Lists Insps & Activities Region IV Plans to Perform During Next Semiannual Plant Performance Review in Oct 1995
ML17291A852
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/14/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9506190386
Download: ML17291A852 (5)


Text

ptt RE

~ ~C+

UNITED STATES CLEAR REGULATORY COMMISSIO R EG I ON I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 JUN l 4 )995 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, HD 1023

Richland, Washington 99352

SUBJECT:

WNP-2 Semiannual Plant Performance Review The Regional staff has recently completed the Semiannual Plant Performance Review (SPPR) for all operating power reactors in Region IV.

The SPPR provided an integrated assessment of licensee performance with the intent of identifying performance trends and adjusting inspection resources accordingly.

All technical divisions, including senior Region IV management, participated in the review of WNP-2's safety performance that covered the period October 1994 through Harch 1995.

As a result of our review, increased inspection resources in the areas of Operations and Maintenance were proposed.

During the months leading up to the next scheduled SPPR in October

1995, Region IV plans to perform inspections and activities as outlined in the table below:

Ins ection Area Control Room Observations (IP 71715)

Motor Operated Valves (TI 2515/109)

Initial Operator License Examination Preparation Safety Assessment/equality Verification Program (IP 40500)

Emergency Preparedness:

Operational Status (IP 82701)

Initial Operator License Examination Planned Ins ection Date June 1995 July 1995 July 1995 August 1995 August 1995 August 1995 Number of

~Ins ectors This list does not include the routine resident inspection effort and unannounced inspections.

These inspection plans are tentative and may be

."C~":i '7-9506i90386 950614 PDR ADOCK 05000397

Washington Public Power Supply System modified due to emerging issues or other resource demands of higher priority.

We will make every effort to keep you informed of changes as they occur.

Region IV reviews pending inspection efforts on a weekly basis, looking ahead 6 weeks into the future.

As we have done in the past, we will contact your nuclear licensing department with specific details of these announced inspections as the schedule becomes firm.

If you have any questions regarding this information, please contact Howard Wong of my staff at 510/975-0296.

Sincerely, Docket:

50-397 License:

NPF-21 A. Bill Beach, Director Division of Reactor Projects CC:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Hanager P.O.

Box 968, HD 927H

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, HD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Hanager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968

Washington Public Power Supply System Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

N.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System JUN I 4 I995 bcc to DMB (IE51) bcc distrib.

by RIV:

L. J.

Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

To receive copy of document, indicate in box: "C" ~ Copy without enclosures "E" ~ Copy with enclosures "N" ~ No copy C:DRP/TSS I

LAYandell; f 6/iL,/95 D DRP Beach.

6// /95 0

CAL CO Y

Washington Public Power Supply System JUN l 4 l995 bcc to DMB (IE51) bcc distrib.

by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

To receive copy ef document, indicate in box: "C" ~ Copy without enciosures "E" ~ Copy with enclosures "N" ~ No copy C:DRP/TSS LAYandell; f 6/ Q/95 D:DRP Beach.

6// /95 0

CO