Informs That Concerns Raised by IE Bulletin 80-08 Considered Closed.No Significant Indications Observed During Spring 1987 Maint/Refueling Outage for Remaining Welds at Unit 1
ML20237J800
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/21/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-CR-3053 IEB-80-08, IEB-80-8, SL-3062, NUDOCS 8708260322
Download: ML20237J800 (2)


Text

,

Georgia Power Company

' 3 -: ~ 333 Piedmont Avenue

]

Atlanta, Georgia 30308 i

I

- Telephone 404 526-6526 h

' Malhng Address:

Post Office Box 4545 h

Atlanta, Georgia 30302 Georgia Power

]

L T. Gucwa the southern Mcx:Inc system Manager Nuclear Safety and Ucensing SL-3062 1602C-X7GJ17-H110 August 21, 1987 U.'S. Nuclear Regulatory Commission ATTN: Document Control Desk-Washington, D. C.

20535 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366-OPERATING LICENSES DPR-57, NPF-5 CLOSE00T OF I&E BULLETIN 80-08 EXAMINATION OF CONTAINMENT LINER PENETRATION HELDS

. Gentlemen:

By letter dated August 8,1986, Georgia Power Company (GPC) committed to the NRC to perform nondestructive examination of certain containment penetration assemblies. :The letter delineated the specific penetrations which would allow for.the closeout.of NRC 'I&E Bulletin 80-08 and NUREG/CR-3053 for.both Unit 1 and Unit 2, and indicated ~ the examination would be performed during the next scheduled maintenance / refueling outage for the respective units.

During the Fall 1986 Hatch Unit 2 maintenance / refueling outage the pertinent welds for the containment liner penetrations were examined.

A.P reported by letter on February 27, 1987, no significant indications were detected.

During the Spring 1987 maintenance / refueling outage, the remaining welds for. Unit 1 were examined.

Again, no significant indications were observed.

Georgia Power Company now concludes that the concerns raised by I&E Bulletin 80-08 are hereby closed for both Plant Hatch Units.

If you have any questions in this regard, please contact this office at any time.

Sincerely, NO NON L. T. Gucwa I

g y

D GKH/lc I

c:

(see next page)

_ _ _ ~

i.

3 Georgla Power A L

U. S. Nuclear Regulatory Commission ii LAugust:21, 1987

,Page Two-l' 1

c: Georaia Power Comoany Mr. J.. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatorv Commission. Washington. D. C.

Hr.:L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr._J. N. Grace, Regional Administrator Mr. P. Holmes-Ray,- Senior Resident Inspector - Hatch i.