Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A933 + (09:39:24, 8 January 2025)
- GO2-95-142, Responds to NRC Ltr Re Violations Noted Insp Rept 50-397/95-18.Corrective Actions:Counseled Individuals Involved + (09:39:25, 8 January 2025)
- GO2-95-143, Informs That Actions Described in First Paragraph of Item I of GL 89-10,were Completed by 950628 + (09:39:57, 8 January 2025)
- ML17291A927 + (09:40:36, 8 January 2025)
- GO2-95-136, Forwards Rev 22 to TR WPPSS-QA-004, Operational QA Program Description. Rev Reflects Mgt & Organizational Changes & Modifies Reporting Requirements as Listed + (09:40:37, 8 January 2025)
- ML17291A921 + (09:41:01, 8 January 2025)
- GO2-95-137, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-16 on 950522-25.Corrective Actions:Documented Surveys of Dose Rates Around Barrel Performed & Series of Meetings Held & mock-up Training Conducted + (09:41:02, 8 January 2025)
- ML17291A916 + (09:41:31, 8 January 2025)
- ML17291A915 + (09:41:33, 8 January 2025)
- ML17291A913 + (09:41:34, 8 January 2025)
- ML17291A911 + (09:41:36, 8 January 2025)
- GO2-95-124, Comment on Review of NRC Insp Rept Content,Format & Style. NRC Insp Repts Should Provide Balanced Perspective, Reflecting Licensee Strengths & Positive Aspects of Programs & Activities Reviewed + (09:41:38, 8 January 2025)
- GO2-95-135, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-03.Corrective Actions:Drawing Revised to Include Piping Bypass & Procedure Extensively Revised to Correct Error Re Influence Adjustment Ring Setting on Relief Valve + (09:41:42, 8 January 2025)
- ML17291A908 + (09:41:46, 8 January 2025)
- ML17291A906 + (09:41:47, 8 January 2025)
- ML17291A905 + (09:41:48, 8 January 2025)
- 05000397/LER-1995-010, :on 950609,HPCS DG Declared Inoperable Due to Discovery That TS Test Method Incomplete.Caused by Inadequate Testing Procedure.Test Procedure for HPCS DG Reviewed & Special Test Procedures Written + (09:41:55, 8 January 2025)
- GO2-95-127, Monthly Operating Rept for June 1995 for WNP-2 + (09:41:57, 8 January 2025)
- IR 05000397/1995015 + (09:42:20, 8 January 2025)
- IR 05000423/2006003 + (09:42:22, 8 January 2025)
- ML17291A896 + (09:42:24, 8 January 2025)
- ML17291A893 + (09:42:26, 8 January 2025)
- ML17291A884 + (09:42:28, 8 January 2025)
- ML17291A882 + (09:42:31, 8 January 2025)
- ML17291A877 + (09:42:32, 8 January 2025)
- GO2-95-115, Responds to NRC Re Violation Noted in Insp Rept 50-397/95-09.Corrective Actions:Equipment Replacement Interval Reviewed for Safety Related Items for Which Basis for Qualified Life Other than Thermal Aging + (09:42:33, 8 January 2025)
- ML17291A872 + (09:42:36, 8 January 2025)
- ML17291A870 + (09:42:37, 8 January 2025)
- ML17291A869 + (09:42:38, 8 January 2025)
- ML17291A867 + (09:42:39, 8 January 2025)
- IR 05000213/2003014 + (09:42:54, 8 January 2025)
- ML17291A863 + (09:42:55, 8 January 2025)
- ML17291A860 + (09:42:56, 8 January 2025)
- IR 05000397/1995016 + (09:43:01, 8 January 2025)
- ML17291A857 + (09:43:03, 8 January 2025)
- IR 05000397/1995013 + (09:43:30, 8 January 2025)
- ML17291A853 + (09:43:32, 8 January 2025)
- ML17291A852 + (09:43:33, 8 January 2025)
- 05000397/LER-1995-006, :on 950405,reactor Scram Occurred During Surveillance Testing Due to Protective Sys Relay Failure. Replaced Failed Relay Before Plant Startup + (09:43:35, 8 January 2025)
- 05000397/LER-1995-006-01, Forwards LER 95-006-01 Re Reactor Scram During Surveillance Testing Due to Protective Sys Relay Failure + (09:43:37, 8 January 2025)
- GO2-95-112, Forwards Revised Met Tower Stability Class Data Point Info File Indicating Point as Differential Temp in Degrees F + (09:43:38, 8 January 2025)
- ML17291A846 + (09:43:40, 8 January 2025)
- ML17291A845 + (09:43:41, 8 January 2025)
- ML17291A844 + (09:43:42, 8 January 2025)
- GO2-95-106, Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles + (09:43:43, 8 January 2025)
- ML17291A840 + (09:43:45, 8 January 2025)
- GO2-95-105, Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 + (09:43:46, 8 January 2025)
- ML17291A837 + (09:43:48, 8 January 2025)
- ML17291A836 + (09:43:50, 8 January 2025)
- GO2-95-104, Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 + (09:43:51, 8 January 2025)
- ML17291A834 + (09:43:51, 8 January 2025)