Forwards Select Sys Assessment Progress Summary & Performance Enhancement Program Schedule Change for Jan 1988.Completion Date of Performance Enhancement Program Which Involves Relocation of Equipment Extended to 880229
ML17342B185
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/16/1988
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-72, NUDOCS 8802220306
Download: ML17342B185 (6)


Text

REGULAl Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:

FACIL: 50-250 50-251 AUTH. NAME MOODY> C. O.

RECIP. NAME 8802220306 DOC. DATE: 88/02/16 NOTARIZED:

NO DOCKET 0 Turkey Point Planti Unit 3i Florida Power and Light C 05000250 Turkey Paint Planti Unit 4i Florida Power and Light C

05000251 AUTHOR AFFILIATION Florida Power 4 Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards select sos assessment progress summary 5

performance enhancement program schedule change for Jan 1988. Next completion date scheduled 880229.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR

~

ENCL i

SIZE:

TITLE:

OR Submittal:

General Distribution NOTES:

REC IP IENT ID CODE/NAME PD2-2 LA EDISON' COPIES LTTR ENCL 0

1 1

REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5

5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEBSH7 NRR/DEST/RSB 8E N

PMAS/ILRB12 EG 01 EXTERNAL:

LPDR NSIC 1

0 1

1 1

1 1

1 1

1 1

1 1

NRR/DEST/ADS7E4 NRR/DEBT/MTB 9H NRR/DOEA/TSB11F OGC 15-9-18 RES/DE/EIB NRC PDR 1

1 1

1 1

1 1

0 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 17

lE g

i r

I'I II 1

H If

/I

P. O.

f4000, JUNO BEACH, FL 33408-0420 FEBRUARY 1 6 1988 L-88-72 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Select System Assessment Progress Summary and Performance Enhancement Pro ram Schedule Chan e

Attached please find the January 1988 progress summary of the Select System Assessment.

A request"'o 'xtend the completion date of Performance Enhancem'ent Program, Project 1,-'ask 4.11 which involves the relocation of equipment and personnel into the new maintenance

building, was discussed with and agreed to by your, Region II staff.

The extension is required due to delays in, the receipt of some of the required internal furnishings.

The new completion date is February 29, 1988.

Should there be any questions regarding this information, please contact us.

Very truly yours, C.

O.

W dy Executive Vice President COW/SDF/dh Attachment cc:

Dr. J.

Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF.011.SSA 8802220SO6 S802>6J

, PDR ADOCK 05000250 R"

PDR an FPL Group company

\\

~.%

4 t.

Ql t

1

SELECT SYSTEM REVIEW JANUARY 1988 PROGRESS DESIGN BASIS RECONSTITUTION Work continues on a

risk based assessment of historic Plant Changes/Modifications.

Reconstitution of design bases for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Coolers is proceeding in accordance with the Integrated Schedule.

OTHER SIGNIFICANT PROGRESS o

Removed requirement for use of auxiliary oil pump during Auxiliary Feedwater Pump coast down.

o Confirmed ability to consider Containment Spray and Emergency Containment Coolers as redundant in a

Technical Specification context.

o Corrected Containment Spray T&E Drawing discrepancies o

Resolved Q-List discrepancy on Containment Spray o

Repaired grill on 4A Containment Spray Pump o

Completed PC/Ms to install orifices in Containment Spray Pumps.

Note:

The physical modifications were completed sometime ago.

o Corrected Chemical and Volume Control procedure discrepancy o

Revised Emergency Power (EP) instrument index to add various Emergency Diesel Generator instruments o

Corrected EP procedure discrepancy o

Corrected various EP maintenance deficiencies (detaj.ls available on request) o Corrected Main Steam Isolation procedure discrepancy o

Confirmed Technical Specification coverage for Reactor Protection System (RPS) shunt trip (under Interim Tech Specs).

Corrected various RPS maintenance deficiencies (details available on request)

Resolved Startup Field Report regarding inverter transfer to Constant Voltage Transformer Corrected various Vital Power maintenance deficiencies (details available on request)

/

wk(