..:ICR#IP2-05-03986, MW-1 11 Tritium Contamination 4'F Corrective Description
'Action Date ACE-Lower Tier
.11/2/05 3
Add CR# 05-4151 to ACE 11/2/05 4
ACE - assign additional CA's as needed, assigned to Paul Bode 11/23/05 5
ACE - assign additional CA's as needed, reassigned to B. Axelson 11/23/05 6
K-T / complete (requires more info / 45 days for update) 12/15/05 2
CARB Documentation (12/20) 1/05/06 26 Update status of K-T 2/2/06 27:
CARB - add dates, K-T due on 2/1, LT ACE 2/14/06 7
Complete Phase 1 Wells 2/27/06 11 Develop long term onsite will monitoring program 2/27/06 16 Identify unlined sumps/rad storage tanks which could contribute to 2/28/06 GW contamination 13 Identify all onsite underground piping/tanks with radioactive fluids 3/3/06 28 Document presentation of.K-T to CARB and update LT ACE 3/30/06 10 Develop / implement GW tracer program for various onsite systems 3/31/06 19 Add MW-38 to REMP program 3/31/06 20 Technical assistance outreach to EPRI on monitoring wells 3/31/06 25 OE package to INPO 3/31/06 9
Determine if remediation is required for tritium contamination 4/14/06 12 Update licensing documentation for monitoring well modification 4/15/06 14 Update NRC 30 day report 4/15/06 15 Update ODCM and RG 1.21 report based on all collected data 4/15/06.
17 Update 10 CFR 50.75(g) file based on investigation 4/15/06 18 Benchmark other facilities on SFP inventory, boron mass balance, 4/15/06 leak/level monitoring, etc...
21-24 Add to departmental training 4/15/06 8
Complete Hydrology Study 4/20/06