ML20010E430
| ML20010E430 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/26/1981 |
| From: | Parker W DUKE POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20010E431 | List: |
| References | |
| NUDOCS 8109040126 | |
| Download: ML20010E430 (1) | |
Text
________
DtJKE POWER COMPANY l'OWER litJtLDING
.tuu SocTn Cituncu StuEET, CHAHIDTTE, N. C. 2na w WILLtAM O. PA R M E R, J R.
SCF Pmt 5a C F*e ?
TELEPmonet:Anta704 St rane PaoovcTroN 373-4083 August 26, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation g
g U. S. Nuclear Regulatory Commission g
Washington, D. C. 20555 gN q%
of r
th Attention: Ms. E. G. Adensam, Chief
- 31. =
U
=
Licensing Bratich No. 4 SEP 0 31981
- Re: McGuire Nuclear Station
("O Docket Nos. 50-369, 50-370 g
Dear Mr. Denton:
gg Attached is the McGuire Nuclear Station procedure AP/1/A/5500/36, " Venting of Non-Condensible Cases from the Reactor Vessel Head." This procedure is being sul.mitted pursuant to McGuire Operating License, NPF-9, Condition c.(ll)i.
to provide "information on procedures and testing including measures to pre-clude inadvertent operation."
Testing of the valves is accomplished by operation of the valves during the pre-startup venting of the Reactor Coolaat System. Covers are placed over the switches for the valves to preclude inadvertent operation of the valves (Note Step 5.8 in the attached proced2re).
If there are any questions regarding this matter, please advise.
Ver truly yours, 6.
..- /[. h p
William O. Parker, Jr.
GAC/php Attachment cc: ?Is. M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector-NRC U. S. Nuclear Regulatory Commission McGuire Naclear Station Region 11 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 8109040126 810826
'4 PDR ADOCK 05000369
- I l l
P PDR 5
)