RZORXTY.i
CCELERATED RIDS PROCESSING)
"~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9506230077
DOC.DATE: 95/06/19
NOTARIZED: NO
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
AUTH.NAME
AUTHOR AFFILIATION
GWYNN,T.P.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
DOCKET
05000397'P
I
SUBJECT:
Forwards insp repts 50-397/95-14
on 950424-0523.Violations
noted but not cited.
0
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTRJ
ENCL J
SIZE: 5+ol47
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN4
FILE
01
EXTERNAL: LITCO BRYCE,U H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
~AEO .
~mX.~E~
NRR/DORS/OEAB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
0
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
DESK,
ROOM OWFN
(415-2083)
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
gI,R ~ECC
f
Wp0
I'-
+y*y4
UNITED STATES
CLEAR REGULATORY COMMISSI
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
)
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-14
This refers to the inspection
conducted
by Messrs,
L.
E. Ellershaw,
C. J.
Paulk,
and J.
E. Whittemore of this office on April 24 through
May 23,
1995.
The inspection
included
a review of activities authorized for
your Washington
Nuclear Project-2 facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
The inspectors
identified two violations of Criterion
V of Appendix
B to
10
CFR Part 50:
a failure to adequately
implement
a procedure for certifying the
visual acuity of nondestructive
test personnel,
and
a failure to have
an
ultrasonic testing procedure
adequately
address criteria for determining that
important activities
had
been
accomplished.
These violations are not being
cited because
the criteria in paragraph VII.B.(l) of Appendix
C to
10 CFR Part 2 of the
NRC's "Rules of Practice,"
were satisfied.
These
were isolated
occurrences
and your staff took prompt
and thorough corrective actions.
Additionally, your personnel
identified the securing of the residual
heat
removal
system while in the shutdown cooling mode for greater
than
3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> in
an 8-hour period,
and this was
a violation of the Technical Specifications.
This violation is not being cited because
the criteria in paragraph VII.B.(2)
of Appendix
C to
10 CFR Part 2 were satisfied.
The amount of decay heat
present
at the time of the event
was minimal
and the reactor coolant
temperature
did not rise
a significant amount.
For the specific areas
examined
and the associated
inspection findings, the
inspectors
concluded there
was
an
improvement in licensee
performance of
refueling outage activities
as
compared to that of the previous outage.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosure will be placed in the
NRC Public Document
Room.
9506230077
950619'DR
ADCICK 05000397
Public Power Supply
System
JUZ
I 9 l995
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
Enclosure:
NRC Inspection
Report
50-397/95-14
w/attachments
homas
P.
Gwynn, Dir c or
Division of Rea
Sa
e
cc w/enclosure:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
G,
E.
C.
Doupe,
Esq.
3000 George
Way
P.O.
Box 968,
HD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P
~ 0.
Box 43172
Olympia, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply
System
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
& Strawn
ATTN:
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power
Supply
System
E-Hail report to D. Sullivan (DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
J.
Hauck
(DRCH/HICB,
MS:
OWFN SH3)
Resident
Inspector
HIS System
RIV File
Br anch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
D.
Powers
DOCUMENT NAME:
R:i WNP2XWN513RP.CJP
To receive copy of document, 1ndicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV:RI: MB
RI: HB
RI: HB
C:MB
D:DRS
JEWhittemore
CJPaulk
LEElershaw
DAPowers
TPGwynn
06/ F/95
D:DRP
D:DRS
06/8 /95
Concurred
by E-
Hail 6/3/95
06/0$ /95
06/! /95
TPGwynn
ABBeach
06/>fS/9
~
06/1 /95
OFFICIAL RECORD
COPY
t itsigs
Washington Public Power Supply
System
-4-
E-Mail report to D. Sullivan (DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E.
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB
~
MS:
TWFN 9E10)
J.
Mauck
(ORCH/HICB,
MS:
OWFN SH3)
~
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
D.
Powers
DOCUMENT NAME:
R:X WNP2XWN513RP.CJP
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" ~ Copy with enclosures "N" = No copy
RIV:RI: MB
RI:MB
RI:MB
C:MB
D:DRS
JEWhittemore
CJPaulk
LEElershaw
DAPowers
.
TPGwynn
06/ I/95
D:DRP
D:DRS
06/8 /95
Concurred
by E-
Hai 1 6/3/95
06/0</95
06/t /95
ABBeach
TPGwynn
06/lg'/9
c.
06/l /95
OFFICIAL RECORD
COPY