ML17291A853
| ML17291A853 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/12/1995 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A854 | List: |
| References | |
| NUDOCS 9506200207 | |
| Download: ML17291A853 (9) | |
See also: IR 05000397/1995013
Text
r
RIDRIT'Y Z
REGULAT
g@Z~gEEI~lBI'STION +ITEM (RIDS)
ACCESSION VBR:9506200207
DOC.DATE: 95/06/12
NOTARIZED:
NO
DOCKET ¹
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe '5000397
AUTH.NAME
AUTHOR AFFILIATION
LLAN,L.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
I
SUBJECT:
Forwards
augmented
insp 50-397/95-13
on 950424-26
a 950503
6
25.No violations noted.
DISTRIBUTION CODE:
ZEIOD
COPIES
RECEIVED:LTR I ENCL /
SIZE:
TITLE: 50 Dkt Augmented Inspection
Team (AIT) Reports/Correspondence
NOTES:
P
0
'ECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/DO
COMMISSIONERS
R
D
NRR/DOPS
NRR/DOTS/TERB
NRR/DRPW
NUDOCS-ABSTRACT
OEDO
RES/DSR/HFB
EXTERNAL: INPO RECORD
CTR
NRC PDR
COPIES
'TTR
ENCL
1
1
1
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIIB
AEOD/SPD/RAB
DEDRO
NRR/ADAR
NRR/DISP/PIPB
NRR/DOPS/OECB
NRR/DRCH/HHFB
NRR/DSSA/DIR
OE/DIR
OGC/HDS3
RGN4
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Y
'D
0
'C
YOTE TO ALL"RIDS" RECIPIEiiS:.
PLEASE HELP US TO REDUCE 'WASTE! COi4'TACTTHE DOCUMENT'TCOYTROL
DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMIYATEYOUR i iAME FROhi
DISTRIBL'TIOY.LISTS FOR DOCUMEYTS YOU DOi "I".PEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
32
ENCL
32
cup
~o
~~i
00
.; ~
Cy
- <<>>
4"'*
~
~p,R RE
~
~ Q+
~
5% j
Iill
UNITED STATES
LEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
JUN
t 2 I995
Mr. J.
V. Parrish
(Mail Drop 1023)
Vice President
Nuclear Operations
Washington Public Power Supply System
P.O.
Box 968
Richland,
99352-0968
Dear Mr. Parrish:
SUBJECT:
NRC AUGMENTED INSPECTION
OF WASHINGTON PUBLIC
POWER
SUPPLY
SYSTEM
NUCLEAR PROJECT
2
(WNP-2)
This refers to the Augmented
Inspection
Team (AIT) inspection
conducted
by
Messrs.
W. Johnson,
J. Clifford, S.
McCrory,
G. West,
and J.
Whittemore of the
NRC staff during the period of April 24-26, with additional inoffice
inspection
between
May 3 and 25,
1995.
The AIT examined
the facts surrounding
the operation of the reactor water cleanup
system
on April 9,
1995,
and other
activities authorized
by
NRC Operating
License
At the conclusion of
the inspection,
the inspectors
met with you and other members of your staff on
April 26,
1995, to discuss
the inspection findings.
Areas
examined during the AIT are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of selective
examinations of
'rocedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
The findings and conclusions of the AIT are documented
on pages
30-32 in the
enclosed
report.
Overall, the AIT concluded that the event itself was not
safety significant
and did not pose
an additional risk to the public health
and safety.
Nevertheless,
the event
was of significance with respect
to human
performance
at WNP-2.
The findings and conclusions
were reviewed
by
NRC and
the results of that review were provided to you by letter dated
June
2,
1995,
transmitting
NRC Inspection
Report 50-397/95-07.
"
In accordance
with 10 CFR 2.790,
a copy of this letter
and the enclosure will
be placed in the
NRC Public Document
Room.
4'hould
you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
'L
. Callan
R
onal Administrator
9506200207 '950bi2
ADCICK 050003'P7
6
.
