3 D DA/RYLAND h
h COOPERAT/VE eo sox 8i7 reis EAST,W SOUTH = LA CROSSE. WISCONSIN 54601 (608) 788 4 000 December 17, 1981 In reply, please refer to LAC-7984 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis M. Crutchfield Operating Reactors Branch #5 Division of Operating Reactors U. S. Nuclear Regulatory Commission g
n.
Washington, D. C.
20555 g
g
SUBJECT:
DAIRYLAND POWER COOPERATIVE Sc k
M OpO E*
If LA CROSSE BOILING WATER REACTOR (LACBW p
'O E PROVISIONAL OPERATING LICENSE NO. DPR-4 4
O
/E VERIFICATION OF LEAK TIGHT INTEGRITY C
)4J ;.% % [
PRESSURE ISOLATION VALVES
\\-
\\
" f" 3 s '?,
Reference:
(1)
NRC Letter, Crutchfield to Linde ',.
- s dated April 23, 1981.
Gentlemen:
Reference 1 contained " Safety Evaluation by the Office of Nuclear Reactor Regulation Supporting Relief from Requirements of Section XI ASME Code" for Dairyland Power Cooperative, La Crosse Boiling Water Reactor, Docket No. 50-409.
In the Introduction and Discussion paragraph of the above Safety Evaluation, there were ".... identified selected items, not related to the DPC relief request, that require licensee action."
Paragraph 2.1.1 of the Evaluation contained a staff position that Valves 38-26-001 and 38-26-002, which perform a pressure isolation function (and are the only valves in any LACBWR system that are even similar to an Event V configuration), must be considered for testing per Attachment B of Reference 1.
Attachment B was "S.taff Position, Verification of Leak Tight Integrity of Pressure Isolation Valves".
The required actions of Attachment B are completed.
The results of the pressure boundary test conducted in accordance with the require-ments of items la and 2, of Attachment B, along with the test procedures are enclosed.
Implementation of Item lb of Attachment B, is not applicable and was not invoked.
kool,r II 8112230157 011217 PDR ADOCK 05000409 P
pDR
.)
Mr.. Dennis M. Crutchfield LAC-7984 Operating Reactors Branch #5 December 17, 1981 Continued testing of valves 38-26-001 and 38-26-002 for leak tight integrity is under the surveillance testing requirements of the LACBWR Technical Specifications.
If you have any questions, please contact us.
Very truly yours, DAIRYLAND POWE COOPERATIVE h
Frank Linder, General Manager FL: HAT:af cc:
J.
G. Keppler, Director, NRC-DRO III NRC Resident Inspectors..
. Attachmsnt to LAC-7984-P0gs 1 of 4 17.5.2 Alternate Core Spray Check Valve Seat Leakage and Data 1:
Sheet 37.5.3.1 Purpose.
To test for seat leakage of the Altern6te Core Spray Check Valves 38-26-001 and 38-26-002 prior to entering Operational Condition I:
(1)
Af ter each ref ueling outage.
(2)
After each cold shutdown of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more if not tested within the past 9 months.
[t (3)
Prior to returning to service atter maintenance, repair, I
or replacement.
17.5.3.2 Reference.
3 (1)
LACBWR Technical Specifications, Section 4/5.2.22.
l 17.5.3.3 Prerecuis.tes.
(1)
Reactor. pressure 1 175 psig at licise gage on Containment Building Mezzanine Leg'el.
s (2)
Minimum test differential pressare shall not be less
- l than 150 psid.
(3) lleine gage, Containment Building Mezzanine Level,'has been calibrated in the last vear.
17.5.3.4 Procedure.
(1)
Record IIcise pressure gage reading, Containment Building Mezzanine Level 77 (1 175 psig).
PSIG_ f fdL
{
(2)
Verify Valves 38-23-018 thru -022 "CLOSCD."
h5 TEST OF 38-26-001 Last Previous Test Leak Rate (PL1)
GPM_L]g (3)
Drain the section of line between 38-26-001 4
and -002 by removing the pipe cap down stream of 38-23-020 and opening Valve j
38-23-019 and -020.
J2 g u_
t
f/
f ga 2 of 4 (4)
When the line appears to be drained,
. Odd 24N N#
commence measuring the leakage for a minimum of 1 minute.
