ML17291A853

From kanterella
Jump to navigation Jump to search
Forwards Augmented Insp 50-397/95-13 on 950424-26 & 950503 & 25.No Violations Noted
ML17291A853
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/12/1995
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A854 List:
References
NUDOCS 9506200207
Download: ML17291A853 (9)


See also: IR 05000397/1995013

Text

r

RIDRIT'Y Z

REGULAT

g@Z~gEEI~lBI'STION +ITEM (RIDS)

ACCESSION VBR:9506200207

DOC.DATE: 95/06/12

NOTARIZED:

NO

DOCKET ¹

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe '5000397

AUTH.NAME

AUTHOR AFFILIATION

LLAN,L.J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

I

SUBJECT:

Forwards

augmented

insp 50-397/95-13

on 950424-26

a 950503

6

25.No violations noted.

DISTRIBUTION CODE:

ZEIOD

COPIES

RECEIVED:LTR I ENCL /

SIZE:

TITLE: 50 Dkt Augmented Inspection

Team (AIT) Reports/Correspondence

NOTES:

P

0

'ECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/DO

COMMISSIONERS

R

RR

D

NRR/DOPS

NRR/DOTS/TERB

NRR/DRPW

NUDOCS-ABSTRACT

OEDO

RES/DSR/HFB

EXTERNAL: INPO RECORD

CTR

NRC PDR

COPIES

'TTR

ENCL

1

1

1

1

1

1

5

5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/DEIIB

AEOD/SPD/RAB

DEDRO

NRR/ADAR

NRR/DISP/PIPB

NRR/DOPS/OECB

NRR/DRCH/HHFB

NRR/DSSA/DIR

OE/DIR

OGC/HDS3

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Y

'D

0

'C

YOTE TO ALL"RIDS" RECIPIEiiS:.

PLEASE HELP US TO REDUCE 'WASTE! COi4'TACTTHE DOCUMENT'TCOYTROL

DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMIYATEYOUR i iAME FROhi

DISTRIBL'TIOY.LISTS FOR DOCUMEYTS YOU DOi "I".PEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

32

ENCL

32

cup

~o

~~i

00

.; ~

Cy

  • <<>>

4"'*

~

~p,R RE

~

~ Q+

~

5% j

Iill

UNITED STATES

LEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

JUN

t 2 I995

Mr. J.

V. Parrish

(Mail Drop 1023)

Vice President

Nuclear Operations

Washington Public Power Supply System

P.O.

Box 968

Richland,

Washington

99352-0968

Dear Mr. Parrish:

SUBJECT:

NRC AUGMENTED INSPECTION

OF WASHINGTON PUBLIC

POWER

SUPPLY

SYSTEM

NUCLEAR PROJECT

2

(WNP-2)

This refers to the Augmented

Inspection

Team (AIT) inspection

conducted

by

Messrs.

W. Johnson,

J. Clifford, S.

McCrory,

G. West,

and J.

Whittemore of the

NRC staff during the period of April 24-26, with additional inoffice

inspection

between

May 3 and 25,

1995.

The AIT examined

the facts surrounding

the operation of the reactor water cleanup

system

on April 9,

1995,

and other

activities authorized

by

NRC Operating

License

NPF-21.

At the conclusion of

the inspection,

the inspectors

met with you and other members of your staff on

April 26,

1995, to discuss

the inspection findings.

Areas

examined during the AIT are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of selective

examinations of

'rocedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

The findings and conclusions of the AIT are documented

on pages

30-32 in the

enclosed

report.

Overall, the AIT concluded that the event itself was not

safety significant

and did not pose

an additional risk to the public health

and safety.

Nevertheless,

the event

was of significance with respect

to human

performance

at WNP-2.

The findings and conclusions

were reviewed

by

NRC and

the results of that review were provided to you by letter dated

June

2,

1995,

transmitting

NRC Inspection

Report 50-397/95-07.

"

In accordance

with 10 CFR 2.790,

a copy of this letter

and the enclosure will

be placed in the

NRC Public Document

Room.

4'hould

you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

'L

. Callan

R

onal Administrator

9506200207 '950bi2

PDR

ADCICK 050003'P7

6

PDR

.