0
'
Docket:
50-397
License:
Enclosure:
NRC Inspection
Report 50-397/95-13
w/appendices
cc w/enclosure:
Public Power Supply System
ATTN:.
J.
H. Swailes,
WNP-2 Plant Manager
P:0.
Box 968,
MD 927M
Richland,
99352-0968
Washington Public
Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S'. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
Washington Public
Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public
Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
'.O.
Box 190
Prosser,
99350-0190
Winston
E Strawn
ATTN:
M. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
0'
Mr. J.
V. Parrish
JUN
I 2 l995
'0
bcc to
DMB (IE10)
bcc distrib.
by RIV:
J. Hilhoan,
OEDO
DRSS-F IPB
Branch Chief (DRP/E,, WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS TWFN 9E10)
Chairman Selin
Commissioner
Rogers
Commissioner
de Planque
Commissioner
Jackson
A. Chaffee,
NRR/DORS/EAB
(HS 11Al)
T. Kress,
(MS 2E26)
A. Beach,
RIV
G. West,
(MS 10D24)
R.
Zimmerman,
NRR.(HS
12G18)
E.
Adensam,
(HS 13E4)
W. Bateman,
(HS 13E16)
J. Larkins, Executive Director,
(HS
. J. Clifford, Project Manager,.
(MS 13E
L. J. Callan,
Senior Resident
Inspector
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
J. Taylor,
W. T. Russell,
(HS 12G18)
E. Jordan,
(MS 4018)
D. Corporandy,
WCFO
S. HcCrory,
RIV
J. Whittemore,
RIV
A. Thadani,
(MS 12G18)
J.
Hannon,
(HS 13E4)
P-315)
18)
E-Mail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
DOCUMENT NAME:
R: i wn2ttWN5
To receive copy of document, indicate in b r .wdj
xt " "
Copy without enclos
s "E"
Copy with enclosures "N" ~ No copy
RIV:C:DRP/A
E
D:DRS
E
0:DRS
E
N
R
E
WDJohnson;df
ABBeach
TPGwynn
JMM
tgomery
LJCa
an
6/8 /95
p]1 geo~
r e~6mg
have
p~yg 748eL
c>>ace i~nc 0
6/
/95
6/
/95
6/
/9
6/
/95
0'
Nr. J.
V. Parrish
JUN
I 2 t995
E-Hail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to .DMB ( IE10)
bcc distrib.
by RIV:
J.
Milhoan,
OEDO
Resident
Inspector
DRSS-FIPB
MIS System
Branch Chief (DRP/E,
WCFO)
RIV File
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
Chairman Selin
J. Taylor,
Commissioner
Rogers
W. T. Russell,
(HS 12G18)
Commissioner
de Planque
Commissioner
Jackson
A. Chaffee,
NRR/DORS/EAB
(MS llAl)
E. Jordan,
(HS 4D18)
T. Kress,
(HS 2E26)
D. Corporandy,
WCFO
A. Beach,
RIV
S. McCrory,
RIV
G. West,
(HS '10D24)
J. Whittemore,
RIV.
R.
Zimmerman,
(MS 12G18)
A. Thadani,
'NRR
(HS 12G18)
E.
Adensam,
(HS 13E4)
J.
Hannon,
(HS 13E4)
W. Bateman,
(HS 13E16)
J. Larkins, Executive Director,
(HS P-315)
J. Clifford, Project
Manager,
(HS 13E18)
L. J. Callan,
Senior Resident
Inspector
DOCUMENT NAME:
R:~ wn2)WN5 r .wdj
To receive copy cf document, indicate in b x: " " ~ Copy without enclos
s "E" ~ Copy w'ith enclosures "N" ~ No copy
RIV:C:DRP/A
E
WDJohnson;df
6/8 /95
Bll Yea~
me~4erg
haue
pwOa
~ace y'~~c <
D:DRS
E
ABBeach
6/
/95
D:DRS
E
TPGwynn
6/
95
JMM
tgomery
6/
/9
R
E
LJCa
an
6/
/95
0'