ML20237J800
| ML20237J800 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/21/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| RTR-NUREG-CR-3053 IEB-80-08, IEB-80-8, SL-3062, NUDOCS 8708260322 | |
| Download: ML20237J800 (2) | |
Text
,
- Georgia Power Company
' 3 -: ~ 333 Piedmont Avenue
]
Atlanta, Georgia 30308 i
I
- - Telephone 404 526-6526 h
' Malhng Address:
Post Office Box 4545 h
Atlanta, Georgia 30302 Georgia Power
]
L T. Gucwa the southern Mcx:Inc system Manager Nuclear Safety and Ucensing SL-3062 1602C-X7GJ17-H110 August 21, 1987 U.'S. Nuclear Regulatory Commission ATTN: Document Control Desk-Washington, D. C.
20535 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366-OPERATING LICENSES DPR-57, NPF-5 CLOSE00T OF I&E BULLETIN 80-08 EXAMINATION OF CONTAINMENT LINER PENETRATION HELDS
. Gentlemen:
By letter dated August 8,1986, Georgia Power Company (GPC) committed to the NRC to perform nondestructive examination of certain containment penetration assemblies. :The letter delineated the specific penetrations which would allow for.the closeout.of NRC 'I&E Bulletin 80-08 and NUREG/CR-3053 for.both Unit 1 and Unit 2, and indicated ~ the examination would be performed during the next scheduled maintenance / refueling outage for the respective units.
During the Fall 1986 Hatch Unit 2 maintenance / refueling outage the pertinent welds for the containment liner penetrations were examined.
A.P reported by letter on February 27, 1987, no significant indications were detected.
During the Spring 1987 maintenance / refueling outage, the remaining welds for. Unit 1 were examined.
- Again, no significant indications were observed.
Georgia Power Company now concludes that the concerns raised by I&E Bulletin 80-08 are hereby closed for both Plant Hatch Units.
If you have any questions in this regard, please contact this office at any time.
Sincerely, NO NON L. T. Gucwa I
g y
D GKH/lc I
c:
(see next page)
_ _ _ ~
i.
3 Georgla Power A L
U. S. Nuclear Regulatory Commission ii LAugust:21, 1987
,Page Two-l' 1
c: Georaia Power Comoany Mr. J.. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatorv Commission. Washington. D. C.
Hr.:L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr._J. N. Grace, Regional Administrator Mr. P. Holmes-Ray,- Senior Resident Inspector - Hatch i.
l 1
1602C rem '
__--_----_J