0

'

Docket:

50-397

License:

NPF-21

Enclosure:

NRC Inspection

Report 50-397/95-13

w/appendices

cc w/enclosure:

Washington

Public Power Supply System

ATTN:.

J.

H. Swailes,

WNP-2 Plant Manager

P:0.

Box 968,

MD 927M

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

Chief Counsel

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S'. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

'.O.

Box 190

Prosser,

Washington

99350-0190

Winston

E Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

0'

Mr. J.

V. Parrish

JUN

I 2 l995

'0

bcc to

DMB (IE10)

bcc distrib.

by RIV:

J. Hilhoan,

OEDO

DRSS-F IPB

Branch Chief (DRP/E,, WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS TWFN 9E10)

Chairman Selin

Commissioner

Rogers

Commissioner

de Planque

Commissioner

Jackson

A. Chaffee,

NRR/DORS/EAB

(HS 11Al)

T. Kress,

ACRS

(MS 2E26)

A. Beach,

RIV

G. West,

NRR

(MS 10D24)

R.

Zimmerman,

NRR.(HS

12G18)

E.

Adensam,

NRR

(HS 13E4)

W. Bateman,

NRR

(HS 13E16)

J. Larkins, Executive Director,

ACRS

(HS

. J. Clifford, Project Manager,.

NRR

(MS 13E

L. J. Callan,

RA

Senior Resident

Inspector

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

J. Taylor,

EDO

W. T. Russell,

NRR

(HS 12G18)

INPO

DCS

E. Jordan,

AEOD

(MS 4018)

D. Corporandy,

WCFO

S. HcCrory,

RIV

J. Whittemore,

RIV

A. Thadani,

NRR

(MS 12G18)

J.

Hannon,

NRR

(HS 13E4)

P-315)

18)

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

DOCUMENT NAME:

R: i wn2ttWN5

To receive copy of document, indicate in b r .wdj

xt " "

Copy without enclos

s "E"

Copy with enclosures "N" ~ No copy

RIV:C:DRP/A

E

D:DRS

E

0:DRS

E

N

R

E

WDJohnson;df

ABBeach

TPGwynn

JMM

tgomery

LJCa

an

6/8 /95

p]1 geo~

r e~6mg

have

p~yg 748eL

c>>ace i~nc 0

6/

/95

6/

/95

6/

/9

6/

/95

0'

Nr. J.

V. Parrish

JUN

I 2 t995

E-Hail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to .DMB ( IE10)

bcc distrib.

by RIV:

J.

Milhoan,

OEDO

Resident

Inspector

DRSS-FIPB

MIS System

Branch Chief (DRP/E,

WCFO)

RIV File

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

HS

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

Chairman Selin

J. Taylor,

EDO

Commissioner

Rogers

W. T. Russell,

NRR

(HS 12G18)

Commissioner

de Planque

INPO

Commissioner

Jackson

DCS

A. Chaffee,

NRR/DORS/EAB

(MS llAl)

E. Jordan,

AEOD

(HS 4D18)

T. Kress,

ACRS

(HS 2E26)

D. Corporandy,

WCFO

A. Beach,

RIV

S. McCrory,

RIV

G. West,

NRR

(HS '10D24)

J. Whittemore,

RIV.

R.

Zimmerman,

NRR

(MS 12G18)

A. Thadani,

'NRR

(HS 12G18)

E.

Adensam,

NRR

(HS 13E4)

J.

Hannon,

NRR

(HS 13E4)

W. Bateman,

NRR

(HS 13E16)

J. Larkins, Executive Director,

ACRS

(HS P-315)

J. Clifford, Project

Manager,

NRR

(HS 13E18)

L. J. Callan,

RA

Senior Resident

Inspector

DOCUMENT NAME:

R:~ wn2)WN5 r .wdj

To receive copy cf document, indicate in b x: " " ~ Copy without enclos

s "E" ~ Copy w'ith enclosures "N" ~ No copy

RIV:C:DRP/A

E

WDJohnson;df

6/8 /95

Bll Yea~

me~4erg

haue

pwOa

~ace y'~~c <

D:DRS

E

ABBeach

6/

/95

D:DRS

E

TPGwynn

6/

95

JMM

tgomery

6/

/9

R

E

LJCa

an

6/

/95

0'