Forwards Insp Repts 50-397/95-14 on 950424-0523.Violations Noted But Not Cited
ML17291A867
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/19/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A868 List:
References
NUDOCS 9506230077
Download: ML17291A867 (7)


See also: IR 05000397/1995014

Text

RZORXTY.i

CCELERATED RIDS PROCESSING)

"~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:9506230077

DOC.DATE: 95/06/19

NOTARIZED: NO

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

DOCKET

05000397'P

I

SUBJECT:

Forwards insp repts 50-397/95-14

on 950424-0523.Violations

noted but not cited.

0

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTRJ

ENCL J

SIZE: 5+ol47

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

EXTERNAL: LITCO BRYCE,U H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/DEIB

~AEO .

~mX.~E~

NRR/DORS/OEAB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK,

ROOM OWFN

SDS

(415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

OTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

gI,R ~ECC

f

Wp0

I'-

+y*y4

UNITED STATES

CLEAR REGULATORY COMMISSI

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

)

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-14

This refers to the inspection

conducted

by Messrs,

L.

E. Ellershaw,

C. J.

Paulk,

and J.

E. Whittemore of this office on April 24 through

May 23,

1995.

The inspection

included

a review of activities authorized for

your Washington

Nuclear Project-2 facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

The inspectors

identified two violations of Criterion

V of Appendix

B to

10

CFR Part 50:

a failure to adequately

implement

a procedure for certifying the

visual acuity of nondestructive

test personnel,

and

a failure to have

an

ultrasonic testing procedure

adequately

address criteria for determining that

important activities

had

been

accomplished.

These violations are not being

cited because

the criteria in paragraph VII.B.(l) of Appendix

C to

10 CFR Part 2 of the

NRC's "Rules of Practice,"

were satisfied.

These

were isolated

occurrences

and your staff took prompt

and thorough corrective actions.

Additionally, your personnel

identified the securing of the residual

heat

removal

system while in the shutdown cooling mode for greater

than

3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> in

an 8-hour period,

and this was

a violation of the Technical Specifications.

This violation is not being cited because

the criteria in paragraph VII.B.(2)

of Appendix

C to

10 CFR Part 2 were satisfied.

The amount of decay heat

present

at the time of the event

was minimal

and the reactor coolant

temperature

did not rise

a significant amount.

For the specific areas

examined

and the associated

inspection findings, the

inspectors

concluded there

was

an

improvement in licensee

performance of

refueling outage activities

as

compared to that of the previous outage.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosure will be placed in the

NRC Public Document

Room.

9506230077

950619'DR

ADCICK 05000397

GI

PDR

Washington

Public Power Supply

System

JUZ

I 9 l995

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

Enclosure:

NRC Inspection

Report

50-397/95-14

w/attachments

homas

P.

Gwynn, Dir c or

Division of Rea

Sa

e

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

G,

E.

C.

Doupe,

Esq.

3000 George

Washington

Way

P.O.

Box 968,

HD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P

~ 0.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply

System

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

H.

H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power

Supply

System

E-Hail report to D. Sullivan (DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

J.

Hauck

(DRCH/HICB,

MS:

OWFN SH3)

Resident

Inspector

HIS System

RIV File

Br anch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

D.

Powers

DOCUMENT NAME:

R:i WNP2XWN513RP.CJP

To receive copy of document, 1ndicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

RIV:RI: MB

RI: HB

RI: HB

C:MB

D:DRS

JEWhittemore

CJPaulk

LEElershaw

DAPowers

TPGwynn

06/ F/95

D:DRP

D:DRS

06/8 /95

Concurred

by E-

Hail 6/3/95

06/0$ /95

06/! /95

TPGwynn

ABBeach

06/>fS/9

~

06/1 /95

OFFICIAL RECORD

COPY

t itsigs

Washington Public Power Supply

System

-4-

E-Mail report to D. Sullivan (DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB

~

MS:

TWFN 9E10)

J.

Mauck

(ORCH/HICB,

MS:

OWFN SH3)

~

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

D.

Powers

DOCUMENT NAME:

R:X WNP2XWN513RP.CJP

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" ~ Copy with enclosures "N" = No copy

RIV:RI: MB

RI:MB

RI:MB

C:MB

D:DRS

JEWhittemore

CJPaulk

LEElershaw

DAPowers

.

TPGwynn