{XS Docket No. 50-293 3 1993 E. Thomas Boulette, PhD Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 l
Dear Dr. Boulette:
SUBJECT:
10 CFR 50.54 QUALITY ASSURANCE PROGRAM CHANGE REVIEW
References:
Letter dated June 28,1993, from Dr. E. T. Boulette to the U. S. Nuclear Regulatory Commission transmitting the annual summary of changes to the Boston Edison Quality Assurance Program Description We received your 10 CFR 50.54(a) submittal, referenced above, transmitting the annual summary of changes t "le Boston Edison Quality Assurance Program Description as listed in the Boston Edison Quality Assurance Mannual (BEQAM), Volume II. The Region I staff has reviewed this submittal in accordance with 10 CFR 50.54(a) and determined that the changes to the Quality Assurance Program are acceptab!e in that the Quality Assurance Program continues to satisfy the criteria of Appendix B of 10 CFR Part 50. If there are changes to other operative QA commitments existing in docketed correspondence outside of the QA program description, you are obligated to notify this effice. Implementing such changes should be based on 10 CFR 50.54(a)(3).
The effectiveness of your Quality Assurance Program and procedure implementation will continue to be the subject of routine regional inspections.
If you have any questions concerning the above, please contact Mr. N. Blumberg at (215) 337-5199 or Mr. F. Bower at (215) 337-5328.
Sincerely, Original Signed By:
Glenn W. Meyer gnA H. Bettenhausen, Chief Operations Branch Division of Reactor Safety OFFICIAL RECORD COPY G:BdQAPCR.LTR 788" 288n 8s8582 6 1 0
-k P
/
L.
e
't J
E. Thomas Boulette, PhD 2
M 22 &
cc:
E. Kraft, Vice President, Nuclear Operations and Station Director L. Schmeling, Plant Department Manager V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department D. Tarantino, Nuclear Information Manager N. Desmond, Compliance Division Manager R. Hallisey, Department of Public Health, Commonwealth of Massachusetts R. Adams, Department of I2bor and Industries, Commonwealth of Massachusetts The Honorable Edward M. Kennedy The Honorable John F. Kerry The Honorable Edward J. Markey The Honorable Terese Murray The Honorable Peter V. Forman B. Abbanat, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director Paul W. Gromer, Massachusetts Secretary of Energy Resources Sarah Woodhouse, Ixgislative Assistant A. Nogee, MASSPIRG Regional Administrator, FEMA Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attorney General, Commonwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts, SLO Designee OFFICIAL RECORD COPY G:BEQACDEL.LTR
{.
1, E. Thomas Boulette, PhD 3
JUL 2 31993 bec:
Region I Docket Room (witn concurrences)
F. Bower, DRS V. Curley, DRS DRS File bec (VIA E-MAIL):
W. Butler, NRR R. Eaton, NRR V. McCree, OEDO R. Gramm, NRR (VIA FeMAIL AND NO ATTACIIMENT)
L. Bettenhausen, DRS i
N. Blumberg, DRS J. Caruso, DRS I
l J
i RI:DRS RI:DRS RI:DRS Bower / mg Blumberg tienhausen p
./
07/2 /
J 07/3/93 07AA/93 OFFICIAL RECORD COPY G:BEQAPCR.LTR