Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DCL-87-115, Applicant Exhibit A-8,consisting of Responding to Questions Re Reracking Analyses Discussed in 870506 Reracking Meeting W/Nrc + (12:03:32, 2 December 2024)
- ML20237J820 + (12:03:32, 2 December 2024)
- ML20237J819 + (12:03:33, 2 December 2024)
- ML20237J818 + (12:03:34, 2 December 2024)
- 05000354/LER-1987-030, :on 870714,HPCI Initiation Occurred While Valving in Level Transmitter on Low Pressure Side of Reactor Vessel Level Ref Leg.Caused by Design Deficiency in Transmitter.Design Change Implemented + (12:03:35, 2 December 2024)
- ML20237J815 + (12:03:36, 2 December 2024)
- ML20237J814 + (12:03:37, 2 December 2024)
- ML20237J812 + (12:03:38, 2 December 2024)
- ML20237J809 + (12:03:39, 2 December 2024)
- ML20237J810 + (12:03:39, 2 December 2024)
- ML20237J808 + (12:03:40, 2 December 2024)
- ML20237J806 + (12:03:41, 2 December 2024)
- IR 05000456/1987023 + (12:03:50, 2 December 2024)
- 05000341/LER-1987-031, :on 870720,high Vibration Signal Caused Turbine Control Valve Fast Closure & Reactor Scram Resulted.Caused by Erroneous High Vibration Signal from Faulty Shaft Rider Sensor Connection.Design Change Being Prepared + (12:03:52, 2 December 2024)
- ML20237J802 + (12:03:53, 2 December 2024)
- ML20237J800 + (12:03:54, 2 December 2024)
- ML20237J797 + (12:03:55, 2 December 2024)
- TXX-2866, Responds to Violations Noted in Insp Repts 50-445/78-11 & 50-446/78-11 on 780620-23.Corrective Actions:Pipe Spools Inspected & Tagged & Formal QA Surveillances of Cleanliness Control Will Be Performed on Monthly Basis + (12:03:56, 2 December 2024)
- ML20237J794 + (12:03:56, 2 December 2024)
- IR 05000443/1987018 + (12:03:57, 2 December 2024)
- ML20237J792 + (12:03:58, 2 December 2024)
- ML20237J790 + (12:03:59, 2 December 2024)
- ML20237J789 + (12:03:59, 2 December 2024)
- ML20237J786 + (12:04:00, 2 December 2024)
- ML20237J785 + (12:04:01, 2 December 2024)
- B12631, Suppl to 1986 Annual Environ Operating Rept.Procedures Will Be Initiated by 871031 for Submittal of NPDES Permit Changes.All Permit Changes Will Be Submitted to NRC + (12:04:02, 2 December 2024)
- ML20237J781 + (12:04:03, 2 December 2024)
- ML20237J782 + (12:04:03, 2 December 2024)
- ML20237J779 + (12:04:04, 2 December 2024)
- TXX-6643, Interim Deficiency Rept CP-87-37 Re Failure of Westinghouse Mfg 3-inch motor-operated Gate Valves to Completely Close Under Preoperational Test Conditions.Initially Reported on 870715.Next Rept Will Be Submitted by 870925 + (12:04:05, 2 December 2024)
- ML20237J778 + (12:04:05, 2 December 2024)
- TXX-2829, Responds to Violations Noted in Insp Repts 50-445/78-05 & 50-446/78-05 on 780321-24.Corrective Actions:Counterbored Piping Evaluated & Not Found Detrimental & Counterboring Instruction Issued.Full Compliance Achieved on 780324 + (12:04:06, 2 December 2024)
- 0CAN078701, Responds to NRC Ltr Re Violations & Deviation Noted in Insp Repts 50-313/87-06 & 50-368/87-06.Corrective Actions: Compacting Activities Suspended Pending Resolution of Effluent Monitoring + (12:04:07, 2 December 2024)
- ML20237J772 + (12:04:07, 2 December 2024)
- 05000456/LER-1987-038, :on 870716,control Room Ventilation Shifted to Emergency Makeup Mode as Result of Noise Spike on Associated Radiation Monitor.Noise Spike Caused by Transistor Failure in Particulate Channel High Voltage Power Sys + (12:04:09, 2 December 2024)
- ML20237J769 + (12:04:10, 2 December 2024)
- IR 05000424/1987050 + (12:04:11, 2 December 2024)
- ML20237J763 + (12:04:11, 2 December 2024)
- ML20237J762 + (12:04:13, 2 December 2024)
- ML20237J757 + (12:04:14, 2 December 2024)
- ML20237J761 + (12:04:14, 2 December 2024)
- ML20237J755 + (12:04:15, 2 December 2024)
- ML20237J754 + (12:04:16, 2 December 2024)
- ML20237J752 + (12:04:16, 2 December 2024)
- ML20237J747 + (12:04:18, 2 December 2024)
- TXX-2859, Responds to NRC Re Violations Noted in Insp Repts 50-445/78-05 & 50-446/78-05.Technical Acceptability of Pipe Discussed.Subj Welds Met ASME Boiler & Pressure Vessel Code, Summer 1976 Addenda Requirements + (12:04:18, 2 December 2024)
- ML20237J745 + (12:04:20, 2 December 2024)
- ML20237J743 + (12:04:21, 2 December 2024)
- ML20237J742 + (12:04:22, 2 December 2024)
- ML20237J741 + (12:04:23, 2 December 2024)
- ML20237J740 + (12:04:23, 2 December 2024)
- ML20237J738 + (12:04:24, 2 December 2024)