|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
_
- JUL 081988 Docket No. 50-293 MEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 FROM: A. Randy Blough, Chief Reactor Projects Section No. 3B
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD JUNE '.E - ;.LY 1,1988 Enclosed is the Pilgrim bi-weekly status report from the N;C lusicent Office at Pilgrim. Three resident inspectors monitored activities at the giant during the report period. In addition, two region-based specialist inspi:: ors were onsite during the week of June 20 and 27,1988, to review 1icensee :arrective actions on previous electrical team inspection findings. On June M ,1988, a publicly held management rr.eeting was conducted at the NRC kglanal Office in King of Prussia, Pennsylvania, to discuss the licensee's response to the NRC Maintenance Team Inspection, as well as the licensee's folloup of their self-assessment of readiness for restart.
The Pilgrim hi-weekly status report is intended to provide MC nanagement and the public with an overview of plant activities and NRC insmtion activities.
Subsequent inspection reports will address many of these tcpics in more detail, ggmi 0tsrad ;7 L A. Randy Blough, Chief Reactor Projects Section No. 38
Enclosure:
As stated
$0r i\\
OFFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0001.0.0 07/08/88 8807200207 880708 PDR ADOCK 05000293 R PDC
' l '.
~
F
-Memorandum for James T. Wiggins 2 JUL 081988 cc w/ enc 1:
L. Gustin, Vice President - Corporate Relations, BECo R.' Bird, Senior Vice President-Nuclear, BECo K. Highfill, Station Director, BECo J. Keyes,. Licensing Division Manager, BECo The Honorable Edward P. Kirby The Honorcble Peter V. Forman.
The Honorable Edward J. Markey Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Duxbury Chairman, Board of Selectmen, Marshfield Chairman, 30ard of Selectmen, Kingston Plymouth C'vil Defense Director M. Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollan., Energy Secretary, Commonwealth of Massachusetts B. McIntyre, Chairman, Department of Public Utilities N. Johnson, Chairman, Duxbury Nuclear. Committee R. Boulay M. Conyngham M. Jeka K. Anderson Public Document Room (POR)
Local Public Dccument Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resicent Inspector Commonwealth of Massachusetts (2) r i
- 0FFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0002.0.0 '
07/08/88
Memorandum for James T. Wiggins 3 Ub lbOO bcc w/ encl:
Region I Docket Room (with concurrences)
T. Murley, NRR F. Miraglia, NRR T. Martin, Nr.'
S. Varga, NRR B. Boger, NRR
- 0. Crutchfield, NRR J. Partlow, NRR C. Rossi, NRR L. Shao, NRR R. Wessman, NRR D. Mcdonald, NRR J. Roe, NRR W. Russell, RI W. Kane, RI W. Johnston, RI F. Congel, RI S. Collins, RI R. Blough, RI L. Doerflein, RI M. Kohl, RI M. J. DiDonato, RI (2)
K. Abraham, RI (2)
RI:DRP RI:DRP I:0RP Cyarfen/mjd RB h JWiggins 7/e/dP 7 //
C/ !?8 - !* -
/[/88 0FFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0003.0.0 07/08/88
e ,e ENCLOSUR_E PILGRIM STATUS REPORT FOR THE PERIOD JUNE 18 - JULY 1, 1988 1.0 Plant Sta us As of.8:00 a.m., on June 17, 1988, the reactor was in cold shutdown mode with moderator temperature about 93 degrees Fahrenheit.
2.0 Facility Operations Summary The- plant has been shutdown for maintenance and to make program improve-
.nents since April 12, 1986. The reactor core was completely defueled on February 13, 1987 to facilitate extensive maintenance and modification of plant equipment. The licensee completed fuel reload on October 14, 1987.
Reinstallation of the reactor vessel internal components and the vessel head was followed by completion of the reactor vessel hydrostatic test.
