~~~ ~~au.
'e C>
o Cy J
4) 0O
. ~,
Vl 0
lP QN
+**pl UNITEDSTATES CLEAR REGULATORY COMMISSIO REGION IV 611 RYANPLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011 6064 Duly 21, 1995 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023
- Richland, Washington 99352
SUBJECT:
FEDERAL EMERGENCY MANAGEMENT AGENCY REPORTS Enclosed are copies of the Federal Emergency Management Agency's (FEMA) Final Drjll Reports for the March 15,
- 1995, Oregon State Laboratory Drill and the March 16,
- 1995, Washington State Laboratory Drill site-specific to the WNP-2 Nuclear Power Plant.
The reports indicate that FEMA observed no deficiencies or Areas Requiring Corrective Actions (ARCA) during the drills.
No response to the NRC is required.
If you have any further questions, please contact Mr. Arthur D. Mcgueen at (510) 975-0241.
Sincerely,
Enclosure:
As stated Docket:
50-397 Ross A. Scarano, Director Division of Radiation Safety and Safeguards cc w/o enclosure:
Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, MD 927M
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O.
Box 968, MD 396
- Richland, Washington 99352-0968 9507260i 5000~F7 boa roach, aso 6
jl
Washington Public Power Supply System Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A. Swank, WNP-2 Licensing Manager P.O.
Box 968 (Mail Drop PE20)
- Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
P.
R.
Bemis, Director Regulatory and Industry Affairs P.O.
Box 968 (Mail Drop PE20)
- Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190
- Prosser, Washington 99350-0190 Winston 5 Strawn ATTN:
M. H. Philips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502 Larry E. Moore, RAC Chairman FEMA Region X
PT Division (PT-TE-REP) 130 228th Street, S.W.
Bothell, Washington 98021-9796
Washington Public Power Supply System DISTRIBUTION w re ort:
DMB (A045)
WNP-2 Resident Inspector ADMcQueen, WCFO (DRSS/RIB)
J. Clifford, NRR Project Manager (MS 13 E18)
RIB Action Item File (Hodges)
RIV Fil e bcc w/o report:
L. J. Callan MIS System Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
B. Henderson (PAO, WCFO)
Branch Chief (DRP/E, WCFO)
C. A. Hackney, SLO T. Essig, NRR/DOTS (MS 9 H15)
E.
F.
- Fox, NRR/DOTS/TERB (MS 9 H15)
E.
F. Bates, IRC C. A. Hackney, SLO DOCUMENT NAME:
0: iRIBiADMiE-95-40.ADM RIV:RIB AC: RIB DD:DRSS
- DRSS 07// /95 07/g
/95 ADMcQueen:nh f TWDexter D Cham ain 07
/95 0
C A RAScara o
07/
/95
I 1
I
Washington Public Power Supply System DISTRIBUTION w re ort:
DMB (9%45+
WNP-2 Resident Inspector ADMcQueen, WCFO (DRSS/RIB)
J. Clifford, NRR Project Manager (MS 13 E18)
RIB Action Item File (Hodges)
RIV File bcc w/o report:
L. J. Callan MIS System Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS:
TWFN 9E10)
BE Henderson (PAO, WCFO)
Branch Chief (DRP/E, WCFO)
C. A. Hackney, SLO T. Essig, NRR/DOTS (MS 9 H15)
E.
F.
- Fox, NRR/DOTS/TERB (MS 9 H15)
E.
F. Bates, IRC C. A. Hackney, SLO DOCUMENT NAME:
0: iRIBiADMiE-95-40.ADM RIV:RIB AC:RIB DD:DRSS
- DRSS ADMcQueen:nh fP TWDexter D Cham ain RAScara o
07/(
/95 07/t
/95 07
/95 0
C 07/
/95