Forwards SE Which Accepts Requests for Relief for Util Which Had Been Provided as Part of Inservice Insp Program Plan for Second ten-year Interval Submitted in
ML17291A834
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/01/1995
From: Bateman W
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A835 List:
References
TAC-M90848, NUDOCS 9506140334
Download: ML17291A834 (5)


Text

'pR P Pp O~

A

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 June 1,

1995 Mr. J. V. Parrish (Mail Drop 1023)

Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.

Box 968 Richland, Washington 99352-0968

SUBJECT:

INTERIM APPROVAL FOR INSERVICE INSPECTION RELIEF REQUESTS FOR WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO.

2 (WNP-2)(TAC NO. M90848)

Dear Mr. Parrish:

We have evaluated several of the relief requests you provided as part of your inservice inspection (ISI) program plan for the second ten-year interval-submitted in your letter dated December 27, 1994.

The relief requests that we evaluated were identified by your staff as those necessary to support plant'estart from the R-10 outage.

Since we have not completed a comprehensive review of the program plan or the associated relief requests',

we are only approving these reliefs on an interim basis.

Based on the information submitted, your request for relief 2ISI-05 is approved on an interim basis pursuant to 10 CFR 50.55a(g)(6)(i),

based on the impracticality of the applicable code requirement when applied to WNP-2, with due consideration of the burden upon the licensee, and will not endanger life or property or the common defense and security and is otherwise in the public interest.

Your requests for alternatives in relief requests 2ISI-06, 2ISI-07, and 2ISI-12 are approved on an interim basis pursuant to 10 CFR 50.55a(a)(3)(ii) because of th'e hardship to the utility without a compensating increase in the level of quality and safety.

Your request for alternatives in relief request 2ISI-14 is approved on an interim basis pursuant to 10 CFR 50.55a(a)(3)(i) as providing an acceptable level of quality and safety.

The enclosed safety evaluation provides the NRC staff basis for granting the reliefs on an interim basis.

9506i40334 95060i PDR

@DOCK OSO0O397 P

PDR 1

Mr. J.

V. Parrish June 1,

1995 Once the NRC staff completes its review of your ISI program plan, we will provide our determination regarding the long-term acceptability of the relief requests contained in your program plan.

Sincerely, Original Signed By William H. Bate'man, Director,...

, Project Directorate IV-2 Division of Reactor Projects I,II/IV'ffice of Nuclear Reactor'egulat<<ion DISTRIBUTION'Docket File,'UBLIC WRus sel 1 /FMirag 1 i a RZimmerman RSpessard JLieberman EAdensam JHannon WBateman EPeyton JClifford ACRS (4),

TWFN PDIV-2 Reading

OGC, 015B18
KPerkins, WCFO
BBeach, RIV DChamberlain, RIV GBagchi EJordan GHill (2)

JMitchell, EDO OC/LFDCB Docket No. 50-397

Enclosure:

Safety Evaluation cc w/enclosure:

See next page I

~

ih

<<(

/

l:

)"

lg l

g/

lt V

I DOCUMENT NAME:

WNP90848. INT

  • See revious concurrence OFC PDIV-2 LA PDIV PM OGC PDIV-2 DIR NAME EPe Pori DATE 5

IL 95 JClifford:ye 5 ~95 CMarco*

5 30 95 OFFICIAL RECORD COPY WBatema 95

(\\i'(

((

A Y(

F 4(

'. ~.

1 I

I I

1

.F

,l T IF I

y'>>-

I(

I f(

(

,f 1

('

j "I I,

Mr. J.

V. Parrish 3une 1, 1995 CC:

Mr. J.

H. Swailes WNP-2 Plant General Manager Washington Public Power Supply System P. 0.

Box 968 Richland, Washington 99352-0968.

Corporate Counsel (Hail Drop 396)

Washington Public Power Supply System 3000 George Washington Way

Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.

Box 43172 Olympia, Washington 98504-3172 Mr. D. A. Swank (Hail Drop PE20)

WNP-2 Licensing Manager Washington Public Power Supply System P.O.

Box 968 Richland, Washington 99352-0968 Mr. Paul R. Bemis (Hail Drop PE20)

Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower

& Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

Prosser, Washington 99350-0190 Hr. R.

C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69 Richland, Washington 99352-0968 M. H. Philips, Jr.,

Esq.

Winston 5 Strawn 1400 L Street, N.W.

Washington, DC 20005-3502