ML17342B218

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/87-52 & 50-251/87-52 on 871214-18.No Violations or Deviations Noted
ML17342B218
Person / Time
Site: Turkey Point  
Issue date: 02/23/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342B219 List:
References
NUDOCS 8803160177
Download: ML17342B218 (3)


See also: IR 05000250/1987052

Text

FEB 28

1888

Docket 'Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

~N:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/87-52

AND 50-251/87-52

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

C.

Chou

on

December

14-18,

1987.

The

inspection

included

a

review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or deviations

were

identified.

Your attention is invited to the unresolved

items identified in the inspection

report.

These matters will be pursued

during future inspections.

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

.Sincerely,

Alan. R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

(See

page 2)

ggP3ib0177

8>

>50 seOW ppp ADOCK pgg 6 +go( 4 l' Florida Power and Light Company Enclosure: NRC Inspection Report c w/encl: . S. Odom, Vice President Turkey Point Nuclear Plant W J. Baker, Plant Manager ~Turkey Point Nuclear Plant W. Bladow, Plant gA Superintendent . Arias, Jr., Regulatory and Compliance Supervisor , b~ w/encl: "HRC Resident Inspector DRS Technical Assistant Document Control Desk State of Florida 0 RII RCChou:er 01/8 /88 p~~ B ake QZ ~/88 'I CC ristensen Wg+8