Text
PRj:ORIT'Y Z
REGULRT'l%8kkHIi59
"DRHktRTIOTEM
(RIDE)
~~ ACCESSION NBR:9507260017
DOC.DATE: 95/07/20
NOTARIZED: NO
DOCKET
FACI':50-397
WPPSS Nuclear Project, Unit 2, Washington Public Powe
05000397
~
~
AUTH.NAME
AUTHOR AFFILIATION
'WYNN,T.P.
Region
4 *(Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH, J.V.
Washington Public
Powe r Supply System
SUBJECT:
Forwards insp rept 50-397/95-19
on 950605-20
& 'notice of
violation.NRC concerned
w/generally low level of operations
performance
a lack of established
improving trend.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN4
FILE
01
ERNAL'ITCO BRYCE E J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
FILE
ENTER
RM DORS
OEAB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIEi4'TS:
PLEASE HELP US TO REDUCE iVASTE! COib'TACTTHE DOCL'MEYTCOi'TROL
DESK, ROOM Pl-37 (EXT. 504.20S3
) TO ELIMIYATE YOUR lNAME FROi!
DIS I'RIBI.'TIOY.LISTS FOR DOC!.:NIEVTS YOU DOi "I'EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
P,
~v
"*
4ECI
~o
.) %~
)
0O
~,
UNITEDSTATES
CLEAR REGULATORY COMMISS(
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
Washington Public
Power
Supply System
ATTN:
J.
V. Parrish
~ Vice President
Nuclear Operations
3000 George Washington
Way
P.O.
Box 968,
HD 1023
Richland,
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/95-19
This refers to the inspection
conducted
by Hessrs.
S.
L. HcCrory,
R.
E. Lantz.
T. 0. HcKernon,
and
D. L. Proulx, of this office on June 5-20,
1995.
The
inspection included
a review of activities authorized for your Washington
Nuclear Project-2 facility.
At the conclusion of the inspection,
the findings
were discussed
with you and those
members of your staff identified in the
enclosed
report.
Areas
examined during the inspection are identified in the report.
Within
these
areas,
the inspection consisted of selective examinations of procedures
and representative
records,
interviews with personnel'nd
observation of
activities in progress.
The purpose of the inspection
was to confirm that
control
room operating
crews were performing in accordance
with your
management
expectations
and procedures
and in accordance
with NRC
requirements.
While we concluded that operations
performance
was adequate
to protect public
health
and safety.
we remain concerned with the generally
low level of
operations
performance
and the lack of an established
improving trend.
A
number of long standing conditions which contribute to poor performance
were
still in evidence.
Based
on the results of this inspections
certain licensed activities appeared
to be in violation ot
NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because it was identified by
the
NRC.
Horeover, it typified previously identified weaknesses
regarding
procedural
adequacy,
information loss across shift turnover, corrective
actions,
and rigor concerning firm and discretionary
requirements.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response.
you should document the specific actions taken
and any additional
actions you plan to prevent recurrence.
Your response
may reference or
include previous docketed
correspondence. if the correspondence
adequately
@507++00
QQ000397
950720
pop
ADQCK
pop
8
~5OOH
addresses
the required
response.
After reviewing your response
to this
Notice. including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letters its enclosures,
and your response
wi 11
be placed in the
NRC
Public Document
Room (PDR).
To the extent possible.
your response
should not
include any personal
privacy. proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
However, if you find it
necessary
to include such information'ou should clearly indicate the
specific information that you desire not to be placed in the
PDR,
and provide
the legal basis to support your request for withholding the information from
the public.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
~ Thomas
P.
Gwynn. Director
Division of Reactor Safety
Enclosures:
1.
2.
NRC Inspection
Report
50-397/95-19 w/attachments
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H.
Swai les.
WNP-2 Plant Manager
P.O.
Box 968,
MD 927M
Richland'ashington
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George Washington
Way
P.O.
Box 968,
MD 396
Richland'ashington
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympi a. Washington
98504-3172
Washington Public Power Supply
System
-3-
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland'ashington
99352-0968
Washington Public Power Supply System
ATTN:
P.
R.
Bemis. Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser.
99350-0190
Winston
8 Strawn
ATTN:
M.
H.
Phi lips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply System
ATTN:
Jack Baker,
Nuclear Training
Manager
3000 George Washington
Way
P. 0.
Box 968.
MD 1028
Richland.
WA
99352-0968
Washington Public Power Supply
System
-4-
E-Hail report to D. Sullivan (DJS)
E-Hail report to NRR Event Tracking System
( IPAS)
bcc to
DMB (IE01) i y
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
S.
A. Richards.
NRR/HOLB
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME: R: t WNP'~WN519RP.SLM
To receive copy of document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" a No copy
RIV:RE:OP
RE:OP
RI: WNP2
RE:OP
C:OP
SLHcCrory*
RELantz*
TOHcKernon*
DLProulx*
JLPellet*
07/
/95
07/
/95
D:DRP
D:DRS '-
TPGwynn
JEDye
07/~/9
07/2o/95
revious y concurre
07/
/95
D:DRS
TPGwynn
07/~/95
07/
/95
07/
/95
Washington Public Power Supply
System
-4-
E-Hail report to D. Sullivan (DJS)
E-Mail report to NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E.
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
S.
A. Richards,
NRR/HOLB
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME: R:% WNPtWN519RP.SLM
To receive copy of docurnenf, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RE:OP
RIV:RE: OP
SLMcCrory*
07/
/95
RELantz*
07/
/95
D:DRS
D:DRP
TPGwynn
07/2o/95
JEDye
07/~/9
rev>ous y concurre
RI: WNP2
TOMcKernon*
07/
/95
D:DRS
TPGwynn
07/~/95
RE:OP
DLProulx*
07/
/95
C:OP
JLPellet*
07/
/95