Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342B236 + (16:51:15, 7 January 2025)
- L-88-126, Annual Nonradiological Environ Monitoring Rept for 1987 + (16:51:16, 7 January 2025)
- ML17342B234 + (16:51:18, 7 January 2025)
- L-88-139, Confirms Agreement from 880315 Meeting That Operability of Intake Cooling Water/Component Cooling Water HXs Will Be Verified by Determining That Every Combination of HXs Capable of Removing Design Basis Heat Loads + (16:51:19, 7 January 2025)
- L-88-131, Comment on Proposed Rule 10CFR50,App J Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors. Util Endorses Addition of Mass Point Methodology to Acceptable Leakage Rate Calculational Methods + (16:51:22, 7 January 2025)
- ML17342B232 + (16:51:22, 7 January 2025)
- L-88-145, Discusses Nuclear Property Insurance Programs for Onsite Property Damage + (16:51:33, 7 January 2025)
- L-88-122, Forwards Summary of mgt-on-shift Weekly Rept for Wk Starting 880229,per NRC 871019 Order + (16:51:36, 7 January 2025)
- L-88-111, Withdraws 880115 Request for Relief from Offsite Organization Tech Specs to Implement Changes in Organization of Nuclear Energy Dept Because Util Decided to Maintain Tech Spec Organization & Submit License Amends + (16:51:38, 7 January 2025)
- ML17342B222 + (16:51:41, 7 January 2025)
- IR 05000250/1987048 + (16:51:42, 7 January 2025)
- IR 05000250/1987052 + (16:51:44, 7 January 2025)
- ML17342B218 + (16:51:46, 7 January 2025)
- ML17342B217 + (16:51:47, 7 January 2025)
- ML17342B215 + (16:51:49, 7 January 2025)
- L-88-115, Special Rept:Fire Barrier Penetration Breached for Longer than 7 Days & Other Fire Protection Impairment Noted.Caused by Number of Impairments Being Performed.Plant Continues to Implement Compensatory Measures + (16:51:51, 7 January 2025)
- ML17342B214 + (16:51:51, 7 January 2025)
- 05000251/LER-1988-003-01, :on 880207,shutdown of Unit from 100% Power Commenced Due to Exceeding Requirements of Tech Spec for Having Battery Charger 4S Out of Svc.Caused by Failure of Snubber Capacitor.Capacitor Replaced + (16:51:58, 7 January 2025)
- L-88-119, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-08 & 50-251/87-08.Corrective Actions:Insp & Enhancement Program for Equipment Qualification Splices Initiated & Procedure Gmi 102.2 Revised + (16:52:00, 7 January 2025)
- ML17342B209 + (16:52:03, 7 January 2025)
- ML17342B207 + (16:52:05, 7 January 2025)
- L-88-108, Special Rept:On 880125,underground Fire Mains Ruptured During Excavation to Install Storm Drains & Catch Basins. Caused by Improper Work Controls & Fire Main Not Accurately Located Prior to Excavation.Initial Break Repaired + (16:52:08, 7 January 2025)
- 05000251/LER-1988-002-01, :on 880202,containment & Control Room Ventilation Isolation Occurred.Caused by Personnel Error While Performing Mod to Remove Remote Alarm Function.Planner & Technician Involved Counselled + (16:52:12, 7 January 2025)
- L-88-101, Semiannual Radioactive Effluent Release Rept,Jul-Dec 1987 + (16:52:14, 7 January 2025)
- L-88-102, Requests That Author Be Sent NRC Correspondence Re Plants at Listed Address + (16:52:16, 7 January 2025)
- ML17342B201 + (16:52:18, 7 January 2025)
- 05000251/LER-1988-001-01, :on 880129,operability Requirements of Tech Spec 3.5.1 for Steam Generator lo-lo Level Reactor Could Not Be Met.Caused by Procedural Error.Setpoints of Affected Channels Rechecked,Calibr & Procedure Revised + (16:52:20, 7 January 2025)
- ML17342B199 + (16:52:22, 7 January 2025)
- ML17342B198 + (16:52:22, 7 January 2025)
- 05000251/LER-1986-015, :on 860821,auxiliary Feedwater Sys Train Declared out-of-svc Due to Failed Valves.Caused by Wire Bundle Pressed Against Contact Switch,Keeping Contact Open. Wire Bundle Relocated + (16:52:24, 7 January 2025)
- 05000250/LER-1988-002, :on 880115,RCS Pressure Decreased to 625 Psig & Accumulators Started to Inject.Caused by Defective Controller for Valve PCV-3-455B.Controller Replaced + (16:52:26, 7 January 2025)
- ML17342B194 + (16:52:27, 7 January 2025)
- ML17342B191 + (16:52:28, 7 January 2025)
- ML17342B190 + (16:52:29, 7 January 2025)
- ML17342B188 + (16:52:30, 7 January 2025)
- ML17342B186 + (16:52:31, 7 January 2025)
- ML17342B185 + (16:52:31, 7 January 2025)
- ML17342B184 + (16:52:32, 7 January 2025)
- ML17342B183 + (16:52:33, 7 January 2025)
- ML17342B181 + (16:52:34, 7 January 2025)
- ML17342B182 + (16:52:34, 7 January 2025)
- ML17342B180 + (16:52:35, 7 January 2025)
- ML17342B179 + (16:52:36, 7 January 2025)
- ML17342B177 + (16:52:37, 7 January 2025)
- ML17342B178 + (16:52:37, 7 January 2025)
- ML17342B176 + (16:52:38, 7 January 2025)
- ML17342B175 + (16:52:38, 7 January 2025)
- ML17342B174 + (16:52:39, 7 January 2025)
- ML17342B173 + (16:52:40, 7 January 2025)
- ML17342B172 + (16:52:40, 7 January 2025)
- ML17342B171 + (16:52:41, 7 January 2025)