ML20054H006
| ML20054H006 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/16/1982 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20054H007 | List: |
| References | |
| REF-SSINS-6820 82-175, IEB-81-03, IEB-81-3, NUDOCS 8206220487 | |
| Download: ML20054H006 (1) | |
Text
_ _ _
o B O STO N EOlBON COMPANY GENERAL OrrscEn 800 BovLaTON STREET Bo mTO N, M ASS AcH UE ETTm 0219 9 A. V. M O RIS 8 MANAGER NUCLEAR Q PERATIONS SU PPORT DEPARTM ENT June 16, 1982 BECo Ltr. #82-175 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Reference A: Telecon, Conference Call w/various BEco and NRC representatives, dated 5/20/82
Dear Sir:
In the course of the NRC review of Boston Edison Company's response to IE Bulletin 81-03:
Flow Blockage of Cooling Water to Safety System Components by Corbicula Sp. (Asiatic Clam) and Mytilus Sp. (Mussel), K. Eccleston identified a need for additional information.
Subsequently Boston Edison setup a telephone conference call (Ref. A) with NRC and Boston Edison Company representatives. As a follow item BECo now encloses a copy of PNPS Procedure No. TP82-25, Revision 1, "SSW/RBCCW Heat Exchanger Test Performance".
Should you require further information concerning this issue, please contact us.
Very truly yours, Attachment fo l o
8206220487 820616 PDR ADOCK 03000293 O
_ _ _ _ _ _ _ _ _ ___ _ _