Text

_ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

5 l

l'

!~9 MAR 1988 J

Docket Nos.

50-277 50-278 4

Philadelphia Electric Company ATTN: Mr. J. S. Kemper, Sr.

Senior Vice President-Nuclear l

2301 !4rket Street Philadelphia, Pennsylvania.19101 Gentic,rnen:

l

Subject:

Additional Information on IEB 85-03 This letter transmits a request for additional information needed by the NRC to evaluate valve operability considerations in accordance with IEB 85-05, "Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings."

l To facilitate NRC review, we are requesting that you supplement your response i

to IEB 85-03 with the information identified in the enclosure to this letter.

Please make your submittal within one month of the date of this letter, if practicable.

If development and submittal of the information will take longer, please make an interim submittal ir. one month, including reasons for the delay and your schedule for providing the remaining information.

3 I

Please send your submittal to the NRC Document Control Oesk, with copies to this office and the NRR Division of Operational Events Assessment, i-l Thank you for your cooperation.

i Sincerely, l

i M 9FI 4

I l

Edward C. Wenzinger, Chief l

Projects Branch No. 2 l

Division of Reactor Projects l

Enclosure:

Request for Additional Information (RAI) i i

h!k DON 0 7

G l

OFFICIAL RECORD COPY IEB 85-03/PB ADDITIONAL INFO -

0001.0.0 i

03/29/88

//

%ol I

\\

,s Philadelphia Electric Company 2

g cc w/ enc 1:

J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Af f airs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP Robert J. Bores, DRSS 2,3 e

RI:DRP gjp)

RI],DRP

' e (QRF) 46ger Wil l i ams/ rh1 Linville 3/r;/88 3/JI/88 3

/83 0FFICIAL RECORD COPY IEB 85-03/PB ADDITIONAL INFO -

0002.0.0 03/25/88

c s

Pa s;e 1 of 2 im p 38 REQUEST FOR ADDITIONAL INFORMATION (RAI) RE:

Review of Responses to Action Item e of IE Bulletin 85-03 Licensee:

Unit (s): Peach Bottom 2,3 Philadelphia Electric Company Date of Response 06-02-86 2301 Market Street 07-29-86 P. O. Box 8699 10-02-86 Philadelphia, PA 19101 11-03-86 (2 pages) 11-03-86 (10 pages) 01-21-88 Respondent:

John S. Kemper, Vice-President Engineering and Research The information provided in your response to Action Item e of IE Bulletin 85-03 was found to be deficient in some areas.

Provide the add. tonal information necessary to resolve the following come.ats aed questions:

1. Revise Table 1 of the response dated 01-21-88 to include separate values of differential pressure for opening and closing the MOVs, as required by Action Item a of the bulletin.
2. Revise Table 1 of the response dated 01-21-88 to include the RCIC Trip and Throttle Valve, or justify its exclusion.

This valve is shown as a MOV on FSAR Figure 4.7.1B Sheet 1 Revision 4, 01/86, and as MOV I on Page 74 of the Bk'ROG Report.

3. The response of 01-21-88 indicates that MOYATS has been included in the MOV testing program.

If MOVATS is planned for application to some MOVs which are not included in its data base, commit to and describe an alternate method for determining the extra thrust necessary to overcome pressure differentials for these valves.

4. The proposed program for action items b, e and d of the bulletin is incomplete.

Provide the following details as a minimum (a) commitment to a training program for setting switches and maintaining valve operators.

(b) commitment to justify continued operation of a valve determined to be inoperable,

..s

/

if : ' ;,- 1333 Page 2 of 2 RAI for Peach Bottom 2,3 (c) description of a method possibly needed to extrapolate valve stem thrust determined by testing at less than maximum differential pressure, (d) justification of a possible alternative to testing at maximum differential pressure at the plant, (e) consideration of pipe break conditions as required by the bulletin, and (f) stroke testing when necessary to meet bulletin requirements.