Forwards Insp Rept 50-397/95-16 on 950522-25.Apparent Violations Being Considered for Escalated Enforcement Action
ML17291A857
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/13/1995
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A858 List:
References
EA-95-109, NUDOCS 9506200237
Download: ML17291A857 (7)


See also: IR 05000397/1995016

Text

PRIC)RI-rY Z

REGULA

<~XKFQ@$8RHN Efi'KBRKIEKJTIO

ZSTEM

( RIDS )

ACCESSION NBR:9506200237

DOC.DATE: 95/06/13

NOTARIZED: NO

DOCKET

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

. 05000397

~ AUTH.NAME

AUTHOR AFFILIATION

OLLINS,S.J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/95-16

on 950522-25.Apparent

violations being considered

for escalated

enforcement

action.

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTRj ENCLj

SIZE: X+I7

TITLE: Environ

a Radiological

(50 DKT)-Insp Rept/Notice of Violation Respons

NOTES:

RECIPIFNT

ID CODE/NAME

PD4-2

PD

INTERNAL~'I LEVEN

NRR/D SP/PIPB

OE DIR

RES

RGN4

FILE

01

TERNAL: NOAC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/TTC

NMSS/SGTB

TSF5

NUDOCS-ABSTRACT

OGC/HDS3

RGN4

DRSS/RPB

RGN4/FIPS

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

C

C

L,

N

E'OTE

TO ALL"RIDS RECIPIEi~S:,

PLEASE HELP VS TO RED VCE WASTE! COih'TACTTHE DOCUMENTCONTROL

DESK, ROOM PI -37 (EXT. 504-20S3

) TO ELIMIYATE YOVR RAMIE FROiI

DISTRIDI."I'IOY.LISTS FOR DOCUMEYTS YOU DOi "I'

L'ED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

17

ENCL

17

a>4 ~IC4'C

~C

P

>>**t<<

UNIT E D STATES

CLEAR REGULATORY COMMISSI

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

June

13,

1995

EA 95-109

Washington

Public

Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-16

This refers to the inspection

conducted

by Messrs;

Blaine Murray and

Michael

P.

Shannon of this office on May 22-25,

1995.

The inspection

included

a review of activities authorized for your Washington Nuclear Project-2

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

The radiation protection

program

was examined during this inspection.

Within

this area,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

two apparent violations were

identified and are being considered

for escalated

enforcement

action

accordance

with the "General

Statement

of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy),

10 CfR Part

2, Appendix C.

The

apparent violations involved the failure to:

(1) maintain continuous health

physics oversight of work activities in

a high radiation

area

and

(2) provide

proper instructions to radiation workers.

Accordingly,

no Notice of Violation

is presently

being issued for these

inspection findings.

In addition,

please

be advised that the number

and characterization

of apparent violations

described

in the enclosed

inspection report

may change

as

a result of further

NRC review.

In addition, it was identified that workers entered

the radiologically

controlled area without proper dosimetry,

and this was in violation of

Technical Specification 6.8.1.

This violation is not being cited because

the

criteria in paragraph

VII:B.2 for licensee-identified

violations of Appendix

C

to

10 CfR Part

2 of the

NRC's "Rules of Practice,"

were satisfied.

This

violation was

an isolated

occurrence

and your staff took prompt and effective

actions to correct the problem.

An enforcement

conference

to discuss

these

apparent violations has

been

scheduled

for June

28,

1995, at 8:30 a.m. at our office.

This was confirmed

950b200237 950bi3

PDR

ADOCK 05000397

8

PDR

Washington

Public

Power

Supply System

on June

5,

1995, during

a telephone call between

Nr.

K. Perkins of this office

and yourself.

The decision to hold

an enforcement

conference

does not mean

that the

NRC has determined

that

a violation has occurred or that enforcement

action will be taken,

The purposes

of this conference

are to discuss

the

apparent violations, their causes

and safety significance;

to provide you the

opportunity to point out any errors

in our inspection report;

and to provide

an opportunity for you to present your proposed corrective actions.

In

addition, this is

an opportunity for you to provide

any information concerning

your perspectives

on:

(1) the severity of the violations,

(2) the application

of the factors that the

NRC considers

when it determines

the amount of a civil

penalty that

may

be assessed

in accordance

with Section VI.B.2 of the

Enforcement

Policy,

and

(3) any other application of the Enforcement Policy to

this case,

including the exercise of discretion in accordance

with Section

VII.

You will be advised

by separate

correspondence

of the results of our

deliberations

on this matter.

No response

regarding

these

apparent violations

is required at this time.

A concern

was identified involving the implementation of your specific

radiation work permit program.

Your radiation work permit program appeared

to

be ineffective in that sufficient radiological

information was not included

on

some specific radiation work permits.

This concern is discussed

in

Section 2.4.6 of the enclosed

inspection report.

Please

discuss

your

assessment

of this concern during the June

28,

1995,

enforcement

conference.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosure will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket;

50-397

License:

NPF-21

Samuel

J. Collins, Director

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Inspection

Report

50-397/95-16

Washington Public Power

Supply System

cc w/enclosures:

Washington Public

Power Supply System

ATTN:

J.

K. Swailes,

WNP-2 Plant Hanager

P,O.

Box 968,

HD 927M

Richland,

Washington

99352-0968

Washington

Public

Power Supply System

ATTN:

G.

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Hanager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

P,

R.

Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

H. K. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public

Power

Supply System

E-Mail report to D. Sullivan (DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE06)

bcc distrib,

by RIV:

L. J. Callan

DRSS-FIPB

(Hodges)

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, MS:

TWFN 9E10)

G.

F. Sanborn,

EO

W. L. Brown,

RC

B. Murray, DRSS/FIPB

WNP-2 Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

W.

B. Jones,

ES

J.

Lieberman,

OE,

(MS

T H5)

M. P.

Shannon,

DRSS/FIPB

DOCUMENT NAME:

0: iFIPBiMPSiWN2516RP.MPS

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" = Copy with enclosures "N" ~ No copy

C: FIPB

RIV'FIPB

  • MPShannon:nh
  • BMurray

06/

-/95

06/

/95

D:DRSS

SJCollin

06/

/95

"Previous y concurre

.

EO

  • GFSanborn

06/

/95

DD:DRSS

RAScar

06/

5

OFFICIAL RECORD

COPY

D:DRP

ABBeach

06/ ~95

Washington Public

Power

Supply System

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB ( IE06)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

(Hodges)

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

G.

F. Sanborn,

EO

W.

L. Brown,

RC

B. Hurray,

DRSS/FIPB

WNP-2 Resident

Inspector

MIS System

RIV Fil e

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

W. B. Jones,

ES

J.

Lieberman,

OE,

(HS

7 H5)

M.

P.

Shannon,

DRSS/FIPB

DOCUMENT NAME:

0: ttF IPBiHPSiWN2516RP. MPS

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

C: FIPB

RIV: F IPB

  • MPShannon:nh
  • BMurray

06/

/95

06/

/95

D:DRSS

SJCollin

06/

/95

  • Previous y concurred.

EO

  • GFSanborn

06/

/95

DD:DRSS

RAScar

06/

5

OFFICIAL RECORD

COPY

D:DRP

ABBeach

06/ ~95