Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20055A168 + (Forwards Changes to Chapter 14,FSAR Tables 14.1-58, RCS Flow Measurement, & 14.1-75, Rod Drop Test, Per 820707 Discussion)
- ML20202B606 + (Forwards Changes to Chapter 8,Rev 16 to Security Program, Per 851219 & s.Chapter 8, Security Contingency Plan, Prepared as Separate Document.Changes Withheld (Ref 10CFR73.21))
- ML20202A767 + (Forwards Changes to Chapter 8,Rev 17 to Security Program. Chapter 8, Security Contingency Plan, Prepared as Separate Document.Changes Withheld (Ref 10CFR73.21))
- ML20128H060 + (Forwards Changes to Chapters 2,6 & 10 of SNM License,Per NRC 920923 Request,W/Respect to Revs Submitted on 920316,per Condition 17,requiring Evaluation of License Against BTPs & Propose License Conditions for Compliance)
- ML20132C216 + (Forwards Changes to Characterization Rept as Well as Responses to Comments for Remediation Plan)
- ML20101E406 + (Forwards Changes to Const Assessment Program,Per & Discussions W/Nrc)
- ML19248D703 + (Forwards Changes to Contingency & Training Plans Pursuant to Request)
- ML18018A532 + (Forwards Changes to Corporate QA Program,Currently Provided in Section 1.8 of PSAR)
- ML18018A533 + (Forwards Changes to Corporate QA Program,Currently Provided in Section 1.8 of PSAR)
- ML17262B243 + (Forwards Changes to Correct Errors in Data Point Library Discovered During Internal ERDS Testing & Discussed W/Nrc on 921117.Revs Include Alarm/Trip Setpoint for RCS Pressure & Alarm/Trip Low Setpoint for Primary Sys Charging Low)
- ML20154E456 + (Forwards Changes to DAEC Security Plan,To Facilitate Change in Security Access Badge Fabrication & Incorporate Some Editorial Changes.Encl Withheld)
- ML20035E138 + (Forwards Changes to DG Qualification Rept,Per 930317 Meeting W/Nrc.Alarms Will Be Provided in Main Control Room Equivalent to Alarms Already Provided to Existing Dgs. Trending Equipment Will Not Provide Info to Control Room)
- ML20046A735 + (Forwards Changes to Data Point Library Resulting from Software Mods Affected Transmitted Data Points.Submittal Made in Accordance w/10CFR50,App E VI.3.a)
- ML20128D861 + (Forwards Changes to Data Point Library for ERDS)
- ML20096E724 + (Forwards Changes to Data Point Library,Consisting of List of Data Point Library Computer Points.Changes in Response to J Jolicoeur 920408 Request Re ERDS)
- ML20236D044 + (Forwards Changes to Description of Operational QA Program for Facility.Changes Do Not Reduce Commitments in or Effectiveness of Facility Operational QA Program.Fsar Section 17.2 Will Be Updated in Future Amend to FSAR)
- ML20204J840 + (Forwards Changes to Description of Operational QA Program, Provided in Form of marked-up FSAR Pages)
- ML20095C042 + (Forwards Changes to Design Details of, Protection Against Malevolent Use of Vehicles at Npps, IAW 10CFR50.4(b)(4). W/O Encl)
- ML20128L720 + (Forwards Changes to Dfser Chapter 9 Section 9.3.5 Re Reliability of Suction Valves for Slcs,Per 930217 Discussion)
- ML20071N746 + (Forwards Changes to ECCS Evaluation Model Required by 10CFR50.46(a)(3)(ii),containing Info on Sbloca,Large Break LOCA (LBLOCA) for Westinghouse Ofa Fuel & LBLOCA for Mark- Bw Fuel)
- LIC-95-0197, Forwards Changes to EPIPs & Radiological Emergency Response Plan,Including Central Files Version of Rev 12 to EPIP-RR-17A.Central Files Version of Rev 12 to EPIP-RR-17A Withheld + (Forwards Changes to EPIPs & Radiological Emergency Response Plan,Including Central Files Version of Rev 12 to EPIP-RR-17A.Central Files Version of Rev 12 to EPIP-RR-17A Withheld)
- ML20217H466 + (Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl)
- PY-CEI-NRR-2401, Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars + (Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars)
- PY-CEI-NRR-1751, Forwards Changes to ERDS Data Point Library & ERDS Communication Description for Facility + (Forwards Changes to ERDS Data Point Library & ERDS Communication Description for Facility)
- ML20065H206 + (Forwards Changes to ERDS Data Point Library.Alarm Limits Changed as Result of Change in Power Rating)
- ML20101J442 + (Forwards Changes to ERDS Data Set Library)
- L-99-110, Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6 + (Forwards Changes to ERDS for Unit 1,IAW Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6)
- ML20035C226 + (Forwards Changes to Either Utility Requirements or Dser Issue Database Re BWR Drain & Bypass lines,non-safety Software Quality & Spent Fuel Pool Cooling)
- PY-CEI-NRR-2358, Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Perry Npp,Per 10CFR50,App E.Changes Constitute Revs,Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Perry Npp,Per 10CFR50,App E.Changes Constitute Revs,Temporary Changes or Reissued Pages)
