ML17291A877
| ML17291A877 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/29/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A878 | List: |
| References | |
| NUDOCS 9507050027 | |
| Download: ML17291A877 (5) | |
See also: IR 05000397/1995018
Text
'
~pR REGS(
~C
q
Wp
+
0
rn l
)0
i)-g
4~*~4
UNITED STATES
LEAR REGULATORY COMMISSIO
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
tIIR 29 $95
Washington Public
Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-18
This refers to the inspection
conducted
by Hr.
P. gualls of this office on
Hay 15-19,
1995.
The inspection
included
a review of activities authorized
for your Washington
Nuclear Project-2 facility.
At the conclusion of the
inspection,
the findings were discussed
with you and those
members of your
staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because it was identified by
the
NRC and involved the use of the fire protection water system in violation
of fire protection procedures
when the system
was in a degraded
condition.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions
taken
and any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter; its enclosures,
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
include any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
However, if you find it
necessary
to include such information, you should clearly indicate the
specific information that you desire not to be placed in the
PDR,
and provide
the legal basis to support your request for withholding the information from
the public.
9507050027
'750b29
ADQCK 05000397
8
g6
Washington Public
Power Supply
Supply
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Hanagement
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
Enclosures:
1.
2.
NRC Inspection
Report
50-397/95-18
homas
P.
Gwynn,
Di
c or
Division of Rea
Sa ety
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Hanager
P.O.
Box 968,
MD 927H
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Hanager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply
System
Washington Public Power Supply System
ATTN:
P.
R.
Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Nail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston 5 Strawn
ATTN:
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public
Power Supply
System
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
tbcc to
DHB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
AI No.95-069
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUHENT NAHE:
R: i WNPiWN518RP. PHg
To receive copy of document, rndicete in box: "C" ~ Copy without enclosures
E" ~ Copy with enclosures "N" ~ No copy
Concurred vi a e-mail*
PSB:WCFO
Pgualls*
06/21/95
D:DRS
WPAn *
06/21/95
D:DRS
TPGw nn
06/g/95
OFFICIAL RECORD
COPY
D:DRP
ABBeach
06@V/95
D:DRS
TPGw nn
06/
/95
Ov(JUGj
Washington Public Power Supply
System
E-Hail report to D. Sullivan (DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to DHB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
AI No.95-069
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:i WNPiWN518RP. PHg
To receive copy cf document, indicate in bcx: "C" ~ Copy without enciosures
"E" ~ Copy with enclosures "N" ~ No copy
Concurred vi a e-mail*
PSB:WCFO
P ualls*
06/21/95
D: DRS
D:DRS
WPAn *
06/21/95
TPGw nn
06'/95
OFFICIAL RECORD
COPY
D:DRP
ABBeach
06+i/95
D:DRS
TPGw nn
06/
/95