4 s

J I

TABLE 3.3-1 (Continued)

TABLE NOTATIONS

'Only if the reactor trip breakers happen to be in the closed position and the Control Rod Drive System is capable of rod withdrawal.

bBelow the P-6 (Intermediate Range Neutron Flux Interlock) Setpoint.

1

  • Below the P-10 (Low Setpoint Power Range Neutron Flux Interlock) Setpoint.

d Above the P-7 (At Power) Setpoint

' Deleted.

i

'Above the P-8 (3-loop flow permissive) Setpnint.

'Above the P-7 and below the P-8 Setpoints.

f "The boron dilution flux doubling signals may be blocked during reactor startup.*

'Above the P-9 (Reactor trip on Turbine trip Interlock) Setpoint.

ACTION STAIEMENTS ACTION 1 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

i ACTION 2 - With the number of OPERABLE channels one less than the Total I

Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 1

b.

The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1, and c.

Either, THERMAL POWER is restricted to less than or equal to 75% of RATED THERMAL POWER and the Power Range Neutron Flux Trip Setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per Specification 4.2.4.2.

l i

  • Boron Dilution Flux Doubling requirements become effective for Unit 1 and i

Unit 2 after criticality for Unit 1, Cycle 4.

j COMANCHE PEAK - UNITS 1 AND 2 3/4 3-5 Unit 1 - Amendment No. 40,44,16 Unit 2 - Amendment No. 2 9308020234 930712 PDR ADOCK 05000445 j

P PDR

i r

TABLE 3.3-1 (Continued)

ACTION STATEMENTS (Continued)

O ACTION 3

- With the number of channels OPERABLE one less than the Minimum Channels OPERABLE requirement and with the THERMAL POWER level:

a.

Below the P-6 (Intermediate Range Neutron Flux Interlock)

Setpoint, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 '

Setpoint, b.

Above the P-6 (Intermediate Range Neutron Flux Interlock)

Setpoint but below 10% of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing j

THERMAL POWER above 10% of RATED THERMAL' POWER.

i ACTION 4

- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, suspend all operations involving i

positive reactivity changes.

ACTION 5.1 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or within the next hour open the reactor trip breakers and suspend all operations involving positive reactivity changes. With no channels OPERABLE

.l complete the above actions within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

ACTION 5.2* - With the number of OPERABLE channels one less'than the Minimum

.j Channels OPERABLE requirement, restore the inoperable channel

~

to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or within the next hour verify either valve CS-8455 or valves CS-8560, FCV-1118, CS-8439, CS-8441, and CS-8453 are closed and secured in position, and verify this position at least once per 14 days thereafter.

With no channels OPERABLE, complete the above actions within 4-hours and verify the positions of the above valves at least once per 14 days thereafter.

ACTION 6

- With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the. tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and b.

The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.

ACTION 7

- With less than the Minimum Number of Channels OPERABLE, within I hour determine by observation of the associated permissive annunciator window (s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

  • Boron Dilution Flux Doubling requirements become effective for Unit I and Unit 2 after criticality for Unit 1, Cycle 4.

COMANCHE PEAK - UNITS 1 AND 2 3/4 3-6 Unit 1 - Amendment No. M,44,16 Unit 2 - Amendment No. 2