ML20151B050

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-245/88-07 on 880426-0606.No Violations Noted.Discusses Concerns Re Adherence to ACP-QA-4.03B, Matl Equipment Parts Lists
ML20151B050
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/01/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20151B053 List:
References
NUDOCS 8807200217
Download: ML20151B050 (2)


See also: IR 05000245/1988007

Text

_.

., . .

,

.k

'

,_

.', .

.

.

Docket / License: 50-245/DPR-21 JUL 911968

Northeast Nuclear Energy Company '

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut 06101-0270

Gentlemen:

Subject: Millstone 1 Inspection 50-245/88-07 (4/26/88 to 6/6/88)

,

.This forwards the report for the above subject resident inspection of '

Millstone 1. The inspection results have been discussed with Mr. J. Stetz {

of your staff,

l

l

We identified a concern involving adherence to ACP-QA-4.03B, "Material Equipment '

Parts List." The ACP requires verification within sixty days and prior to an

evaluation's incorporation into the MEPL. It nonetheless appears that the

diesel generator speed switch was cl.issified as a non-QA part in October of

1986 and this evaluation was not verified until May .1988. We have classified

this matter as unresolved pending further review. The associated safety and

performance significance is increased, in our view, by the NNECO verifying

engineer's response statement (Report Detail 8.2) that there were no procedural

requirements relating to the time interval between a MEPL determination and its

verification.

Your cooperation with us is appreciated.

31ncerely,

OrisinalSiS" dDYI

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor orojects

Enclosure: NRC Region I Inspection Report 50-245/88-07

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Station Superintendent

Public Document Room (PDR)

local Put,lic Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

0FFICIAL. RECORD COPY IR MILL 1 88-07 - 0001.0.0

11/29/80

8807200217 880701 g.1g- g l _ k

PDR ADOCK 05000245 p \

\

Q PDC

e

. . _ _ . . - _-.- . - . . -- .. -. . ._

' * -

.

.  ;

. .. . l'

.

'

Northeast Nuclear Energy'Co. 2

'01 JULl988

bec w/ enc 1:

~ Region I Docket Room (with concurrences)

Management' Assistant, DRMA (w/o enclosures)

DRP Section Chief

M. Boyle,' LPM,' NRR-

R. Bores, DRSS ,

R. Keimig, DRSS

Chief, Vendor Inspection Branch, NRR (See Detail 6.0)

i

-l

1

@k 9

RI:DdP RI:DRP :DR

RAYMOND MCCABE BETTENHAUSEN i

/88 4It 7/,// glt'

,

OFFICIAL RECORD CODY IR MILLI 88-07 - 0001.1.0

11/29/80

, 4

3

\

I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _