ML20087F564

From kanterella
Jump to navigation Jump to search
Forwards Changes to Emergency Plan Implementing Procedures. W/O Encl
ML20087F564
Person / Time
Site: Fort Calhoun 
Issue date: 03/05/1984
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-84-063, LIC-84-63, NUDOCS 8403190154
Download: ML20087F564 (1)


Text

.

-4

~

1 Omaha Public Power District 1623 Harney Omaha Nebraska 68102 402/536-4000 March 5, 1984 LIC-84-063 g @ B O W {R N i

MAR 8 SO4 Mr.

J.

T.

Collins, Administrator h

U.

S, Nuclear Regulatory Commission

'y jj Region IV

..u-611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Collins:

Transmittal of Changes to Emergency Plan I.nplementing Procedures Pursuant to 10 CFR 50, Appendix E,Section V, five (5) copies of changes to the Port Calhoun Station Emergency Plan Implementing Procedures are being provided to the Commission.

Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office.

Two (2) copies (for control copy numbers 165 and 166) have been provided to the Document Control Desk in Washington, D.C.

A transmittal sheet is provided for each copy to confirm receipt of the serialized document.

It is requested that these sheets be completed and returned within five (5) days of receipt.

Sincerely, lTl0 W.

C. Jones Division Manager Preduction Operations WCJ:jmm Enclosures cc:

Document Control Desk U.

S.

Nucleat Regulatory Commission Washington, D.C.

20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036

.Q Mr.

L.

A.

Yandell, Se.>ior Resident Inspector 7-8403196154 840305 PDR ADOCK 05000285 Employment with Equal Opportu.:ity

[

F PDR M8!elremale