Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141P098 + (Discusses Value Engineering Study of Lakeview Remedial Action Project Conducted on 851122.Recommendations Agreed to in 860115 Meeting Listed.Justification for Recommendation Will Be Provided in Separate Ltr)
- ML19331C936 + (Discusses Value of Applying Realistic Pressure Gradient Across Sample Penetration Seals During ASTM-E 119 Fire Qualification Test.Nrc Urged to Support Future ASTM & IEEE Stds Activities)
- ML20203K287 + (Discusses Valve Wall Thickness Verification Program.Data & Info Presented by Util at 731228 Meeting Indicates Final Rept Will Be Adequate for Verification That Wall Thickness of Valves Meet Design Requirements)
- ML20236H148 + (Discusses Varga Reply to 870428 Mailgram Re Proof That LOCA Could Not Occur in Reactor Core at Plants.Evidence in Files of Repeated AEC & NRC Repression & Ignorance of Legitimate ACRS Concerns Cited.Congressional Hearings Requested)
- ML20195E494 + (Discusses Variance from SER for TS Amend 143.Plant Review of Fire Protections Matters Discovered,Fire Protection Implementing Procedures Discussed in First Statement Incorporated Into Plant Organization Procedure (NOP) 83FP1)
- ML19339A055 + (Discusses Variance in Pressurizer Code Safety Valve Set Pressures)
- ML19347D672 + (Discusses Variance on Percent Fines Contained in Drainpipe Filter & Cover Sand Protective Layers Located in Tailings Facility Interior Rim & Slopes.Requests Relaxation of Criteria to Permit Higher Percentage of Fines)
- ML20070F888 + (Discusses Various Events & Projects in Cape Cod Communities Re Public Relations Campaign to Audience of Child Bearing Age Women)
- ML19262A139 + (Discusses Velocity Discrepancies of Fairfied Industries,Inc & Rj Wold Calculations of Depths of Rocktop & Subrock Reflectors in Eastern Lake Mi Faulting Studies.Changes Should Not Affect Basic Conclusions of Psar.Svc List Encl)
- ML20092P662 + (Discusses Vendor Equipment Interface Program.Program Encompasses INPO Recommendations.Planned Enhancements Include Expanded Role of Assessment Coordinator & Revised Procedure for Use of Nuclear Network)
- ML19260A157 + (Discusses Vendor Insp Rept 999-50/72-01 on 720404-05.No Noncompliance Noted.Major Areas Inspected:Audit of Crane Co QA Program & Records)
- ML20062D327 + (Discusses Vendor Intent to Release 1,875 Lb Molybdenum Scrap After 820721.Release Acceptable)
- ML20071B343 + (Discusses Vendor Problems W/Qualification Testing Program for Noble Gas Steam Effluent Monitors.Compliance w/NUREG- 0737,Item II.F.1 Will Be Accomplished as Soon as Possible, But Not Later than 840301)
- ML20028G526 + (Discusses Vendor Program Branch Insp on 821129-1202 at Southwest Fabricating & Welding Co.Items Aits F02700232 & F02700260 in QA Program Insp Rept 9900025/82-01 Re Main Steam Piping,Closed.W/O Stated Encl)
- ML19317F058 + (Discusses Vent Valve Insp Requirements & Facility Acceptance Criteria)
- ML19256D041 + (Discusses Vent Valve Insp Requirements at Davis-Besse 1.Test Procedures Tp 200.01 Inadequate.Design Criteria to Be Requested from Licensee)
- ML19322C059 + (Discusses Vent Valve Insp Requirements:For Davis-Besse 1. Acceptance Criteria Not Directly Related to Valve Design Criteria.Sufficient Design Info & Acceptace Criteria from B&W Necessary for Valve Performance Evaluation)
- ML20137K011 + (Discusses Verbal DOJ Declination of Prosecution Re Public Svc Co of Colorado,For Plant)
- IR 05000538/1988001 + (Discusses Verification Survey Results as Suppl to Insp Rept 50-538/88-01 Re Termination of License R-127.Based on Radiological Surveys Facilities & Equipment Contamination Less than Limit & Exposure Measurements Less than Limit)
- ML20062E281 + (Discusses Verification Survey of Cimarron Corp Mixed Oxide Fuel Fabrication Plant,Crescent,Ok)
- ML20091B210 + (Discusses Verification of Annual Radioactive Effluent Summary Data)
- ML20039B503 + (Discusses Verification of Leak Tight Integrity of Pressure Isolation Valves.Continued Testing of Valves 38-26-001 & 38-26-002 Is Under Surveillance Testing Requirements)
- ML20207L243 + (Discusses Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors (USI A-46). Integration of Resolution of USI A-46 W/Resolution of Other Related Seismic Issues Desired)
- ML17352A081 + (Discusses Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors USI A-46, Generic Ltr 87-02)
- ML20207M788 + (Discusses Vermont Yankee & NRC Safety Concern)
- ML20042F408 + (Discusses Vicinity Property Completion Rept for SLC-533S)
- ML19327A663 + (Discusses View on Purging Re Plant Containment Isolation Valves)
- ML19242B491 + (Discusses Views of NRC Employees Re Proposed Mod to Regulations on Securities Ownership.List of Stocks to Be Prohibited Is Unreasonable;Many Companies Only Minimally Involved in Nuclear Industry)
- ML19345G513 + (Discusses Views on Procedural Aspects & Substance of 810211 Order Directing Ga Co to Submit Radiological Contingency Plan.Rejects Implication That Current Plans Are Conclusively Deficient)
- ML20198S040 + (Discusses Views on Safety of B&W Reactors.Issues Raised in Will Be Considered as Part of Reexam of Basic Design Requirements for B&W Reactors.Commissioners Comments on IE Bulletin Provided)
- ML20236S933 + (Discusses Violation Noted During Insp Rept 50-508/82-04 Re Questionable Welds.Items Identified on Nonconformance Rept (NCR 15313) & Implementation of Corrective Action Will Be Entered Into Site Tracking Sys & Accomplished at Restart)
- ML20237J894 + (Discusses Violation Noted During NRC 860304 Exit Interview W/Util Re Brown & Root Failure to Audit QA Program in 1980 & 1981.Disagreements Re Proper Handling of Violation Discussed)
- IR 05000298/1979020 + (Discusses Violation Noted in IE Insp Repts 50-298/79-20 & 50-298/80-05.Package & Vehicle Not Identical Except in Case of Bulk Shipments of Low Specific Activity Radioactive Matls.Citation Appropriate.Corrective Actions Requested)
- ML20133H909 + (Discusses Violation Noted in Insp Repts 50-321/83-15 & 50-366/83-15 Re Several locked-open Valves,Including Fire Protection Valve Observed Unlocked.Violation Applied Only to Unit 1.Change in Administrative Controls Stated)
- ML14188A691 + (Discusses Violation Re Discrimination Against Employee for Engaging in Protected Activity.W/O Stated Notice of Violation)
- ML19312D027 + (Discusses Violation from Insp 30-03866/77-01.Corrective Action Implemented:Personnel Passed Written Examination on 770408.Instructions Issued Delineating Persons Authorized as Radiographers & Assistant Radiographers)
- ML20058J926 + (Discusses Violation from Insp Rept 50-244/90-04 on 900326- 29.Remainder of Ltr Containing Safeguard Info Withheld)
- ML19208B848 + (Discusses Violation of App a Tech Specs,Section 3.8.1, Re Emergency Diesel Generators Inadvertently Being Removed from Svc During Maint)
- ML20214N162 + (Discusses Violation of Govt in Sunshine Act Discovered by Author in Attempt to Find Out How Commission Will Vote on Applicant Motion to Lift Stay of Issuance of Ol.Parties Entitled to 7-day Notice of Commission Affirmation Sessions)
- ML19345F209 + (Discusses Violation of Procedures E 2.1.3.8 & 10CFR50,App B, Subjecting Two Union Members to Potentially Hazardous Situation.Qa Procedure Requirements Should Promote Safety & Documentation)
- ML19345D907 + (Discusses Violations Noted in IE Insp Repts 50-498/79-19 & 50-499/79-19 & to 800430 Order to Show Cause,In Preparation for 800913 Meeting.W/O Encl Documentation Re Welding Program)
- IR 05000458/1988026 + (Discusses Violations Noted in Insp Rept 50-458/88-26 & Forwards Notice of Violation.Requests Response Documenting Specific Actions Taken & Addl Actions Planned to Prevent Recurrence)
- ML20058D281 + (Discusses Violations Noted in Insp Rept 50-029/90-14 & Forwards Notice of Violation)
- IR 05000244/1994005 + (Discusses Violations Noted in Insp Rept 50-244/94-05 During 940208-0308.Corrective Actions:Procedure RSSP-2.1, Safety Injection Functional Test Upgraded to Formally Document Testing of Both Manual Containment Pushbuttons)
- ML17263A673 + (Discusses Violations Noted in Insp Rept 50-244/94-05 During 940208-0308.Corrective Actions:Procedure RSSP-2.1, Safety Injection Functional Test Upgraded to Formally Document Testing of Both Manual Containment Pushbuttons)
- ML20033G711 + (Discusses Violations Noted in Insp Repts 50-445/89-23 & 50-446/89-23 & Forwards Notice of Violation,Util Slides Presented at 900130 Conference & Synopsis of Ofc of Investigations Case 4-89-013)
- ML20212A396 + (Discusses Violations Noted in Insp Repts 50-267/85-28 & 50-267/85-32 Re Security Equipment Reliability.Util Has Started Collecting Data Necessary to Determine Causes & to Establish Trend Analysis Program)
- ML20217R020 + (Discusses Violations Noted in Insp Repts 50-424/97-03 & 50-425/97-03 on 970625.Suppl Response Required to Be Provided to NRC within 30 Days of Ltr Date Due to Determination That Violation B Occurred as Stated)
- ML17156A746 + (Discusses Violations Noted in Insp Repts 50-387/86-21 & 50-388/86-22,in Response to .Since Cable Run Was Straight,No Cable Lubricant Necessary.No Violation of Stated Spec Occurred.Cited Violation Will Be Withdrawn)
- IR 05000269/1992024 + (Discusses Violations Noted in Insp Repts 50-269/92-24, 50-270/92-24 & 50-287/92-24 on 920926-1103 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000)
- IR 05000269/1988025 + (Discusses Violations Noted in Insp Repts 50-269/88-25, 50-270/88-25 & 50-287/88-25 on 880801-15 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty.W/O Notice)