Discusses Violation of App a Tech Specs,Section 3.8.1, Re Emergency Diesel Generators Inadvertently Being Removed from Svc During Maint
ML19208B848
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/29/1978
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19208B784 List:
References
RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 7909210484
Download: ML19208B848 (2)


Text

?

m;y= u

(

.Q~-

L,,,;JWANA_&_MlCMGAN POWER COMPANl DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 June 29, 1978

'Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

On June 16, 1978, we informed NRC Region III verbally and in writing of a violation of the Unit 2 Appendix A Technical Specification Section 3.8.1.lb wherein both emergency diesel generators were inadvertently removed from service during maintenance.

Our investigation into this event is completed and this report is submitted as required by Appendix

(

A Technical Specific,ation Section 6.9.1.8.

We have discussed this serious matter with management of the American Electric Power Service Corporation and together formulated the " Corrective Actions Taken to Prevent Recurrence "

I believe these actions will go a long way towards not only preventing recurrence of this event on the emergency diesel generators, but will also prevent similar incidents from occurring on other safety-related equipment.

The American Electric Power Service Corporation management was at the plant on May 3-4, 1978, to discuss the urgent need to reduce the number of Licensee Event Reports.

At that time we jointly came up with several action items which are being followed through to stem potential problems at the source.

Although this recent incident is particularly disturbing, we in management are taking positive steps to enhance the quality of our operations and the support of the plant by the American Electric Power Service Corporation.

In addition to the corrective actions stated in the attached Licensee Event Report, we will review our current practice of training the plant operating and maintenance staff fnr work of this type and will augment retraining and requalification as necessary.

Sincerely, d

M 7909210 %

{Q (p g g D.V. Shaller JcS0iO2 Plant Manager

.JUL 0 31978

Mr. J.G. Keppler June 29, 1978 Page 2 of 2

/bab cc:

J.E. Dolan R.W. Jurgensen R.F. Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker RO:III R.C. Callen MPSC P.W. Steketee. Esq.

R. Walsh, Esq.

G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC J.F. Stietzel R.S. Keith Dir., IE (40 copies)

Dir., MIPC (4 copies) t 390103