ML20054H006

From kanterella
Jump to navigation Jump to search
Forwards Procedure Revision 1 to Tp 82-25, Standby Svc Water/Reactor Bldg Component Cooling Water Sys Heat Exchanger Test Performance, in Response to 820520 Telcon Re IE Bulletin 81-03, Flow Blockage of Cooling
ML20054H006
Person / Time
Site: Pilgrim
Issue date: 06/16/1982
From: Morisi A
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20054H007 List:
References
REF-SSINS-6820 82-175, IEB-81-03, IEB-81-3, NUDOCS 8206220487
Download: ML20054H006 (1)


Text

_ _ _

o B O STO N EOlBON COMPANY GENERAL OrrscEn 800 BovLaTON STREET Bo mTO N, M ASS AcH UE ETTm 0219 9 A. V. M O RIS 8 MANAGER NUCLEAR Q PERATIONS SU PPORT DEPARTM ENT June 16, 1982 BECo Ltr. #82-175 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 Reference A: Telecon, Conference Call w/various BEco and NRC representatives, dated 5/20/82

Dear Sir:

In the course of the NRC review of Boston Edison Company's response to IE Bulletin 81-03:

Flow Blockage of Cooling Water to Safety System Components by Corbicula Sp. (Asiatic Clam) and Mytilus Sp. (Mussel), K. Eccleston identified a need for additional information.

Subsequently Boston Edison setup a telephone conference call (Ref. A) with NRC and Boston Edison Company representatives. As a follow item BECo now encloses a copy of PNPS Procedure No. TP82-25, Revision 1, "SSW/RBCCW Heat Exchanger Test Performance".

Should you require further information concerning this issue, please contact us.

Very truly yours, Attachment fo l o

8206220487 820616 PDR ADOCK 03000293 O

PDR

_ _ _ _ _ _ _ _ _ ___ _ _