- PY-CEI-NRR-2302, Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Pnpp.Changes Constitute Revs,Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Pnpp.Changes Constitute Revs,Temporary Changes or Reissued Pages)
- ML16342D742 + (Forwards Changes to Emergency Plan Implementation Procedure EP G-1, Emergency Classification & Emergency Plan Activation, Rev 25.Changes Acceptable & Do Not Appear to Degrade Effectiveness of Emergency Planning.W/O Encl)
- PY-CEI-NRR-2257, Forwards Changes to Emergency Plan Implementing Instructions for Perry Nuclear Power Plant.Changes Constitute Revs, Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan Implementing Instructions for Perry Nuclear Power Plant.Changes Constitute Revs, Temporary Changes or Reissued Pages)
- PY-CEI-NRR-2267, Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Perry Npp.Changes Constitute Revs,Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Perry Npp.Changes Constitute Revs,Temporary Changes or Reissued Pages)
- LIC-88-1007, Forwards Changes to Emergency Plan Implementing Procedures, Including Rev 3 to EPIP-OSC-18-1 & Rev 7 to EPIP-RR-29-1 & Proprietary Rev 7 to EPIP-RR-29-5.Proprietary Rev Withheld + (Forwards Changes to Emergency Plan Implementing Procedures, Including Rev 3 to EPIP-OSC-18-1 & Rev 7 to EPIP-RR-29-1 & Proprietary Rev 7 to EPIP-RR-29-5.Proprietary Rev Withheld)
- ML20077E190 + (Forwards Changes to Emergency Plan Implementing Instructions for Plant)
- ML20087F564 + (Forwards Changes to Emergency Plan Implementing Procedures. W/O Encl)
- ML20151K014 + (Forwards Changes to Emergency Plan as a Result of State of Mn Enacted Legislation Which Changed Boundary of EPZ to Coincide W/Political Boundaries)
- PY-CEI-NRR-2353, Forwards Changes to Emergency Plan for Pnpp,Per 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan for Pnpp,Per 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages)
- PY-CEI-NRR-2147, Forwards Changes to Emergency Plan for Plant Which Constitute Revs,Temporary Changes or Reissued Pages + (Forwards Changes to Emergency Plan for Plant Which Constitute Revs,Temporary Changes or Reissued Pages)
- ST-HL-AE-4248, Forwards Changes to Emergency Response Data Sys (ERDS) Data Point Library (Dpl),Per 10CFR50 & NUREG-1394,rev 1 + (Forwards Changes to Emergency Response Data Sys (ERDS) Data Point Library (Dpl),Per 10CFR50 & NUREG-1394,rev 1)
- PY-CEI-NRR-1852, Forwards Changes to Emergency Response Data System Dpl for Perry Nuclear Power Plant,Unit 1 + (Forwards Changes to Emergency Response Data System Dpl for Perry Nuclear Power Plant,Unit 1)
- ML20247D049 + (Forwards Changes to Emergency Response Plan in Response to .Changes Listed Include Addition of Ofc of Environ Health & Safety to List of Campus Support Agencies & New Line of Succession for Senior Health Physicist)
- ML20206J142 + (Forwards Changes to Encls 1 & 2 of ,Transmitting Revised Inservice Testing Program for Pumps & Valves & Summary Description of Revs.Meeting W/Nrc During Wks of 860623 or 860630 to Discuss Program & SER Requested)
- ML20136H622 + (Forwards Changes to FCS Radiological Emergency Plan (RERP))
- ML20211M936 + (Forwards Changes to FRN & Ocp.Appreciation Expressed for Delivering Fasb Draft)
- B11368, Forwards Changes to FSAR & Description of Design Basis for Mod to Solid State Protection Sys to Be Configured for 3-loop Operation.Requests Approval to Operate Unit W/Three Active Coolant Loops in Event of Equipment Failure in Loop + (Forwards Changes to FSAR & Description of Design Basis for Mod to Solid State Protection Sys to Be Configured for 3-loop Operation.Requests Approval to Operate Unit W/Three Active Coolant Loops in Event of Equipment Failure in Loop)
- ML20071P818 + (Forwards Changes to FSAR Addendum,Rev 10 Re Operating QA Program (Section 17.2).Updated Table 17.2-1 Will Be Formally Incorporated in Rev 11 to FSAR)
- ML20117G110 + (Forwards Changes to FSAR Chapter 13 & Procedure Generation Package Re SER Open Items for NRC Review Per 850426 Telcon. Changes Will Appear in FSAR Amend 17.Resumes for Shift Supervisors & Reactor Engineer Also Encl)
- ML17303A185 + (Forwards Changes to FSAR Chapters 1,8 & 9 Re Cooling Water Supply & Return Lines,Unit Load Rejection Test,Reg Guide 1.108 & Transmission Network.Justifications for Changes Listed)
- ML20117L750 + (Forwards Changes to FSAR Chapters 13 & 14 Resulting from 850426 Telcon Re Draft SER Open Items,Including ECCS Outage Data Collection Procedures in Accordance w/NUREG-0737, Item II.K.3.17.Changes Incorporated in Amend 17)
- ML20153B660 + (Forwards Changes to FSAR Chapters 17.1, QA During Design & Const & 17.2, QA During Operation Phase. QA Program Revised to Reflect Consolidation of QA Programmatic Documents Into QA Manual)