Text
PRIC)RI-rY Z
REGULA
<~XKFQ@$8RHN Efi'KBRKIEKJTIO
ZSTEM
( RIDS )
ACCESSION NBR:9506200237
DOC.DATE: 95/06/13
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
. 05000397
~ AUTH.NAME
AUTHOR AFFILIATION
OLLINS,S.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/95-16
on 950522-25.Apparent
violations being considered
for escalated
enforcement
action.
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED:LTRj ENCLj
SIZE: X+I7
TITLE: Environ
a Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
NOTES:
RECIPIFNT
ID CODE/NAME
PD4-2
INTERNAL~'I LEVEN
NRR/D SP/PIPB
OE DIR
RGN4
FILE
01
TERNAL: NOAC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/TTC
NMSS/SGTB
TSF5
NUDOCS-ABSTRACT
OGC/HDS3
RGN4
DRSS/RPB
RGN4/FIPS
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
C
C
L,
N
E'OTE
TO ALL"RIDS RECIPIEi~S:,
PLEASE HELP VS TO RED VCE WASTE! COih'TACTTHE DOCUMENTCONTROL
DESK, ROOM PI -37 (EXT. 504-20S3
) TO ELIMIYATE YOVR RAMIE FROiI
DISTRIDI."I'IOY.LISTS FOR DOCUMEYTS YOU DOi "I'
L'ED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
17
ENCL
17
a>4 ~IC4'C
~C
P
>>**t<<
UNIT E D STATES
CLEAR REGULATORY COMMISSI
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
June
13,
1995
EA 95-109
Public
Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-16
This refers to the inspection
conducted
by Messrs;
Blaine Murray and
Michael
P.
Shannon of this office on May 22-25,
1995.
The inspection
included
a review of activities authorized for your Washington Nuclear Project-2
facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
The radiation protection
program
was examined during this inspection.
Within
this area,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
two apparent violations were
identified and are being considered
for escalated
enforcement
action
accordance
with the "General
Statement
of Policy and Procedure for NRC
Enforcement Actions" (Enforcement Policy),
10 CfR Part
2, Appendix C.
The
apparent violations involved the failure to:
(1) maintain continuous health
physics oversight of work activities in
a high radiation
area
and
(2) provide
proper instructions to radiation workers.
Accordingly,
is presently
being issued for these
inspection findings.
In addition,
please
be advised that the number
and characterization
of apparent violations
described
in the enclosed
inspection report
may change
as
a result of further
NRC review.
In addition, it was identified that workers entered
the radiologically
controlled area without proper dosimetry,
and this was in violation of
Technical Specification 6.8.1.
This violation is not being cited because
the
criteria in paragraph
VII:B.2 for licensee-identified
violations of Appendix
C
to
10 CfR Part
2 of the
NRC's "Rules of Practice,"
were satisfied.
This
violation was
an isolated
occurrence
and your staff took prompt and effective
actions to correct the problem.
An enforcement
conference
to discuss
these
apparent violations has
been
scheduled
for June
28,
1995, at 8:30 a.m. at our office.
This was confirmed
950b200237 950bi3
ADOCK 05000397
8
Public
Power
Supply System
on June
5,
1995, during
a telephone call between
Nr.
K. Perkins of this office
and yourself.
The decision to hold
an enforcement
conference
does not mean
that the
NRC has determined
that
a violation has occurred or that enforcement
action will be taken,
The purposes
of this conference
are to discuss
the
apparent violations, their causes
and safety significance;
to provide you the
opportunity to point out any errors
in our inspection report;
and to provide
an opportunity for you to present your proposed corrective actions.
In
addition, this is
an opportunity for you to provide
any information concerning
your perspectives
on:
(1) the severity of the violations,
(2) the application
of the factors that the
NRC considers
when it determines
the amount of a civil
penalty that
may
be assessed
in accordance
with Section VI.B.2 of the
Enforcement
Policy,
and
(3) any other application of the Enforcement Policy to
this case,
including the exercise of discretion in accordance
with Section
VII.
You will be advised
by separate
correspondence
of the results of our
deliberations
on this matter.
No response
regarding
these
apparent violations
is required at this time.
A concern
was identified involving the implementation of your specific
radiation work permit program.
Your radiation work permit program appeared
to
be ineffective in that sufficient radiological
information was not included
on
some specific radiation work permits.
This concern is discussed
in
Section 2.4.6 of the enclosed
inspection report.
Please
discuss
your
assessment
of this concern during the June
28,
1995,
enforcement
conference.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket;
50-397
License:
Samuel
J. Collins, Director
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection
Report
50-397/95-16
Washington Public Power
Supply System
cc w/enclosures:
Washington Public
Power Supply System
ATTN:
J.
K. Swailes,
WNP-2 Plant Hanager
P,O.
Box 968,
HD 927M
Richland,
99352-0968
Public
Power Supply System
ATTN:
G.
E.
C.
Doupe,
Esq.
3000 George
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Hanager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public
Power Supply System
ATTN:
P,
R.
Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
& Strawn
ATTN:
H. K. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public
Power
Supply System
E-Mail report to D. Sullivan (DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE06)
bcc distrib,
by RIV:
L. J. Callan
DRSS-FIPB
(Hodges)
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB, MS:
TWFN 9E10)
G.
F. Sanborn,
W. L. Brown,
RC
B. Murray, DRSS/FIPB
WNP-2 Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
W.
B. Jones,
J.
Lieberman,
OE,
(MS
T H5)
M. P.
Shannon,
DRSS/FIPB
DOCUMENT NAME:
0: iFIPBiMPSiWN2516RP.MPS
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" = Copy with enclosures "N" ~ No copy
C: FIPB
RIV'FIPB
- MPShannon:nh
- BMurray
06/
-/95
06/
/95
D:DRSS
SJCollin
06/
/95
"Previous y concurre
.
- GFSanborn
06/
/95
DD:DRSS
RAScar
06/
5
OFFICIAL RECORD
COPY
D:DRP
ABBeach
06/ ~95
Washington Public
Power
Supply System
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB ( IE06)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
(Hodges)
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
G.
F. Sanborn,
W.
L. Brown,
RC
B. Hurray,
DRSS/FIPB
WNP-2 Resident
Inspector
MIS System
RIV Fil e
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
W. B. Jones,
J.
Lieberman,
OE,
(HS
7 H5)
M.
P.
Shannon,
DRSS/FIPB
DOCUMENT NAME:
0: ttF IPBiHPSiWN2516RP. MPS
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
C: FIPB
RIV: F IPB
- MPShannon:nh
- BMurray
06/
/95
06/
/95
D:DRSS
SJCollin
06/
/95
- Previous y concurred.
- GFSanborn
06/
/95
DD:DRSS
RAScar
06/
5
OFFICIAL RECORD
COPY
D:DRP
ABBeach
06/ ~95