Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20046B068 + (15:15:36, 19 December 2024)
- ML20046B066 + (15:15:38, 19 December 2024)
- ML20046B064 + (15:15:39, 19 December 2024)
- ML20046B061 + (15:15:40, 19 December 2024)
- IR 05000482/1993015 + (15:15:41, 19 December 2024)
- IR 05000334/1993009 + (15:15:45, 19 December 2024)
- PNO-IV-93-020C, updating Previous Notifications Re Unusual Event Resulting from High Missouri River Water Level. Station Remains in Cold Shutdown & Licensee Has Been Developing Plant Recovery & Restart Plan + (15:15:47, 19 December 2024)
- ML20046B057 + (15:15:49, 19 December 2024)
- ML20046B052 + (15:15:50, 19 December 2024)
- ML20046B051 + (15:15:51, 19 December 2024)
- ML20046B050 + (15:15:52, 19 December 2024)
- ML20046B046 + (15:15:55, 19 December 2024)
- ML20046B043 + (15:15:56, 19 December 2024)
- ML20046B042 + (15:15:58, 19 December 2024)
- ML20046B039 + (15:15:59, 19 December 2024)
- ML20046B038 + (15:16:01, 19 December 2024)
- ET-NRC-93-3933, Forwards Proprietary Draft Scaling Analysis for Osu AP600 Integral Sys & Long Term Cooling Test Facility & Application for Withholding.Encl Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse + (15:16:01, 19 December 2024)
- ML20046B035 + (15:16:04, 19 December 2024)
- PNO-I-93-037, on 930727,State of Co Department of Environ Protection Notified Region I That Radioactive Waste Discovered at Commerical Incinerator Facility.Waste Rejected by Incinerator Facility & Returned to Trash Hauler Facility + (15:16:07, 19 December 2024)
- ML20046B032 + (15:16:09, 19 December 2024)
- 05000336/LER-1993-012, :on 930524,turbine & Reactor Tripped During Mussel Cook (Thermal Backwash) Due to Lack of Heat Removal Capabilities from Main Generator Stator Water Cooling Sys. Installed Thermoconductivity Filler + (15:16:10, 19 December 2024)
- ML20046B030 + (15:16:12, 19 December 2024)
- ML20046B029 + (15:16:13, 19 December 2024)
- ML20046B028 + (15:16:14, 19 December 2024)
- IR 05000184/1993001 + (15:16:15, 19 December 2024)
- ML20046B025 + (15:16:17, 19 December 2024)
- ML20046B023 + (15:16:18, 19 December 2024)
- ML20046B021 + (15:16:19, 19 December 2024)
- IR 05000245/1993016 + (15:16:29, 19 December 2024)
- IR 05000317/1993019 + (15:16:34, 19 December 2024)
- 05000245/LER-1993-007-02, :on 930623,TBSCCW Sys Pressure Boundary Integrity Failed Due to Incomplete Review of Safety & non-safety-related Sys Interface.Isolation Valve (1-SC-184) 3/4-SC-105 Closed + (15:16:36, 19 December 2024)
- ML20046B017 + (15:16:37, 19 December 2024)
- ML20046B015 + (15:16:39, 19 December 2024)
- ML20046B013 + (15:16:40, 19 December 2024)
- ML20046B012 + (15:16:41, 19 December 2024)
- ML20046B010 + (15:16:43, 19 December 2024)
- ML20046B011 + (15:16:43, 19 December 2024)
- LD-93-122, Forwards Matl to Close follow-on Questions to Dser Responses + (15:16:44, 19 December 2024)
- IR 05000282/1993008 + (15:16:46, 19 December 2024)
- ML20046B007 + (15:16:48, 19 December 2024)
- ML20046B006 + (15:16:49, 19 December 2024)
- ML20046B005 + (15:16:50, 19 December 2024)
- ML20046B003 + (15:16:51, 19 December 2024)
- ML20046B002 + (15:16:52, 19 December 2024)
- ML20046B001 + (15:16:53, 19 December 2024)
- ML20046B000 + (15:16:54, 19 December 2024)
- ML20046A999 + (15:16:55, 19 December 2024)
- ML20046A998 + (15:16:56, 19 December 2024)
- ML20046A997 + (15:16:58, 19 December 2024)
- ML20046A994 + (15:16:59, 19 December 2024)
- ML20046A991 + (15:17:00, 19 December 2024)