial & Const Drawings)
- ML19323A072 + (Forwards Procedure to Be Used to Conduct Water Hammer Test on Auxiliary Feedwater Sys at Facility)
- ML19323A073 + (Forwards Procedure to Be Used to Conduct Water Hammer Test on Auxiliary Feedwater Sys at Facility)
- ML17277B034 + (Forwards Procedure to Ensure Operability of ESF Sys Following Removal from Svc Per NUREG-0737,Items II.K.1.10 & II.K.1.5.Confirmatory Issue 22 Considered Closed)
- ML17277B035 + (Forwards Procedure to Ensure Operability of ESF Sys Following Removal from Svc Per NUREG-0737,Items II.K.1.10 & II.K.1.5.Confirmatory Issue 22 Considered Closed)