ML16342D742

From kanterella
Jump to navigation Jump to search
Forwards Changes to Emergency Plan Implementation Procedure EP G-1, Emergency Classification & Emergency Plan Activation, Rev 25.Changes Acceptable & Do Not Appear to Degrade Effectiveness of Emergency Planning.W/O Encl
ML16342D742
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/14/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9707210059
Download: ML16342D742 (10)


Text

c~ ~

<~

CATEGORY 2 m REGULAT~ INFORMATION DISTRIBUTION %STEM (RIDS)

'"'CCESSION NBR:9707210059 DOC.DATE: 97/07/14 NOTARIZED:

NO DOCKET FACIL:50-275 Diablo'anyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION HOWELL,A.T.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION RUEGERFG.M.

Pacific Gas a Electric Co.

SUBJECT:

Forwards changes to emergency plan implementation procedure EP G-l, "Emergency Classification a Emergency Plan Act'vation," Rev 25.Changes acceptable a do not appear to degrade effectiveness of emergency planning.W/o encl.

DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr Exercise NOTES:

T Rep RECIPIENT ID CODE/NAME PD4-2--PD INTERNAL".~iFILE CENTERbj

~NRR/DRPM/PERB RGN4 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME BLOOMFS NRR/DISP/PIPB OE DIR NRC PDR COPIES LTTR ENCL 0

D 0

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL

<gg REMI Fp0

+**<<<<

0 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 6064 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177

SUBJECT:

CHANGES TO THE DIABLO CANYON NUCLEAR POWER PLANT EMERGENCY CLASSIFICATION PROCEDURE We have reviewed your letters dated January 6 and April 4, 1997, and the enclosed changes to Emergency Plan Implementing Procedure EP G-1, "Emergency Classification and Emergency Plan Activation," Revision 25.

The revision was submitted in accordance with 10 CFR Part 50, Appendix E.V, and incorporated editorial and clarifying changes.

Based on our review, we determined that the changes are acceptable and do not appear to degrade the effectiveness of your emergency planning at the Diablo Canyon Nuclear Power Plant.

Should you have any questions concerning this letter, please contact Mr. Thomas H. Andrews of my staff at (817)860-8242.

Sincerely, Arthur T. Howell III, Director Division of Reactor Safety Docket Nos.:

50-275; 50-323 License Nos.:

DPR-80; DPR-82 CC:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 97072i0059 9'707i4 PDR ADQCK 05000275 F

PDR Illllllilllllllllllllllllllllllillll

Pacific Gas and Electric Company'2-Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) bcc to DCD (IE35) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

T. Essig (DRPM/PERB)

DOCUMENT NAME: DCEALR25.LTR To receive copy of document, indicate In box: "C" = Copy without enctosures "F'

Copy with enclosures "N" = No copy RIV:RS:PSB TAndrews/Imb" 07/09/97 C:PSB BMurray" 07/09/97 D:DR ATHow 07/

97 "previously concurred OFFICIAL RECORD COPY

Pacific Gas and Electric Company E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) bcc to'DCD (IE35) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

T. Essig (DRPM/PERB)

DOCUMENT NAME'CEALR25.LTR To receive copy of document, indicate ln box: "C" = Copy without enclosures "E",= Copy with enclosures "N" = No copy RIV:RS:PSB TAndrews/Imb" 07/09/97 C:PSB BMurray" 07/09/97 D:DR ATHow 07/

97 "previously concurred OFFICIAL RECORD COPY