Forwards Changes to Correct Errors in Data Point Library Discovered During Internal ERDS Testing & Discussed W/Nrc on 921117.Revs Include Alarm/Trip Setpoint for RCS Pressure & Alarm/Trip Low Setpoint for Primary Sys Charging Low
ML17262B243
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/04/1992
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1163C, NUDOCS 9212090195
Download: ML17262B243 (7)


Text

Power Company P.O. Box 16631 Columbus, OH 43216 INDlANA NICHlGJLN POWER AEP: NRC: 1163C 10 CFR Part 50 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 EMERGENCY RESPONSE DATA SYSTEM (ERDS)

U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D.C. 20555 Attn: T.E. Hurley December 4, 1992

Dear Dr. Hurley:

This letter is vritten to submit changes to the Cook Nuclear Plant Unit 2 Data Point Library that, vere discovered during internal ERDS testing. The specific changes are outlined belov. These changes vere discussed vith Hr. J. R. Jolicoeur of your staff on November 17, 1992. The Unit 2 Data Point Library vas originally submitted in our letter AEP:NRC:1163A dated June 17, 1992.

The necessary revisions are as follovs:

The alarm/trip setpoint for reactor coolant system pressure vas omitted. It should be 425 PSIG lov.

2. The alarm/trip lov setpoint for the primary system charging or makeup flov vas given as 40.0 GPH high.

It should be 40.0 GPH lov.

Attached are the revised pages to the Unit 2 Data Point Library that incorporate the above changes.

EF~p~

E. E. Fitzpatrick Vice President dag Attachment

Dr. T. E. Murley AEP:NRC:1163C cc: D. H. Villiams, Jr.

A. A. Blind - Bridgman J. R. Padgett G. Charnoff A. B. DaWs - Region III NRC Resident Inspector - Bridgman NFEM Section Chief J. R. Jolicoear - NRC

Attachment to AEP:NRC:1163C Uni.t 2 Data Point Library Revised Pages

DATE: November 17, 1992 REACTOR UNIT:

DATA FEEDER: N/A NRC ERDS PARAMETER s RCS PRESSURE POINT IDs U1313 PLANT SPEC POINT DESCs RCL SYSTEM PRESSURE GENERIC/COND DESCs REACTOR COOLANT SYSTEM PRESSURE ANALOG/DIGITALs ENGR UNITS/DZG STATES: PSZG ENGR UNITS CONVERSZONs N/A MINIMUM INSTR RANGEs 0.0 MAXIMUM INSTR RANGEs 3000.0 ZERO POINT REFERENCE'/A REFERENCE POINT NOTES: N/A, PROC OR SENSs NUMBER OF SENSORS: 2 HOW PROCESSED AVERAGE SENSOR LOCATZONs LOOP 1 AND 2 HOT LEG INLET TO SG1 AND SG2 ALARM/TRIP SET POZNTSs 425 LOW NZ DETECTOR POWER SUPPLY CUTOFF POWER LEVEL: N/A NZ DETECTOR POWER SUPPLY TURIN POWER LEVEL: N/A INSTRUMENT FAILURE MODEsN/A TEMPERATURE COMPENSATION FOR DP TRANSMZTTERs N/A LEVEL REFERENCE LEGs N/A UNIQUE SYSTEM DESCs NPS-121, NPS-122 COOK NUCLEAR PLANT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LZBRARY PAGE 90 OF 112 REVISION 1

DATE: Novembex 17, 1992 REACTOR UNIT:

DATA FEEDER: N/A NRC EROS PARAMETER: RCS CHG/MU POINT ID: U1613 PLANT SPEC POINT DESC: TOTAL CHARGING FLOW GENERIC/COND DESC: PRIMARY SYSTEM CHARGING OR MAKEUP FLOW ANALOG/DIGITAL:

ENGR UNITS/DZG STATES: GPM ENGR UNITS CONVERSION: N/A MINIMUM INSTR RANGE: 0.0 MAXIMUM INSTR RANGE: 200.0 ZERO POINT

REFERENCE:

N/A REFERENCE POZNT NOTES: N/A PROC OR SENS:

NUMBER OF SENSORS:

HOW PROCESSED:

SENSOR LOCATION DISCHARGE HEADER OF CHARGING PUMPS AND COLD LEG OF ALL FOUR LOOPS ALARM/TRIP SET POINTS: 40 0 LOW NI DETECTOR POWER SUPPLY CUTOFF POWER LEVEL: N/A NI DETECTOR POWER SUPPLY TURN-ON POWER LEVEL N/A INSTRUMENT FAILURE MODE:N/A TEMPERATURE COMPENSATION FOR DP TRANSMITTER: N LEVEL REFERENCE LEG: N/A UNIQUE SYSTEM DESC: QFZ 200 g ZFI 51 g ZFZ 52 g IFI 53 i IFZ 54 COOK NUCLEAR PLANT EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY PAGE 92 OF 112 REVISION 1

4