- ML20151B086 + (12:14:21, 11 December 2024)
- 05000424/LER-1987-069, :on 871120,plant Operated Above Max Power Level Specified in Ol.Caused by Nuclear Instrumentation Being Allowed to Indicate Below Calorimetric Value.Procedures Revised & Computer Point U1118 Validated + (12:14:23, 11 December 2024)
- ML20151B083 + (12:14:24, 11 December 2024)
- 05000366/LER-1988-005-01, :on 880305,instruments Remained Inoperable for Longer than Permitted by Tech Specs.Caused by Personnel Error in Failing to Comply W/Procedure.Procedure Revised & Plant Personnel Counselled + (12:14:25, 11 December 2024)
- ML20151B081 + (12:14:26, 11 December 2024)
- ML20151B080 + (12:14:27, 11 December 2024)
- ML20151B075 + (12:14:28, 11 December 2024)
- 05000374/LER-1988-002-07, :on 880303,Group 10 Isolation Occurred While Performing Instrument Surveillance Test.Caused by Failed Contact on Test Switch.Test Switch Replaced,Tested & Returned to Operation + (12:14:29, 11 December 2024)
- ML20151B072 + (12:14:30, 11 December 2024)
- ML20151B064 + (12:14:32, 11 December 2024)
- ML20151B060 + (12:14:35, 11 December 2024)
- IR 05000373/1988004 + (12:14:40, 11 December 2024)
- IR 05000245/1988007 + (12:14:44, 11 December 2024)
- 05000339/LER-1987-012, :on 870831,three Valves Failed Type C Local Leak Rate Testing.Caused by Incorrect Testing Methods & Seating Surface degradation.Air-operated Valve Retested Correctly & Check Valve Cleaned & Relapped + (12:14:49, 11 December 2024)
- ML20151B050 + (12:14:50, 11 December 2024)
- ML20151B049 + (12:14:51, 11 December 2024)
- IR 05000289/1988012 + (12:14:52, 11 December 2024)
- ML20151B045 + (12:14:53, 11 December 2024)
- ML20151B043 + (12:14:54, 11 December 2024)
- ML20151B039 + (12:14:55, 11 December 2024)
- ML20151B040 + (12:14:55, 11 December 2024)
- ML20151B038 + (12:14:56, 11 December 2024)
- ML20151B033 + (12:14:57, 11 December 2024)
- ML20151B030 + (12:14:57, 11 December 2024)
- PNO-III-88-029, on 880402,shutdown Begun to Repair Steam Generator Tube Leak.Leakage Rate from RCS Into Secondary Sys Calculated to Be 330 Gallons Per Day.Other Maint & Testing Work Planned in Addition to Investigation & Repair + (12:14:58, 11 December 2024)
- ML20151B023 + (12:14:59, 11 December 2024)
- ML20151B019 + (12:15:00, 11 December 2024)
- ML20151B018 + (12:15:00, 11 December 2024)
- ML20151B016 + (12:15:01, 11 December 2024)
- ML20151B017 + (12:15:01, 11 December 2024)
- ML20151B013 + (12:15:03, 11 December 2024)
- IR 05000456/1988012 + (12:15:05, 11 December 2024)
- ML20151B010 + (12:15:05, 11 December 2024)
- ML20151B004 + (12:15:06, 11 December 2024)
- ML20151B008 + (12:15:06, 11 December 2024)
- ML20151B003 + (12:15:07, 11 December 2024)
- ML20151A998 + (12:15:08, 11 December 2024)
- ML20151B001 + (12:15:08, 11 December 2024)
- ML20151A996 + (12:15:09, 11 December 2024)
- ML20151A992 + (12:15:10, 11 December 2024)
- ML20151A988 + (12:15:10, 11 December 2024)
- PNO-V-88-024, util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete + (12:15:11, 11 December 2024)
- ML20151A983 + (12:15:12, 11 December 2024)
- ML20151A985 + (12:15:12, 11 December 2024)
- ML20151A982 + (12:15:13, 11 December 2024)
- ML20151A980 + (12:15:13, 11 December 2024)
- ML20151A979 + (12:15:14, 11 December 2024)
- ML20151A976 + (12:15:15, 11 December 2024)
- ML20151A974 + (12:15:15, 11 December 2024)
- ML20151A973 + (12:15:16, 11 December 2024)
- ML20151A971 + (12:15:16, 11 December 2024)