Informs of Upcoming Insp 50-397/95-98 to Assess Safety Performance Experience of Terry Turbines in AFW or Rcicss. Also Forwards Insp Schedule & Performance Info to Be Made Available for Review
ML17291A933
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/28/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9508070014
Download: ML17291A933 (11)


See also: IR 05000397/1995098

Text

~gg Racy 'fp0

4

)

0

0

v ~

/p )i~**4

UNITED STATES

EAR REGULATORY COMMISSIO

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.8064

Jut

P 8 l995

Washington Public Power Supply System

ATM:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George Washington

Way

P.O.

Box.968.

HD 1023

Richland.

Washington

99352

SUBJECT:

REGION IV INITIATIVE INSPECTION -

NRC INSPECTION

REPORT 50-397/95-98

The

purpose

of this letter is to

announce

a

Region

IV inspection

at your

facility.

The inspection will consist of a site visit and in-office review of

- information.

This inspection effort is intended to be completed at each site by

one inspector

in about

2 days.

The schedule for the inspection is contained in

Attachment

1 to thii letter.

Recently,

several

facilities

have

experienced

problems

with Terry turbines.

including overspeed

trips.

The purpose of this inspection

is to review and

assess

the safety performance experience of Terry turbines in auxiliary feedwater

or reactor

core isolation cooling systems,

as applicable.

While on site. this

inspection will emphasize

the gathering of site performance

data to support'n

in-office assessment.

The

inspection will be

conducted

using

portions

of

Inspection

Procedure

93801

"Safety

System

Functional

Inspection."

Some

facilities

may

not

receive

a

site visit

based

on

recent

inspection

and

understanding

of system configuration.

To assist in achieving the objectives of the inspection,

we request that you make

available for review the performance information contained in Attachment 2.

Ny

staff will be contacting your staff by telephone to discuss the information and

the site visit schedule.

Should

you

have

any additional

questions

concerning this

inspection

or the

requested

information, please

contact Hr.

E. Collins at (817) 860-8291.

Sincerely.

.Docket:

50-397

License:

NPF-21

Attachments:

As stated

Thomas

P.

Gwynn,

Di ector

Division of Rea t

Saf ty

4

CC:

95080700i4

950728

PDR

ADCICK 05000397

6

PDR

Washington Public Power

Supply System

-2-

Washington Public Power Supply System

ATTN:

J.

H. Swai les,

WNP-2 Plant Manager

P.O.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public

Power

Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P;0.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemis. Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners.

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

8 Strawn

ATTN:

- M. H.

Phi lips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power

Supply System

E-Hail report to D. Sullivan (DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IEOl)

bcc distrib.

by RIV:

. L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME

To receive copy of document, indicate ln box: "C"

Copy without enclosures

"E"

Copy with enclosures "N"'o copy

RIV:AC:EB

EECollins/lb

07/28"/95

D:DRS

TPGw nn

07/

/95

D:DRP

JEDye

07/

/95

D:DRS

TPGwynn

07

95

Washington Public Power

Supply System

E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System

(IPAS)

.bcc'to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TMFN 9E10)

Resident

Inspector

HIS System

RIY File

Branch Chief (DRP/TSS)

B. Henderson

(PAO.

WCFO)

DOCUHENT NAHE:

To receive copy of document, indicate in box: "G" ~ Copy without enclosures

"E" ~ Copy with enciosures "N" ~ No copy

RIV:AC:EB

EECollins/lb

07/28"/95

D:DRS

TPGw nn

07/

/95

D:DRP

JEDye

07/

/95

AL

D:DRS

TPGwynn

07

95

ATTACHHENT 1

SITE VISIT SCHEDULE

Ins ector

1

August 3-4,

1995

August 7-9.

1995

August 10-11.

1995

August 15-17,

1995

Palo Verde Nuclear Generating Station

San Onofre Nuclear Generating Station

Diablo Canyon

Wolf Creek

Ins ector

2

August 4,

1995

August 8.

1995

August 10-11,

1995

August 14,

1995

August 16-17,

1995

Comanche

Peak

South Texas Project

Waterford

Arkansas

Nuclear

One

Cooper Nuclear Station

River Bend Station and Washington Nuclear Project 2 will be reviewed by telephone

with the option of performing

a site visit.

ATTACHMENT 2

AREAS OF INTEREST OF TERRY TURBINE PERFORMANCE

FOR INSPECTION

.Cate<aors

,Design

and

Configuration

Lubrication

Governor

Procedures

Area of Interest

Designer of the system

and major design objectives

Automatic initiation signals

Initiation sequence

Design of the overspeed trip ball-tappet

Configuration of the system

Major modifications of the system

Steam admission valves

Location of the steam admission valves

Leak tightness of the steam admission valves

Condensate

removal capabilities

Supplier of replacement

parts

Specifications for replacement

parts

Recently'purchased

parts

Storage of spare governors

and actuators

Erivironment in area of turbines

Type of'ubricating oil system

Type of oils

Specifications for oils

Operating limits based

on oils

Periodicity for changing oils

Type of governor installed

Type of governor

control oil system

Periodicity of refurbishment of governor

Type of remote operation, if applicable

Governor valve stem material

Installation date of governor valve stem

Speed stability verification

DC electrical

system

Overspeed trip mechanisms

Speed

ramp provisions

Terry turbine manual

approved for use

Woodward governor

manual

approved for use

EPRI NP-6909 availability

Verification of governor valve coordination

Replacement

interval for governor diaphragm

Disassembly/reassembly

of turbine,

governor valve.

etc.

Trip ball-tappet inspections

System operating

procedures

Test procedures

Test frequency

~

~

t

0

4

~

~

V

~

I

-2-

Operating

Experience

Gener ic

Communications

Documents

Required:

Start

demands

Failures

Causes

of failures

Generic communication

sources

Responses

to generic communications

Terry turbine users

group participation

Copy of system operating

procedure

Copy of system operability test procedure

Copy of governor valve assembly instructions

Copy of applicable

process

and instrumentation

diagrams

Copies of the reviews of:

Information Notices 94-66.

93-51.

86-14 and supplements;

NUREG 1275,

Volume

X

1a

~