The primary containment integrated leak rate test was also completed dur-ing the week of Dece#er 21, 1987. During this period, the licensee per-formed routine maintenance and surveillance tests including the local leak rate testing of selected containment isolation valves.
3.0 Items of Special Interes+
Management Meeting On June 27, 1988, a publicly held management meeting was conducted at the NRC office in King of Prussia, Pennsylvania, to discuss the licensee's response to the NRC Maintenance leam Inspection and their actions in followup of their self-assessment of restart readiness. At that meeting, the licensee requested commencement of a comprchensive NRC Integrated Assessment . Team Inspection (IATI). The meeting was attended by the senior licensee representatives and NRC management. Mr. Peter Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts, Mr. Jeffrey Hausner, Director, Nuclear Safety Emergency Preparedness Pro-gram, and Mr. George Dean, Assistant Attorney General, of Commonwealth of Ma sachusetts were also in attendance. ,
Recent NRC Inspection Results.
On July 1,1988, NRC Region I issued inspection report 50-293/88-12, documenting the results of a routine inspection conducted on April 19 -
May 31, 1988, by the resident inspectors. Improved conduct of operations in the control room and the licensee management's recent strong actions to resolve maintenance program weaknesses were considered as a licensee strength. The report identified a case of inadequate licensee response to a previous violation concerning failure to perform periodic testing of safety-related-DC circuit breakers. The licensee's revised response and corrective actions will be reviewed by the NRC inspectors in a future inspection.
OFFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0004.0.0 07/08/88
7_
'e .
Enclosure 2 NRC Region I -Inspection Report 50-293/88-22 was issued on June 24, 1988, documenting the results of -a routine radiation protection inspection con- l
-ducted on May 23-26,.1988,-by two region-based specialist inspectors. The major decontamination effort of the station to -levels ' allowing access to many plant' areas in street clothes was considered a strength. A number of other observations during the inspection indicated improving perform-ance in the area of radiation safety, however,- the need for additional management attention to certain program areas was identified.
NRC Assessment' Panel Meeting On June 30, 1988, members of NRC management from Region I and NRR met onsite and discussed inspection plans with the NRC resident staff. The NRC Assessment Panel meets periodically to coordinate preplanning and execution of NRC inspection and licensing activities related to Pilgrim.
The Panel is chaired by Mr. Samuel J. Collins, Deputy Director, Division -
of Reactor Projects, NRC Region I.
4.0 Emergency Notification System (ENS) Report During this period, the licensee made the following report to the NRC pursuant to 10 CFR 50.72:
On June 26, 1988, the licensee informed the NRC Headquarters Duty Office via a commercial telephone line about the. inoperable ENS. The ENS is a dedicated telephone system between the station control room and the NRC-Headquarters Duty Officer. The ENS was returned to service on June 27, 1988.
On July 1,1988, in accordance with 10 CFR 50.72(b)(2)(vi), the licensee informed the NRC of a planned press release by the licensee regarding a recently released study by the Commonwealth of Massachusetts Department of Public Health.
5.0 NRC Staff Status During the period The inspection staff at Pilgrim during the report period consisted of the following:
Clay Warren ---
Senior Resident Inspector Jeffrey Lyssh ---
Resident Inspector Tae Kim ---
Resident Inspector OFFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0005.0.0 07/08/88
- -D - . . . , - ,
. s.
Enclosure 3' Two- region-based specialist inspectors were onsite during' the weeks of' June 20 and June 27, 1988, to review the licensee's corrective actions -on previous electrical inspection findings. a resident inspector from the . Yankee Rowe. facility was onsite In - addi during ti or. . . the week of
' June 27, 1988 to assist the resident inspectors. The results of these-inspection activities:will be documented _in the NRC inspection reports 50-293/88-23 and 50-293/88-25, respectively.
1 0FFICIAL RECORD COPY PILGRIM STATUS 6/18-7/1/88 - 0006.0.0 07/08/88