CR-2019-0165, LTP Revision Required After Non-impacted Storm Drain Piping Became Impacted
ML21067A193
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/10/2021
From:
ZionSolutions
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21067A225 List:
References
ZS-2021-0001
Download: ML21067A193 (3)


Text

~ Condition Report ENERGYSOLUTIONS ES-ZION-CR-2019-0165 Page 1 of 3 DETAILS Division: IRA;#175;#LT Name:

Description:

1LTP Revision required after non-impacted storm drain piping became impacted On Tuesday, May 7, 2019, C/LT Technicians collected sediment samples from the bottom of manhole access to the Switchyard storm drain in survey units 10214C and 10214D. The sediment sample collected from the west access point resulted in Cs-137 and Co-60 positively detected at 2.22E+00 pCi/g and 1.80E-01pCi/g respectively. When directly compared against the Operational DCGLs for subsurface soil, the analytical results for the sample (L2-10214C-RJGS-001SM) produced a SOF of 1.514. Consequently, the northern storm drains previously classified as non-impacted are now impacted due to discovery.

Start Date: 11/14/2019 4:27:00 PM End Date: 12/18/2019 12:00:00 AM Status: Completed l l 1 1 PROPERTIES SIG Level: 3 Date/Time Initiated: 11/14/2019 4:27:00 PM Brief

Description:

LTP Revision required after non-impacted storm drain piping became impacted

==

Description:==

On Tuesday, May 7, 2019, C/LT Technicians collected sediment samples from the bottom of manhole access to the Switchyard storm drain in survey units 10214C and 10214D. The sediment sample collected from the west access point resulted in Cs-137 and Co-60 positively detected at 2.22E+00 pCi/g and 1.80E-01pCi/g respectively. When directly compared against the Operational DCGLs for subsurface soil, the analytical results for the sample (L2-10214C-RJGS-001SM) produced a SOF of 1.514. Consequently, the northern storm drains previously classified as non-impacted are now impacted due to discovery.

Immediate Actions:

Notified Supervision and NRC Recommended Actions:

Update TSD 14-016,Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Zion End State. Perform a 50.59 review of TSD change. Perform a revision to Zion LTP.

Date Discovered: 11/14/2019 Issue Identified By: Initiator Related Documents:

Reviewed Date/Time: 11/15/2019 12:00:00 AM Maintenance Rule Applicable? False Reportability Applicable? False Operability Review Required? False CAQ/NONCAQ? CAQ Page 1 of 3

~ Condition Report ENERGYSOLUTIONS ES-ZION-CR-2019-0165 Page 2 of 3 50.75g Issue? True 7230D Issue? False MRC Review Meeting Date:

MRC Approval: False MRC Comments:

Responsibilities Initator: Jerry X. Houff Shift Manager: Jason P. Pacheco-ext CR Owner: Timothy W. Plutchak Events Step Person Start End Date Date Initiation: Jerry X. Houff 11/14/2019 11/14/2019 OP Review: Jason P. Pacheco-ext 11/14/2019 11/15/2019 Screening: Timothy W. Plutchak 11/15/2019 11/21/2019 MRC Review: Timothy W. Plutchak Pending CA Completion: Timothy W. Plutchak 11/21/2019 12/18/2019 Verify and Closure: Timothy W. Plutchak 11/21/2019 12/18/2019 Page 2 of 3

~ Condition Report ENERGYSOLUTIONS ES-ZION-CR-2019-0165 Page 3 of 3 Action - ES-ZION-ACT-2019-0158 Action Type: Corrective Due Date: 12/12/2019 Action Assigned To: Gerald Wood- Date Completed: 12/17/2019 ext Action:

Update TSD 14-016, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Zion End State. Perform a revision to Zion LTP.

Results:

TSD 14-016 ( revision 1) completed, 50.59 completed, peer reviews and department manager approval completed. New revision of TSD 14-016 issued on 12/17/19.

Action - ES-ZION-ACT-2019-0159 Action Type: Corrective Due Date: 12/12/2019 Action Assigned To: Jerry X. Houff Date Completed: 12/5/2019 Action:

Perform a 50.59 Review of TSD14-016 change.

Results: A 50.59 has been performed for TSD 14-016 Revision 1 and is attached.This action can be closed.SKM_C454e19120507070.pdf Trends Cause Codes: A7-B2-Radiological - Hazardous material problem Event Codes: 3E - Radiation Protection - Equipment or area contamination Verification Verification: Timothy W. Plutchak 12/18/2019 Verification Comments Expected response actions have been satisfied.