Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20261L439 + (CR Envelope/Eab Main Area HVAC ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C856 + (CR Envelope/Eab Main Area HVAC ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41851 1)
- ML20260C899 + (CR Envelope/Eab Main Area HVAC ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41865 1)
- ML20260D183 + (CR Envelope/Eab Main Area HVAC ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41923 1)
- ML090500299 + (CR IP2-05-03986, MW-111 Tritium Contamination)
- ML11313A147 + (CR New Summary - Southern Company)
- ML052100414 + (CR Summary Report)
- ML19249F162 + (CR Van Neil 731026 Supplemental Testimony Re Emergency Planning)
- ML19249F157 + (CR Van Neil 731026 Supplemental Testimony Re Industrial Security Program)
- ML102360566 + (CR Word Search Query, Farley)
- ML042740522 + (CR X/Qs Using ARCON96 Code - Non-LOCA Releases)
- ML21067A191 + (CR-2014-001074, Contamination Identified on the Ground 1)
- ML21067A209 + (CR-2015-000324, Contamination Identified on the Ground 0)
- ML21067A192 + (CR-2019-0066, I & C (Isolation and Control) Boundary Challenge)
- ML21067A205 + (CR-2019-0101, Annul Completed FSS Survey Units 12205 a, B, C, D & E)
- ML21067A193 + (CR-2019-0165, LTP Revision Required After Non-impacted Storm Drain Piping Became Impacted)
- ML21067A180 + (CR-2019-0176, Small Piece of Concrete Above Background Was Detected by Orise)
- ML21067A221 + (CR-2019-0177, DRP Detected by Orise HPs in SU12204A)
- ML21067A210 + (CR-2020-0001, Exposed Wood Timber, Piping and Large Boulder in FSS Survey Unit 12204C)
- 3F1212-06, CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review + (CR-3 Extended Power Uprate LAR Supplement to Support NRC Accident Dose Branch (Aadb) Technical Review)
- 3F1012-06, CR-3 Extended Power Uprate LAR Supplement and Response to Third Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review + (CR-3 Extended Power Uprate LAR Supplement and Response to Third Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review)
- ML20069A024 + (CR-3 License Transfer Enc 1 Order)
- ML20069A025 + (CR-3 License Transfer Enc 2 Amendment)
- ML20069A026 + (CR-3 License Transfer Enc 2 Att 1 FOL Amnd 258.doc)
- ML20069A027 + (CR-3 License Transfer Enc 3 SE)
- ML20101G583 + (CR-3 License Transfer SE Corrected)
- ML20101G582 + (CR-3 License Transfer SE Corrected Cover Letter)
- 3F0486-02, CR-3 Pump Support Configuration Study + (CR-3 Pump Support Configuration Study)
- ML070780197 + (CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch)
- ML070780412 + (CR-PNP-1990-01467, During Inspection of 2nd Pass FW-8 MT of Weld Revealed Indication 4 Long Crack- Like Linear)
- ML070780416 + (CR-PNP-1990-09249, Torus Containment Shell One Area of Pitting Exceeding Acceptance Criteria of .066 Inches Base Depth)
- ML070780367 + (CR-PNP-1996-00396, High Mitrate Levels Exists in the Tbccw System)
- ML070780372 + (CR-PNP-1996-09593, Crack in Housing for MO-1001-34A)
- ML070780418 + (CR-PNP-2000-09228, P-161C Suction Piping 98 Deg. Elbow for C Continuous SSW Hypo Pump Cracked and Leaking Into Burm Area)
- ML070780431 + (CR-PNP-2001-02275, a SSW Discharge Piping 20 Foot Section of Rubber Lining Peeled Off of Piping Exposing Bare Metal)
- ML070780439 + (CR-PNP-2001-04048, Received SBO DG Fuel Tank Leakage Alarm Alert Wet Probes)
- ML070780453 + (CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm)
- ML070780491 + (CR-PNP-2001-04238, HCU 50-31 Leak)
- ML070780508 + (CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak)
- ML070780529 + (CR-PNP-2001-09403, Fire System Has Broken Pipe Between 12-D-8, 12D-9 in Aog Building)
- ML070780615 + (CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted)
- ML070780632 + (CR-PNP-2002-01414, the Concrete Shield Block for the Drywell Equipment Hatch Was Removed Prior to the Reactor Being Less than 212F)
- ML070780545 + (CR-PNP-2002-09283, Unable to Reassemble E-122B, B Tbccw Heat Exchanger Head)
- ML070780564 + (CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4) Several Times During Shift on 06/19/2005)
- ML070780603 + (CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had Pitting)
- ML070780624 + (CR-PNP-2003-01413, Secondary Containment Leakrate Testing Was Aborted)
- ML070780653 + (CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased But Acceptable Local Leak Rate Test Results)
- ML070790110 + (CR-PNP-2003-01582, Primary Containment Isolation Valve (PCIV) 6-CK-62B Failed to Meet Its Individual Valve Local Leak Rate Test (LLRT) Acceptance Criteria)
- ML071560251 + (CR-PNP-2003-01618 with Supporting Report (with Redacted Notes) 1st Page for Inspector)
- ML070790183 + (CR-PNP-2003-02976, Pilgrim Construction Activity and Damage to Underground Utilities)
- ML070790161 + (CR-PNP-2005-02621, Rollup CR with Various Problems Inservice Inspection Related)