e
]=ACCELEMTZD 1HS ABUTILON DEMONSTR 'JION SYSTEM ACCESSION NBR:
FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CONWAY,W.F.
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8803010110 DOC.DATE: 88/02/26 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
St. Lucie Plant, Unit 2, Florida Power 6 Light Co.
AUTHOR AFFILIATION Florida Power 6 Light Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000000 05000250 05000251 05000335 05000389
SUBJECT:
Forwards util response to ISAP survey from Generic Ltr I
88-02.
D DISTRIBUTION CODE: A062D COPIES RECEIVED:LTR ~NCL ASSIZE:
TITLE: OR Licensing Submittal: Integrated Safety Assessment Program (ISAPII) g NOTES RECIPIENT ID CODE/NAME PD2-2 LA PD2-2 PD TOURIGNY,E INTERNAL ACRS NRR/DE ST/ADS 7E NRR/DEST/MTB 9H NRR/DOEA/TSB11F OGC 15-B-18 RES/DE/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 5
5 1
1 6
6 1
1 1
1 1
1 1
0 1
1 2
2 1
1 RECIPIENT ID CODE/NAME NRR MILLER,M EDISON,G ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/RSB 8E ILRB12 REG F LE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
1 A
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 26
0
/
1
P. O.
14000, JUNO BEACH, FL 33408.0420 gyYlll/y~
FEBRUARY~ 2 6 1988 L-88-92 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentl'emen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Generic Letter 88-02 "Integrated Safety Assessment Program II ISAP II In Generic Letter 88-02, the NRC summarized its activities related to ISAP and identified benefits from the ISAP pilot program.
The NRC stated that it was researching the desirability of extending ISAP beyond the pilot program and, among other things, was determining the industry s interest in such a program.
Attachments 1
and 2
are FPL's response to the ISAP survey from Generic Letter 88-02 for Turkey Point Units 3 and 4 and St.
Lucie Units 1
and 2, respectively.
FPL's response 'has been delayed from the NRC requested response date.
This delayed response was found acceptable by the NRC Staff.
If additional information is required on this subject, please contact us..
Very truly yours, W. F.
Conwa Senior Vice President Nuclear WFC/EJW/dh Attachments Dr. J.
Nelson Grace, Regional Adminstrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Senior Resident Inspector, USNRC, Turkey Point Plant EJW23.ISAP f
88PPPg0gg0 8802og PDR ADOCK 05000250 r
.. ace an FPL Group company
~
~
~
~
I.
I
Inte rated Safet Assessment Pro ram ISAP II Res onse Format to Generic Letter 88-02 Facility Name:
Turke Point Units 3
& 4 Utility: Florida Power
& Li ht Com an Individual Contact Name:
J.
A. DeMastr Telephone:
305 694-3613 An expression of inter'est will not be considered a
commitment to participate on the part of the utility.
1.
Would you be interested in participating in ISAP II. If so, in what time frame?
We are unable to detevIune at this time.
2 ~
Do you believe that an industry/NRC seminar consisting of a brief discussion by NRC followed by a question and answer period would be beneficial prior to making a decision?
Yes.
%his would provide an opportunity to obtain additional details regarding the ISAP II pxoglran>.
3.
Would you be interested in a one-on-one meeting with 'the NRC to discuss your particular facility or facilities?
Not until after the industxy/NRC Seminars have been held.
4 ~
If you remain undecided regarding participation, what additional information do you need in order to make a decision?
Specific program rect.irements for an ISAP II applicable to Turkey Point Units 3 and 4, and additional details regarding advantages and disadvantages of program implementation.
5.
Do you have any potential concerns about participating in ISAP II?
Yes.
We would be in a better position to discum these after the industry/NRC meetings.
6.
Do you have any suggestions for program improvements or changes?
Not at this time.
0
Inte rated Safet Assessment Pro ram ISAP II Res onse Format to Generic Letter 88-02 Facility Name:
St. Lucie Units 1
& 2 Utility: Florida Power
& Li ht Com an Individual Contact Name:
J.
A. DeMastr Telephone:
305 694-3613 An expression of interest will not be considered a
commitment to participate on the part of the utility.
1.
Would you be interested in participating in ISAP II. If so, in what time frame?
We are unable to detexnune at this time.
2.
Do you believe that an industry/NRC seminar consisting of a brief discussion by NRC followed by a question and answer period would be beneficial prior to making a decision?
Yes.
Lhis would provide an opportunity to obtain additional details xegmzhxg the ISAP II program.
3.
Would you be interested in a one-on-one meeting with the NRC to discuss your particular facility or facilities?
Not until after the industry/NRC Seminars have been held.
4 ~
If you remain undecided regarding participation, what additional information do you need in order to make a decision?
Specific program requirements for an XKP II applicable to St.
tucie Units 1
and 2,
and additional details regarding advantages and disadvantages of program implementation.
5.
Do you have any potential concerns about participating in ISAP II?
Yes.
We would be in a better position to discuss these after the industxy/NRC meetings.
6.
Do you have any suggestions for program improvements or changes?
Not at this time.