Text
_
,'
'*
..
.
.
,
7
b
'
JUL 0 71988
.
Docket No. 50-333
License No OPR-59
Power Authority of- the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. Radford J. Converse
Resident Manager
P. D. Box 41
Lycoming, New York 13093
Gentlemen:
Subject:
Inspection No. 50-333/88-07
To verify the Emergency Response Facilities (ERFs) at licensed nuclear power
plants meet the requirements of 10 CFR 50.47(b), Appendix E of 10 CFR Part 50,
and orders issued to implement Supplement 1 to NUREG-0737, the NRC cor ; cts
special appraisals of these facilities.
During the period of May 16-20, 1988, the NRC conducted a special ERF Appraisal
at the FitzPatrick Nuclear Power Plant, authorized by NRC Operating License No.
DPR-59. Areas examined during the appraisal are described in the NRC Region I
inspection report which is enclosed with this letter. Within.these areas, the
inspection consisted of selective examination of procedures and representative
records, the ERFs and related equipment, interviews with personnel and observation
of the 1988 emergency exercise by appraisal team members.
Based on the results of this inspection, it appears that one of your activities
was not conducted in accordance with your commitments made in a letter dated
April 15, 1983, to abide by certain criteria set forth in NUREG-0737, Supplement
1.
In accordance with the "General Statement of Policy and Procedure for NRC
Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1988), the
deviation is set forth in the enclosed Notice of Deviation (Appendix A). .You
,
are requested to respond to this letter and in preparing your response, you
j
should follow the instructions in Appendix A.
The appraisal also indicates
!
that several areas were found to be incomplete and will be reinspected, along
l
with other areas of concern.
These findings are listed in Appendix B, Appraisal
Open Items.
Please advise us within 45 days of the date of this letter of -
action you plan to take, showing the estimated date of completion with regard
to the findings identified in Appendix B. (Note: Response to the Notice of
Deviation is required within 30 days of the date of this letter.)
The findings also indicate that there are items in your emergency preparedness
program which need improvement. These items are identified in the text of the
enclosed inspection report.
These improvements are areas which, based upon
professional judgement, require your review and consideration.
OFFICIAL RECORD COPY
IR FITZ 88-07 - 0001.0.0
k
8807200195 880707
N
ADOCK 05000333
b
Q
I
. i me
- - - - - - .
- -
-
- -
-
- -
. -
-
-
- -
. - - -
. - - . - - - -
- -
- - - - - - - -
. -
- -
-
-
- - - -
-
- - - -
- - - - - - -
-
-
- - -
- - -
- ..
-
-
.
..
,
.
Power Authority of the State of
2
JUL 0 7198g
-
of New York
,
,
The response requested by this letter and the accompanying _ Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-5111.
<
Your cooperation with us in this matter is appreciated. Should you have any
questions concerning this letter, please contact us.
Sincerely,
Orignal Signed By:
Renald R. Bellamy
Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety-
and Safeguards
Enclosures:
1.
Appendix A Notice of Deviation
2.
Appendix B Appraisal Open Items
3.
NRC Region I Inspection Report No. 50-333/88-07
cc w/encls:
J. Phillip Bayne, President
Mr. John C. Brons, Executive Vice President
A. Klausmann, Senior Vice President - Appraisal and Complian'ce Services
R. L. Patch, Quality Assurance Superintendent
George M. Wilverding, Manager Nuclear Safety Evaluation
Gerald C. Goldstein, Assistant General Counsel
R. E. Beedle, Vice President Nuclear Support
S. S. Zulla, Vice President Nuclear Engineering
R. Burns, Vice President Nuclear Operation
Dept. of Public Service, State of New York
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
"
FEMA Region II
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
Section Chief, DRP
W. Travers, NRR, PEPB
Robert J. Bores, DRSS
auc*
ge t . I b n "
gh ^
RI:0RSS
/
PB
RI:0RSS
Jr
Lazaru g F
ravers
Bellamy
,
7/G /88
7/ 7 /88
7/[/88
7/ ~)/88
0FFICIAL RECORD COPY
IR FITZ 88 07 - 0002.0.0
07/06/88
,