Record Sample:
06d/32/
AL)
Anount (Oz. o r Gal ) OL m i. f*O M.
Time (Min.)_
r7 pm,%_
Leakage Rate (L)) GPM_ A/4 N O'T E :
If during the draining, flow through the cample line appears -to be pressurized, close all valves previously opened and report findings to the Shift Supervisor.
(5)
Close 38-23-020 and replace pipe cap.
_ S. J.
A TEST OF 38-23-002 Last Previous Test Leak Rate (P 2)
GPM A/)1--
L (6)
Dr,ain the section of line upstream of 38-26-002 by removing the pipe cap down stream of 38-23-022 and openin] 18-23-021 and -022.
pm (7)
When the li.a appears to be dra:ned, close 38-23-022 and open 38-23-018.
gg,g + 4
)
(8)
Open 38-23-022 and neasure the loakage for a ninimum or 1 minute (note fe l. wing Step 4 applies).
Record Sannle:
' 000?9)& (w9l, I
,6. cont (Oz. or Gal)_ J,g) m L Tre i:t in. ) _
_ggg Leal./tje Rate (L2) G P.9g/ f-
,~o403 6 f
(9)
Close 38-23-018 and -019.
Jfg/_
(10)
Close 33-23-021 and -022; replace pipe cap.
jc
' l t
T g
a
[
l
/
l y'
y r
c.g; 3 of 4 I
l
/.
J 17.5.3.5 Leak Rate Test Criteria and Calculations.
[
/
l e/
(1)
Valve 38-26-001:
I s
c (a)
If L3 is < ] GPM or > : and < 5'GPM but <
Y
[P } +
L ).5], the test is acceptable. ___W3 L
(5 P l L
(bh If L} is > 5 GPM, the test is unacceptable, un
)
(c)
If L1 is > [PL]
+ (5-PL1).5], the test frequency is to be increased.
//A (2)
Valve 38-26-002:
f (a)
If L2 is < 1 GPM or > ] and < 5 GPM but <
IP 2 + (5 PL2).51, the to:;t Is acceptable. _ ycr L
a (b)
If L2 is > 5 GPM, the tent is unacceptable.__
f/ pa
(
(c)
If L2 is 1 (PL2+ (5-PL2 ). 51, tiie tes t.
frequency is to be increcae.1.
t/#
FEMARKS:
I r
t
!/
l' AT E
- f. - /3-b'/
PERFORMED r3 Y
- x i v.. n us.
') (Operaf5Y)
APPROVED BY d
(Shitt Supervisor)
/
)
//
/
REVIEWED BY
_ - M/ _
' [#
4 storarangs,<upervisor)
I e
f
kh,;f ' Pcha 4 of 4 (U.,
'OI
- /
NODI F~l C A TIONS E #'
0 ~ Ol' E -
/ <, p i
- j..l (' ' ~
), l' l
tI
/ / / / / //r isfff,,
/
~~d &
-00\\
fp,.24~0o L
.. PRESS. )
f
)
l'.
h lss-z3-ac7 O
6 EEE-::-cos Q}A
(?
e
~ y s p 3 - o/<7 W
J I ' g.2y.c.1/
w x
(5
+
r-
+
4.
_.3 3
(5
%,z j
'M.,M
. a. ) yQs 3-5 2,
v
.~..
38,q3-olg
~ U ~ W"
!)
Pl PE, 3/e ", C S GCH SO, A-lC6 2 4 FEET.
2)
ELBOW'3 2/8 90 *,
Z-Ecco$ C S ; 5 uKET WELD 3
3)
VALv E, 3/e c,'.CEE CRArJE No. 222 H, 3 3 30 PS i WO6 ) CAR E OtJ
{
rTEE.., Scir ItC5 (SO F:E OJT ICR ETKE- //5LD) 6-REQ'D
{
- 4) C A P,
3/8 ";
2 - 5 000 $ C S, S c R D E N D5 - ?_ FE Q'D.
{
l 0)
PE 00cE P C PLQ, IA "- 3/8" C S, S O C r ":T WELO ENDS - 3 REQ'D.
i t
i t